Search

found 9506 results

Images, UC QuakeStudies

The north end of the bridge on Gayhurst Road. During the earthquake, the bridge was forced about 15 centimetres towards the river, the land falling away under the road. Fencing has been placed around the footpath, and the road filled and resealed so that it can still be used by traffic.

Images, UC QuakeStudies

A photograph looking down Poplar Lane from behind the cordon on Tuam Street. Fallen bricks and building rubble litter the footpaths. To the left the earthquake damage to Plume can be seen. The front wall of the corner has crumbled, taking the awning with it. Mannequins can still be seen hanging in the window.

Images, UC QuakeStudies

Former Chancellor Rex Williams addressing students inside the UCSA's "Big Top" tent. The tent was erected in the UCSA car park to provide support for students in the aftermath of the 22 February 2011 earthquake. The students have spent the day clearing liquefaction from Christchurch properties as part of the Student Volunteer Army.

Images, UC QuakeStudies

Water tanks on the Sumner Esplanade. Both have prominent notices advising that water must be boiled before use. On one tank is a notice advertising a community hub where residents can get assistance, and on the other is written "Free use of for Christchurch earthquake. Please return to Wymers Domestic Water Carriers, Hamilton".

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "Central Library Peterborough was opened to provide a place for library services in the central city. It is stocked with the books that were on circulation when the earthquake happened, as the majority of the Central Library book stock is still inaccessible in the Gloucester Street building".

Research papers, The University of Auckland Library

The connections between walls of unreinforced masonry (URM) buildings and flexible timber diaphragms are critical building components that must perform adequately before desirable earthquake response of URM buildings may be achieved. Field observations made during the initial reconnaissance and the subsequent damage surveys of clay brick URM buildings following the 2010/2011 Canterbury, New Zealand earthquakes revealed numerous cases where anchor connections joining masonry walls or parapets with roof or floor diaphragms appeared to have failed prematurely. These observations were more frequent for the case of adhesive anchor connections than for the case of through-bolt connections (i.e. anchorages having plates on the exterior façade of the masonry walls). Subsequently, an in-field test program was undertaken in an attempt to evaluate the performance of adhesive anchor connections between unreinforced clay brick URM walls and roof or floor diaphragm. The study consisted of a total of almost 400 anchor tests conducted in eleven existing URM buildings located in Christchurch, Whanganui and Auckland. Specific objectives of the study included the identification of failure modes of adhesive anchors in existing URM walls and the influence of the following variables on anchor load-displacement response: adhesive type, strength of the masonry materials (brick and mortar), anchor embedment depth, anchor rod diameter, overburden level, anchor rod type, quality of installation and the use of metal foil sleeve. In addition, the comparative performance of bent anchors (installed at an angle of minimum 22.5o to the perpendicular projection from the wall surface) and anchors positioned horizontally was investigated. Observations on the performance of wall-to-diaphragm connections in the 2010/2011 Canterbury earthquakes and a snapshot of the performed experimental program and the test results are presented herein. http://hdl.handle.net/2292/21050

Research papers, The University of Auckland Library

The Canterbury earthquakes in New Zealand caused significant damage to a number of reinforced concrete (RC) walls and subsequent research that has been conducted to investigate the design provisions for lightly reinforced RC walls and precast concrete wall connection details is presented. A combination of numerical modelling and large-scale tests were conducted to investigate the seismic behaviour of lightly RC walls. The model and test results confirmed the observed behaviour of an RC wall building in Christchurch that exhibited a single flexural crack and also raised questions regarding the ability of current minimum reinforcement requirements to prevent the concentration of inelastic deformation at a small number of flexural cracks. These findings have led to changes to the minimum vertical reinforcement limits for RC walls in in the Concrete Structures Standard (NZS 3101:2006), with increased vertical reinforcement required in the end region of ductile RC walls. An additional series of wall tests were conducted to investigate the seismic behaviour of panel-to-foundation connections in singly reinforced precast concrete panels that often lack robustness. Both in-plane and out-of-plane panel tests were conducted to assess both grouted connections and dowel connections that use shallow embedded inserts. The initial test results have confirmed some of the previously identified vulnerabilities and tests are ongoing to refine the connection designs. http://www.aees.org.au/downloads/conference-papers/2015-2/

Research papers, Victoria University of Wellington

There are many swaths of land that are deemed unsuitable to build on and occupy. These places, however, are rarely within an established city. The Canterbury earthquakes of 2010 and 2011 left areas in central Christchurch with such significant land damage that it is unlikely to be re-inhabited for a considerable period of time. These areas are commonly known as the ‘Red Zone’.This thesis explores redevelop in on volatile land through innovative solutions found and adapted from the traditional Indonesian construction techniques. Currently, Indonesia’s vernacular architecture sits on the verge of extinction after a cultural shift towards the masonry bungalow forced a rapid decline in their occupation and construction. The 2004 Indian Ocean earthquake and tsunami illustrated the bungalows’ poor performance in the face of catastrophic seismic activity, being outperformed by the traditional structures. This has been particularly evident in the Rumah Aceh construction of the Aceh province in Northern Sumatra. Within a New Zealand context an adaptation and modernisation of the Rumah Aceh construction will generate an architectural response not currently accepted under the scope of NZS 3604:2011; the standards most recent revision following the Canterbury earthquake of 2010 concerning timber-based seismic performance. This architectural exploration will further address light timber structures, their components, sustainability and seismic resilience. Improving new builds’ durability as New Zealand moves away from the previously promoted bungalow model that extends beyond residential and into all aspects of New Zealand built environment.

