A photograph of Anton Tritt from the Buchan Group leading an architecture tour at Re:START mall. The event was part of FESTA 2012.
A photograph of Anton Tritt from the Buchan Group leading an architecture tour at Re:START mall. The event was part of FESTA 2012.
A photograph of people gathered at Re:START mall for an architecture tour by Anton Tritt of the Buchan Group. The event was part of FESTA 2012.
A photograph of people gathered at Re:START mall for an architecture tour by Anton Tritt of the Buchan Group. The event was part of FESTA 2012.
A photograph of Anton Tritt from the Buchan Group leading an architecture tour at Re:START mall. The event was part of FESTA 2012.
This week marked the 4th anniversary of the Christchurch and Canterbury earthquake. New research from the University of Otago in Christchurch with earthquake survivors is shedding some light on the question of what makes some people cope better with trauma than others. A group of psychiatrists and psychologists from the University have been studying a group of more than 100 Cantabrians exposed to high levels of stress during the earthquakes who coped well. They compared this group against a group of patients with post-earthquake trauma, being treated by the Adult Specialist Services Earthquake Treatment Team, or ASSETT, set up by the Canterbury DHB. Dr Gini McIntosh from the Otago University is part of the research team, and one of the psychologists with ASSETT.
A photograph of FESTA director Jessica Halliday with Anton Tritt of the Buchan Group during an architecture tour at Re:START mall. The event was part of FESTA 2012.
The new Cabinet is reportedly considering a rebuild plan for the Christchurch Cathedral, damaged in the 2011 earthquake. Supporters of restoring the cathedral say the signs are promising.
The Earthquake Commission has brought forward its deadline for repairing thousands of earthquake-damaged properties in Canterbury by 12 months.
It now seems unlikely that engineers involved in the most serious building collapse of the Christchurch earthquake will face any external action, with the profession's administrators telling the Government there's nothing more they can do.
Lyttelton musical group, The Eastern, performing for students.
Lyttelton musical group, The Eastern, performing for students.
Lyttelton musical group, The Eastern, performing for students.
An entry from Deborah Fitchett's blog for 9 September 2010, posted to Dreamwidth. The entry is titled, "In which she would have preferred being in the control group".The entry was downloaded on 17 April 2015.
An entry from Deborah Fitchett's blog for 9 September 2010, posted to Livejournal. The entry is titled, "In which she would have preferred being in the control group".The entry was downloaded on 14 April 2015.
A photograph of Anton Tritt from the Buchan Group on the balcony of the Crafted Coffee Company during an architecture tour at Re:START mall. The event was part of FESTA 2012.
A video of an interview with Mark Yetton, Engineering Geologist at the Port Hills Geotech Group, about their work to assess the risk of rock fall and cliff collapse on the Christchurch Port Hills.
A graph showing population change in Christchurch by age group.
A photograph of a group of workers crossing High Street.
A photograph captioned by Paul Corliss, "Rapaki Property Group building".
A photograph captioned by Paul Corliss, "Rapaki Property Group building".
A photograph captioned by Paul Corliss, "Rapaki Property Group building".
A photograph captioned by Paul Corliss, "Rapaki Property Group building".
A photograph captioned by Paul Corliss, "Rapaki Property Group building".
A photograph captioned by Paul Corliss, "Rapaki Property Group building".
A photograph captioned by Paul Corliss, "Rapaki Property Group building".
A photograph captioned by Paul Corliss, "Rapaki Property Group building".
A paper which outlines what had been achieved by SCIRT's Training Team, and proposing an approach to ensure that the learnings from SCIRT be transferred to wider industry.
A diagram which illustrates the proposed structure of an industry-wide training advisory board.
A presentation prepared for the SCIRT board which outlines the need to pursue the establishment of an industry-wide training advisory board.