A photograph of Whole House Reuse item 43. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 322. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 290. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 68. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of the DJs at the Super WOW Disco. This event was held at Gap Filler's Dance-O-Mat and was part of FESTA 2014.
A photograph of Whole House Reuse item 124. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A sign in the Lyttelton Cemetery reading, "Hazard. Many of the headstones and monuments in this cemetery are unstable due to the recent earthquake. Please proceed with caution when entering the cemetery".
A photograph captioned by BeckerFraserPhotos, "Moira Fraser standing beside this pole to show the normal height for the marker with two round luminous spots which is at ground level in the previous photo".
A photograph captioned by BeckerFraserPhotos, "Union Church, Winchester Street, Lyttelton. This is the only church left standing in Winchester Street and we have heard that its future is not certain".
A photograph of a sign on the counter of Sophie's Café on Papanui Road. The sign reads, "Please be nice to my staff. This is all I have left - the rest bolted".
A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A plan which identifies items that will define value for the programme of work and explain processes that will measure the achievement of value outcomes. The first version of this plan was produced on 6 September 2011.
The empty site of the Crowne Plaza Hotel, now demolished. Wire fencing surrounds the property. This is where the Pallet Pavilion is to be built. In the background, the Crowne Plaza can be seen.
A photograph captioned by BeckerFraserPhotos, "A stretch of newly laid pavement on Manchester Street which signals the City Council's intent to open up the cordon in this area soon".
The memorial blanket in progress. This blanket was created by members of the Lyttelton community, with the iconic felt hearts that were created after the earthquake as well as depictions of some of the buildings lost during the earthquake in Lytteton.
A photograph of Whole House Reuse item 105. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 62. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 431. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 392. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 451. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 391. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 440. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 294. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
People walk down the newly re-opened Colombo Street. In the distance, Mike Hewson's installation "Deconstruction" can be seen on the walkway between Ballantynes and The Crossing. This artwork gives the illusion that the walkway has been removed.
People walk down the newly re-opened Colombo Street. In the distance, Mike Hewson's installation "Deconstruction" can be seen on the walkway between Ballantynes and The Crossing. This artwork gives the illusion that the walkway has been removed.
People walk down the newly re-opened Colombo Street. In the distance, Mike Hewson's installation "Deconstruction" can be seen on the walkway between Ballantynes and The Crossing. This artwork gives the illusion that the walkway has been removed.
A photograph of street art on a building in New Brighton. The artwork includes the words, "We still love this place".
Fairway to heaven', number 70 in Gap Filler's Gap Golf course. This is the last hole in Gap Golf. It was built out of green felt, polystyrene, wooden pallets and rubber piping.
The memorial blanket in progress. This blanket was created by members of the Lyttelton community, with the iconic felt hearts that were created after the earthquake as well as depictions of some of the buildings lost during the earthquake in Lytteton.