Search

found 230 results

Images, eqnz.chch.2010

20130808_2293_1D3-40 New Brighton bridge Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage. #4074

Images, eqnz.chch.2010

20130808_2296_1D3-40 New Brighton bridge Prior to the earthquakes the stone wall at right was near road level. Now it is about 1.5m (4-5ft) lower. #4075

Images, eqnz.chch.2010

20130808_2288_1D3-40 Awaiting demoloition Two relatively new town houses in the Bexley "Red Zone". Awaiting demolition due to severe land problems. Have been vandalised. #4073

Images, eqnz.chch.2010

20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...

Images, eqnz.chch.2010

20160104_1602_7D2-20 Porritt Park Porritt Park was, before the earthquakes, the headquarters of hockey in this region. Two astro-turf fields (the main one was to the left of the building), and corporate offices etc. The earthquakes buckled all the playing surfaces and damaged the buildings; a couple of smaller ones have been removed. Hocke...

Images, eqnz.chch.2010

A bit of the now demolished QEII (Queen Elizabeth II) Park running track in the "Gap Filler" on the old Deka site in New Brighton (last occupied by a charity barn before a major fire and subsequent demolition).

Images, eqnz.chch.2010

20120529_5558_1D3-400 Waters Edge Demolition [Explored] Demolition of the relatively new seven-storey Waters Edge Apartments in Ferrymead continues. CERES Environmental NZ are doing the job for CERA (Canterbury Earthquake Recovery Authority). Some will be pleased to see this block go as there was lot of resentment to it being built on the site...