A vacant demolition site and a crane on Colombo Street. The overhead walkway that runs between the Crossing building and Ballantynes is visible in the background.
Photograph captioned by BeckerFraserPhotos, "Looking down Victoria Street to Forsyth Barr building (rubble is from the Crowne Plaza Hotel)".
Over 900 buildings in the Christchurch central business district and 10,000 residential homes were demolished following the 22nd of February 2011 Canterbury earthquake, significantly disrupting the rebuild progress. This study looks to quantify the time required for demolitions during this event which will be useful for future earthquake recovery planning. This was done using the Canterbury Earthquake Recovery Authority (CERA) demolition database, which allowed an in-depth look into the duration of each phase of the demolition process. The effect of building location, building height, and the stakeholder which initiated the demolition process (i.e. building owner or CERA) was investigated. The demolition process comprises of five phases; (i) decision making, (ii) procurement and planning, (iii) demolition, (iv) site clean-up, and (v) completion certification. It was found that the time required to decide to demolish the building made up majority of the total demolition duration. Demolition projects initiated by CERA had longer procurement and planning durations, but was quicker in other phases. Demolished buildings in the suburbs had a longer decision making duration, but had little effect on other phases of the demolition process. The decision making and procurement and planning phases of the demolition process were shorter for taller buildings, though the other phases took longer. Fragility functions for the duration of each phase in the demolition process are provided for the various categories of buildings for use in future studies.
Photograph captioned by BeckerFraserPhotos, "Looking past Warners Hotel toward the Cathedral from Gloucester Street across the demolition site of the Base Backpackers".
A photograph captioned by BeckerFraserPhotos, "A demolition site on the corner of Oxford Street and Sumner Road in Lyttelton is made more attractive".
Empty demolition sites on Tuam Street. The Alice in Videoland building can be seen on left with the Wespac building and Holiday Inn in the background.
Intersection of Colombo and St Asaph Street, where road cones have been placed on the road to divert traffic from a demolition site in the background.
A photograph of an empty site on the corner of Tuam Street and Madras Street. In the distance is the old Post Office building.
Photograph captioned by BeckerFraserPhotos, "Madras Street looking south from Lichfield Street".
A partly constructed tilt slab building on the demolition site of 338 Montreal Street. In the background, a severely damaged B&B can be seen.
A partly constructed tilt slab building on the demolition site of 338 Montreal Street. In the background, a severely damaged B&B can be seen.
A view of Cashel Street from the High Street intersection. An empty demolition site where a building once stood has been cordoned off with security fencing.
Damaged buildings and empty demolition sites. The building on the left has had tarpaulins placed on it to prevent weather damage to the inside of the building.
A cordon check point on Durham Street. The demolition site was a building that housed Laycock Collision Repairs. The Christchurch Casino can be seen in the background.
Demolition site of a building, where the wall on the adjoining building has been exposed. In the footpath in front is a road cone with a flower.
Photograph captioned by BeckerFraserPhotos, "A large pile of concrete rubble from a demolition site in Kilmore Street. Forsyth Barr building in the background".
A photograph of the demolition site of Forbe's Store in Lyttelton. A section of the remaining floor has the words, "Robert Forbes" inlaid in the tiles.
Photograph captioned by BeckerFraserPhotos, "Looking along Chester St West - there are already a number of empty sites and several more buildings due for demolition".
A photograph of an empty site and badly-damaged buildings, taken from behind a fence on Madras Street. In the distance is the old Post Office building.
A photograph of an empty site and badly-damaged buildings taken from behind a fence on Madras Street. In the distance is the old Post Office building.
A photograph of the site of a demolished building on Gloucester Street, near the intersection of Colombo Street. A Southern Demolition excavator is being used to clear the rubble away. In the background are the Forsyth Barr building, the Copthorne Hotel and the PricewaterhouseCoopers building.
One landscape colour digital photograph taken on 19 November 2011 showing the site of the Albion Hotel/ Ground Delicatessen. After the demolition of the building the site was used for a Gap Filler initiative called the Lyttelton Petanque Club. The photograph shows the temporary furniture, landscaping and public Petanque court. The site formerl...
A photograph captioned by BeckerFraserPhotos, "Children play the Gap Filler piano at 636 Ferry Road".
A photograph captioned by BeckerFraserPhotos, "Children play the Gap Filler piano at 636 Ferry Road".
Photograph captioned by BeckerFraserPhotos, "Hotel Grand Chancellor, 165 Cashel Street, has moved sideways into the parking building at 161 Cashel Street".
Photograph captioned by BeckerFraserPhotos, "Cathedral Junction, Worcester Street".
Photograph captioned by BeckerFraserPhotos, "Diva on High Street".
A photograph captioned by BeckerFraserPhotos, "The IRD building on Cashel Street seen from across the demolition site of the Occidental Hotel on Hereford Street".
Photograph captioned by BeckerFraserPhotos, "Basement of 127 Lichfield Street (The Travel Doctor)".
The demolition site of a building on Gloucester Street. A digger sits on a pile of rubble. Tape with "Danger Keep Out" has been placed across the property.