A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.
A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.
A woman says to a builder 'Christchurch people will really appreciate your help to rebuild - What you construct looks like it's already been hit by an earthquake'. They are standing in front of a very shoddily-built cottage and the garden is festooned with litter. Context - After the Christchurch earthquakes there is a huge emphasis on fast rebuilding with the potential for below standard results.. Quantity: 1 digital cartoon(s).
Recent advances in timber design at the University of Canterbury have led to new structural systems that are appropriate for a wide range of building types, including multi-storey commercial office structures. These buildings are competitive with more traditional construction materials in terms of cost, sustainability and structural performance. This paper provides seismic design recommendations and analytical modelling approaches, appropriate for the seismic design of post-tensioned coupled timber wall systems. The models are based on existing seismic design theory for precast post-tensioned concrete, modified to more accurately account for elastic deformation of the timber wall systems and the influence of the floor system. Experimental test data from a two storey post-tensioned timber building, designed, constructed and tested at the University of Canterbury is used to validate the analytical models.
The 2010 Darfield earthquake is the largest earthquake on record to have occurred within 40 km of a major city and not cause any fatalities. In this paper the authors have reflected on their experiences in Christchurch following the earthquake with a view to what worked, what didn’t, and what lessons can be learned from this for the benefit of Australian earthquake preparedness. Owing to the fact that most of the observed building damage occurred in Unreinforced Masonry (URM) construction, this paper focuses in particular on the authors’ experience conducting rapid building damage assessment during the first 72 hours following the earthquake and more detailed examination of the performance of unreinforced masonry buildings with and without seismic retrofit interventions.
An aerial photograph of the Christchurch central city. The photograph has been captioned by BeckerFraserPhotos, "This photograph shows nearly all of the CBD. The two streets which are prominent in this photograph are Manchester Street on the left and Colombo Street on the right of the photograph. This photograph is from the north, looking towards the southern part of the city. Cathedral Square is about half way up, towards the right. It shows the extent of demolition that has happened already close to the river and near the Manchester/Gloucester Street intersection where there is a lot of bare land surrounding Radio Network House".
Text at the top of the cartoon reads 'NZ city strengthening?' A whole city enclosed in a glass dome and balanced on huge springs intended to make it earthquake resistant rocks as another aftershock hits. Context - Two earthquakes and hundreds of aftershocks have hit Christchurch, the first on 4 September 2010 and a second more devastating one on 22 February 2011. There has been great emphasis on making heritage buildings that are rebuilt and all new buildings earthquake resistant. The example in the cartoon is perhaps a Springs-with-damper base isolator. Quantity: 1 digital cartoon(s).
The cartoon shows a daffodil blooming in an earthquake fissure with the wrecked buildings of Christchurch in the background. Context: September 4th is the anniversary of the first quake. Many people in Christchurch are still living in houses that may yet be red stickered (condemned) and many city buildings are still out of bounds, either condemned to destruction or rebuilt after the earthquakes of September 4th 2010 and February 22nd and June 13th 2011. But the return of spring maybe brings a sense of encouragement and hope. Title provided by librarian Quantity: 1 digital cartoon(s).
A tall building sways and groans, creaks and rumbles during an earthquake. Someone from inside at the top of the building says 'Earthquake? No... This is an extreme adventure activity that you'll be billed for later!' Context - The earthquakes in Christchurch and the Canterbury region. The three major ones were on 4th September 2010, 22 February 2011 and 13 June 2011 and there have been hundreds of aftershocks. Quantity: 1 digital cartoon(s).
A photograph of a red sticker notice on the window of 147 Hereford Street, indicating that the building is unsafe to enter.
A photograph of a building on Cashel Street. Some of the windows on the bottom floor have been boarded up with plywood.
A photograph of the back of the badly-damaged John Bull Cycles building on the corner of Colombo Street and Tuam Street.
A photograph of the back of the badly-damaged John Bull Cycles building on the corner of Colombo Street and Tuam Street.
A photograph of broken traffic light in front of a badly-damaged building on the corner of Colombo Street and Tuam Street.
Members of the New Zealand and Chinese Urban Search and Rescue (USAR) teams clearing rubble on the site of the CTV Building.
Hard hats, hi-vis, and a first aid kit, waiting outside as Emergency and Security staff retrieve work for the Registry Building.
A photograph of the Cranmer Centre. Below a collection of masonry has been removed from the building and placed on the ground.
Photograph captioned by Fairfax, "Earthquake damage in central Christchurch after a 6.3 earthquake which destroyed The Press Building in Cathedral Square".
Photograph captioned by Fairfax, "Earthquake damage in central Christchurch after a 6.3 earthquake which destroyed the Press Building in Cathedral Square".
A photograph looking north down Montreal Street towards the partially-demolished St Elmo Courts building. Two cranes are parked to the left.
A photograph looking south down Madras Street towards Latimer Square. Remains of a partially-demolished building can be seen on the right.
A photograph of the back entrance of the badly-damaged Gordon Harris building Worcester Street. There are large cracks in the walls.
An aerial view of Christchurch a week after the 22 February 2011 earthquake. The PGC Building on Cambridge Terrace can be seen.
Photograph captioned by BeckerFraserPhotos, "The boulder-damaged administration building for the Lyttelton tunnel at the Heathcote end of the tunnel".
Photograph captioned by Fairfax, "The Geraldine Hotel and surrounding footpaths have been closed due to cracks appearing on building after the earthquake".
Photograph captioned by BeckerFraserPhotos, "Lifting a section of roof off the PWC building (left) at sunset, viewed from Worcester Street".
Photograph captioned by BeckerFraserPhotos, "Lowering a platform from the PWC building in Armagh Street at sunset, viewed from Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "248 High Street partly cleared away - this building has been in ruins since February 22, 2011".
Photograph captioned by BeckerFraserPhotos, "The wall of the building on the boundary of 143 Manchester Street (behind the Mexican Cafe)".
Cement is piped from the trucks to the foundations where it is poured into the foundation posts when building the Ilam village.