Page 7 of Section A of the Christchurch Press, published on Saturday 30 March 2013.
Page 5 of Section A of the Christchurch Press, published on Friday 5 September 2014.
Page 1 of Section A of the Christchurch Press, published on Thursday 18 September 2014.
Page 5 of Section A of the Christchurch Press, published on Wednesday 28 November 2012.
Page 3 of Section A of the Christchurch Press, published on Monday 22 October 2012.
Page 3 of Section A of the Christchurch Press, published on Tuesday 21 May 2013.
Page 1 of Section A of the Christchurch Press, published on Tuesday 7 June 2011.
Page 20 of Section A of the Christchurch Press, published on Saturday 26 February 2011.
Page 15 of Section C of the Christchurch Press, published on Saturday 19 March 2011.
Page 5 of Section A of the Christchurch Press, published on Wednesday 9 March 2011.
Tests have revealed that New Zealand's latest building designs will stand up to earthquakes of a greater intensity than the ones that occurred in Christchurch and Kaikōura. Researchers from the University of Auckland and Canterbury, in collaboration with QuakeCoRE and Tongji University in China, built a two-storey concrete building and put it on one of the largest shake tables in the world. All of the building's details were based on existing buildings in Wellington and Christchurch. The project leader is the University of Auckland's Dr Rick Henry. He talks to Guyon Espiner.
The remaining victims of the Christchurch's CTV building will be the focus of a Coroner's inquest next month, as families of those killed in the February earthquake continue to question the safety of buildings in the inner city.
A timeline of the CTV building's history.
A graphic showing buildings recommended for demolition.
Photograph captioned by Fairfax, "Fire-damaged building".
A video of an interview with Mayor Bob Parker about the building consent crisis at the Christchurch City Council. The council received a letter from International Accreditation New Zealand (IANZ) on 30 May 2013. The letter says that the Council has until 28 June 2013 to improve its processes or it will be stripped of its accreditation as a building consent authority.
A video about a fire which broke out in an earthquake-damaged building on High Street. The video includes an interview with Steve Kennedy, Canterbury Fire Service Assistant Area Manager, Brigid Fayle, who worked in the building prior to the 22 February 2011 earthquake, and Anne MacKenzie, a structural engineer who worked on strengthening the building.
A video of a tour through the Christchurch central city Red Zone. The video includes footage of Manchester Street, Gloucester Street, Hereford Street, Lichfield Street, High Street, Worcester Street, and Cashel Mall. It also includes footage of Cathedral Square and the surrounding buildings, taken from the roof of the new Press Building on Gloucester Street.
Page 5 of Section A of the Christchurch Press, published on Monday 31 March 2014.
A video of a tour of the Christchurch central city Red Zone. The video shows footage of the Edmond's Band Rotunda, Gloucester Street, the CTV building site, Poplar Lane, the McKenzie & Willis building, High Street, Lichfield Street, Colombo Street, Cathedral Square, and ChristChurch Cathedral.
The 2010–2011 Canterbury earthquakes, which involved widespread damage during the February 2011 event and ongoing aftershocks near the Christchurch Central Business District, left this community with more than $NZD 40 billion in losses (~20 % GDP), demolition of approximately 60 % of multi-storey concrete buildings (3 storeys and up), and closure of the core business district for over 2 years. The aftermath of the earthquake sequence has revealed unique issues and complexities for the owners of commercial and multi-storey residential buildings in relation to unexpected technical, legal, and financial challenges when making decisions regarding the future of their buildings impacted by the earthquakes. The paper presents a framework to understand the factors influencing post-earthquake decisions (repair or demolish) on multi-storey concrete buildings in Christchurch. The study, conducted in 2014, includes in-depth investigations on 15 case-study buildings using 27 semi-structured interviews with various property owners, property managers, insurers, engineers, and government authorities in New Zealand. The interviews revealed insights regarding the multitude of factors influencing post-earthquake decisions and losses. As expected, the level of damage and repairability (cost to repair) generally dictated the course of action. There is strong evidence, however, that other variables have significantly influenced the decision on a number of buildings, such as insurance, business strategies, perception of risks, building regulations (and compliance costs), and government decisions. The decision-making process for each building is complex and unique, not solely driven by structural damage. Furthermore, the findings have put the spotlight on insurance policy wordings and the paradoxical effect of insurance on the recovery of Christchurch, leading to other challenges and issues going forward.
Building plans signed off by the Christchurch City Council show one of its own structural engineers was involved in the design of a new multistorey building that is unstable. The eight-storey office building at 230 High Street is off-limits as it is too weak and might 'rupture' in an earthquake. But the council insists the planning documents are wrong and its engineer had only a minor role. Phil Pennington reports.
A Christchurch MP is working with a group trying to prevent historic buildings damaged in last month's earthquake from being torn down unnecessarily.
Insurance cover has been cancelled for Christchurch's historic Arts Centre and its Catholic Cathedral which were both badly damaged in the February earthquake.
A victim's family and engineers are seeking answers from the Christchurch City Council on why the earthquake-devastated CTV building was allowed to be built.
Business owners have told the Christchurch City Council they are haemorrhaging thousands of dollars a week, while it decides whether or not to demolish their buildings following last month's earthquake.
Twelve years after the CTV building collapsed during the Christchurch earthquake, families of the victims killed inside have told an engineering disciplinary hearing they want justice and accountability. 115 people died when the six-storey building came down in February 2011. A complaint against an engineer whose firm designed the building is being heard by an Engineering New Zealand disciplinary committee. Dr Alan Reay lost a High Court bid to stop the hearing. Anna Sargent reports.
The Canterbury Earthquake Royal Commission is calling for changes to building standards as a matter of urgency.
Photograph captioned by Fairfax, "Demolition of Manchester Courts building continues with beams now exposed. The heritage building was severely damaged by the September earthquake. Demolition workers visible in top left corner".
Photograph captioned by Fairfax, "Kaiapoi businesses and retail outlets are struggling post-earthquake leading into Christmas. The Rooster cafe operating out of a prefab building after their building was demolished".