Search

found 9506 results

Images, UC QuakeStudies

A photograph of the earthquake damage to the second story of the Observatory tower at the Christchurch Arts Centre. The front of the storey has collapsed, exposing the inside. A tarpaulin has been draped over the top and the roof of the building behind.

Images, UC QuakeStudies

Jess Hollis, a member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. Jess, with my desk behind".

Research papers, The University of Auckland Library

The connections between walls of unreinforced masonry (URM) buildings and flexible timber diaphragms are critical building components that must perform adequately before desirable earthquake response of URM buildings may be achieved. Field observations made during the initial reconnaissance and the subsequent damage surveys of clay brick URM buildings following the 2010/2011 Canterbury, New Zealand earthquakes revealed numerous cases where anchor connections joining masonry walls or parapets with roof or floor diaphragms appeared to have failed prematurely. These observations were more frequent for adhesive anchor connections than for through-bolt connections (i.e. anchorages having plates on the exterior façade of the masonry walls). Subsequently, an in-field test program was undertaken in an attempt to evaluate the performance of adhesive anchor connections between unreinforced clay brick URM walls and roof or floor diaphragms. The study consisted of a total of almost 400 anchor tests conducted in eleven existing URM buildings located in Christchurch, Whanganui and Auckland. Specific objectives of the study included the identification of failure modes of adhesive anchors in existing URM walls and the influence of the following variables on anchor load-displacement response: adhesive type, strength of the masonry materials (brick and mortar), anchor embedment depth, anchor rod diameter, overburden level, anchor rod type, quality of installation and the use of metal mesh sleeve. In addition, the comparative performance of bent anchors (installed at an angle of minimum 22.5o to the perpendicular projection from the wall surface) and anchors positioned horizontally was investigated. Observations on the performance of wall-to-diaphragm connections in the 2010/2011 Canterbury earthquakes, a snapshot of the performed experimental program and the test results and a preliminary proposed pull-out capacity of adhesive anchors are presented herein.

Research papers, The University of Auckland Library

The connections between walls of unreinforced masonry (URM) buildings and flexible timber diaphragms are critical building components that must perform adequately before desirable earthquake response of URM buildings may be achieved. Field observations made during the initial reconnaissance and the subsequent damage surveys of clay brick URM buildings following the 2010/2011 Canterbury, New Zealand earthquakes revealed numerous cases where anchor connections joining masonry walls or parapets with roof or floor diaphragms appeared to have failed prematurely. These observations were more frequent for adhesive anchor connections than for through-bolt connections (i.e. anchorages having plates on the exterior façade of the masonry walls). Subsequently, an in-field test program was undertaken in an attempt to evaluate the performance of adhesive anchor connections between unreinforced clay brick URM walls and roof or floor diaphragm. The study consisted of a total of almost 400 anchor tests conducted in eleven existing URM buildings located in Christchurch, Whanganui and Auckland. Specific objectives of the study included the identification of failure modes of adhesive anchors in existing URM walls and the influence of the following variables on anchor load-displacement response: adhesive type, strength of the masonry materials (brick and mortar), anchor embedment depth, anchor rod diameter, overburden level, anchor rod type, quality of installation and the use of metal mesh sleeve. In addition, the comparative performance of bent anchors (installed at an angle of minimum 22.5o to the perpendicular projection from the wall surface) and anchors positioned horizontally was investigated. Observations on the performance of wall-to-diaphragm connections in the 2010/2011 Canterbury earthquakes, a snapshot of the performed experimental program and the test results and a preliminary proposed pull-out capacity of adhesive anchors are presented herein. http://www.confer.co.nz/nzsee/ VoR - Version of Record

Images, UC QuakeStudies

The Cathedral of the Blessed Sacrament on Barbadoes Street, severely damaged after the 22 February 2011 earthquake. The domes on either side of the Cathedral have collapsed and are lying in the area in front. To the right, a crushed car can just be seen.

Images, UC QuakeStudies

The Cathedral of the Blessed Sacrament on Barbadoes Street, severely damaged after the 22 February 2011 earthquake. The domes on either side of the Cathedral have collapsed and are lying in the area in front. To the right, a crushed car can just be seen.

Images, UC QuakeStudies

Al Dwyer, leader of the USAID Disaster Assistance Response Team (DART), outside the US headquarters in Latimer Square. Members of DART can be seen behind him. Latimer Square was set up as a temporary headquarters for emergency management personnel after the 22 February 2011 earthquake.

Images, UC QuakeStudies

Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of the largest section of the Townsend Telescope recovered from the rubble of the Observatory tower. The telescope was housed in the tower at the Christchurch Arts Centre. It was severely damaged when the tower collapsed during the 22 February 2011 earthquake.

Images, UC QuakeStudies

A member of the New Zealand Police photographed with Don Mahlke, a fire fighter from the Los Angeles County Fire Department in the United States. Mahlke travelled to New Zealand to help out with the search and rescue response to the 22 February 2011 earthquake.

Images, UC QuakeStudies

A member of the New Zealand Police photographed with a member of the Los Angeles County Fire Department. Personnel from the Los Angeles County Fire Department travelled to New Zealand to help out with the search and rescue response to the 22 February 2011 earthquake.

Articles, UC QuakeStudies

A PDF copy of a proposal prepared by Anglican Advocacy (formerly the Anglican Life Social Justice Unit) and Te Whare Roimata to MBIE and CERA in 2012. The report outlines how social housing could look in Christchurch's Inner City East following the Christchurch earthquakes.

Images, UC QuakeStudies

A photograph of volunteers from the Wellington Emergency Management Office being photographed in front of a truck. The volunteers are preparing to travel to Christchurch to help out after the 22 February 2011 earthquake. In the background is the Wellington Emergency Management Office building.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office at a graduation ceremony in the Wellington Town Hall. The volunteers were awarded certificates of appreciation at the ceremony, for their work in the emergency response to the 22 February 2011 earthquake in Christchurch.

Images, UC QuakeStudies

A photograph of a member of the Wellington Emergency Management Office Emergency Response Team walking across Manchester Street. In the background is a block of earthquake-damaged buildings. Large sections of the buildings have collapsed and the rubble has spilled onto the street below.

Images, UC QuakeStudies

A photograph of the earthquake damage to St Paul's School in Dallington. Large cracks can be seen in the surface of the asphalt. Silt from liquefaction is visible in front of the school buildings. Tape has been placed on the building to keep people away.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Cranmer Courts on the corner of Montreal and Kilmore Streets. One of the gables of the section of the building on the corner has crumbled. Ties have been placed around all of the gables as bracing.

Images, UC QuakeStudies

A photograph of a portable shower unit set up in Hagley Park for the emergency management personnel who travelled to Christchurch after the 22 February 2011 earthquake. A clothes line has been set up by tying ropes to the shower unit and a digger.

Images, UC QuakeStudies

A photograph looking north-west down High Street towards the intersection with Manchester Street. Rubble from several earthquake-damaged buildings lines both sides of the street. In the distance members of the Wellington Emergency Management Office Emergency Response Team and several excavators are working.