Images, UC QuakeStudies

A member of the Los Angeles County Fire Department Search and Rescue Team looking at the maps at the entrance to 'Camp Hollywood', the headquarters of the American Civil Defence Forces in Latimer Square. After the 22 February 2011 earthquake, emergency service agencies set up their headquarters in Latimer Square.

Images, UC QuakeStudies

The entrance to 'Camp Hollywood', the American Civil Defence Force headquarters in Latimer Square. After the 22 February 2011 earthquake, emergency service agencies set up their headquarters in Latimer Square. The entrance way has a wooden sign reading, "Camp Hollywood" and a series of maps of Christchurch and New Zealand.

Images, UC QuakeStudies

A member of the Los Angeles County Fire Department Search and Rescue Team looking at the maps at the entrance to 'Camp Hollywood', the headquarters of the American Civil Defence Forces in Latimer Square. After the 22 February 2011 earthquake, emergency service agencies set up their headquarters in Latimer Square.

Images, UC QuakeStudies

The Taiwanese Search and Rescue team (USAR) being farewelled at the Christchurch International Airport after helping out with the emergency response to the Canterbury Earthquake. In the centre is Rob Saunders from the New Zealand Fire Department, and on the right is Kao Wei, Team Leader of the Taiwan USAR team.

Images, UC QuakeStudies

The damaged Cranmer Courts on the corner of Kilmore and Montreal Streets. The corner of the building has crumbled onto the street, which is now littered with broken masonry. Wire fencing placed around the building after the 4 September 2010 earthquake has managed to keep the debris away from the road.

Images, UC QuakeStudies

Prime Minister John Key preparing for a photograph with Al Dwyer, the leader of the USAID Disaster Assistance Response Team (DART), and members of DART, outside the US headquarters in Latimer Square. Latimer Square was set up as a temporary headquarters for emergency managements personnel after the 22 February 2011 earthquake.

Images, UC QuakeStudies

An image from a Army News March 2011 photo compilation titled, "All in a Days Work". The image is captioned, "A container of equipment is off-loaded from a C-130 Hercules". This equipment is a generator sent down from Auckland to support Christchurch after the 22 February 2011 earthquake.

Images, UC QuakeStudies

An image from a Army News March 2011 article titled, "An Army Being Led to Win". The image shows Defence Force personnel during an operational tour of Lyttelton taken by Commander Joint Forces, Air Marshal Peter Stockwell and Chief of Army Tim Keating to view the aftermath of the Christchurch Earthquake.

Articles, UC QuakeStudies

A press release from the United States Embassy New Zealand about the US-NZ Partnership Forum which was interrupted by the 22 February 2011 earthquake in Christchurch. Two months later, delegates from both New Zealand and the United States met in a video conference session designed to conclude the forum.

Images, UC QuakeStudies

Personnel from the Los Angeles County Fire Department, the Singapore Army, the New Zealand Police, the New Zealand Urban Search and Recue Team, and St John, paying their respects to the people who lost their lives during the 22 February 2011 earthquake at a memorial of flowers in Cathedral Square.

Images, UC QuakeStudies

Prime Minister John Key talking to members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake. Canterbury Recovery Minister Gerry Brownlee is standing behind him.

Images, UC QuakeStudies

A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. the ceiling of the building has been braced with scaffolding. Wire fencing and police tape has been placed around the building as a cordon.

Images, UC QuakeStudies

An attendee of the 2011 United States New Zealand Partnership Forum outside the Christchurch Art Gallery. In the background, members of Civil Defence have gathered after an aftershock hit during one of their briefings. The Christchurch Art Gallery served as the headquarters for Civil Defence after the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of earthquake repairs underway in the quad of Christ's College on Rolleston Avenue. A sign on the gate read, "Quake repairs, keep out". Tape reading, "Danger keep out" has been draped across both gates . In the background is a crane, several workers in high-visibility clothing, and building supplies.

Images, UC QuakeStudies

A photograph of the intersection of High, Lichfield, and Manchester Streets, taken from the corner of High and Lichfield Streets. Emergency management personnel are sitting and standing in front of wire fences which are blocking off the intersection. In the background several excavators are clearing rubble from earthquake-damaged buildings.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Registry Building on the corner of Montreal and Worcester Streets. Masonry around the gable has collapsed onto the footpath below. Steel bracing has been used to hold up the remaining masonry. Wire fencing has been placed around the building as a cordon.

Images, UC QuakeStudies

A photograph of volunteers from the Wellington Emergency Management Office working at the reception in Cowles Stadium on Pages Road. The stadium was set up by Civil Defence as temporary accommodation for citizens displaced by the 4 September 2010 earthquake. One of the volunteers is holding a cat in a carrier.

Images, UC QuakeStudies

A photograph of a package full of blankets from the International Federation of Red Cross and Red Crescent Societies, sitting under a table in Cowles Stadium. The stadium served as temporary accommodation for refugees from the 4 September earthquake. These blankets were given to people whose belongings were destroyed or unreachable.