Search

found 138 results

Images, eqnz.chch.2010

20130808_2296_1D3-40 New Brighton bridge Prior to the earthquakes the stone wall at right was near road level. Now it is about 1.5m (4-5ft) lower. #4075

Images, eqnz.chch.2010

20130808_2288_1D3-40 Awaiting demoloition Two relatively new town houses in the Bexley "Red Zone". Awaiting demolition due to severe land problems. Have been vandalised. #4073

Images, eqnz.chch.2010

Prior to the earthquakes (mainly the February 22 2011 event) this park bench was at track level. Shortly after the February quake someone in the council did the sums and realised that the area near the Avon River had dropped between a metre and 1.4m (about 4 foot), so a rush job by contractors shifted in many tonnes of rock and gravel to raise a...