Urban Ensembles explores the way in which landscape and architecture can be employed together within the design of a steep, urban site. Lyttelton is a small port town on the border of Christchurch, settled in the foothills of a harbour formed by a major volcanic eruption. This rugged setting, with steeply sloping urban terrain, presents an interesting challenge when designing an urban development. The site was badly damaged in a series of earthquakes in 2010-2011, and many of the town’s oldest buildings, heritage structures dating back to the colonial settlement era, were destroyed. This has left a void in the heart of Lyttelton, and caused the loss of much of the tourism business that the town relies upon for its income. This thesis takes a methodological approach to the design of landscape architecture on such a challenging site. A range of techniques are explored, drawing from both landscape and architecture to explore the roles that each discipline plays in the design of urban spaces. The frequent imbalance between disciplines is addressed both through the literature review and design method, as this landscape architecture thesis draws on architectural design as a tool for generating spaces which fall somewhere in between the two ideals of interior and exterior. The final design proposal is an alternative rebuild plan for the central business area to the south of London St, and also addresses the relationships between that site and the surrounding context, both urban and environmental. The aim of this design is to create a series of interconnected spaces which have a strong relationship to the surrounding harbour setting, and also to facilitate development of the pedestrian spaces throughout the block and encouraging the development of activity at the street level, through the interface between buildings and landscape.
Hon STEVEN JOYCE to the Minister of Finance: Can he confirm he plans to increase net core Crown debt from $59.5 billion as at 30 June 2017 to $67.6 billion by 2022; and can he confirm debt will not increase by any more than that? MARAMA DAVIDSON to the Minister of Conservation: What has been the Department of Conservation’s biggest recent success in predator control to better protect our native plants and wildlife? Hon Dr JONATHAN COLEMAN to the Minister of Health: What measurable outcomes, if any, will his policies deliver? SIMON O'CONNOR to the Minister of Corrections: Does he stand by his Government’s intention to reduce the prison population by 30 percent over the next 15 years; if so, how? KIERAN McANULTY to the Minister of Transport: Has he received any reports commissioned under the previous Government that show the value of investment in rail? Hon JACQUI DEAN to the Minister of Tourism: Does he stand by all his statements? Hon GERRY BROWNLEE to the Prime Minister: Does she stand by all her statements? Dr DUNCAN WEBB to the Minister for Greater Christchurch Regeneration: What was the expected date, prior to the General Election, that the Residential Advisory Service would cease operations, and what steps has she taken since becoming Minister to ensure the service continues for people affected by the Canterbury and Kaikōura earthquakes? BRETT HUDSON to the Associate Minister of State Services (Open Government): Does she stand by her statement in Parliament yesterday that this will be “the most open, most transparent Government that New Zealand has ever had”; if so, how? Hon LOUISE UPSTON to the Minister for Children: Is she committed to implementing the United Nations Convention on the Rights of the Child in full? TAMATI COFFEY to the Associate Minister of Finance: How is the Government preserving the right of New Zealanders to own land in New Zealand? JAMI-LEE ROSS to the Minister of Local Government: What steps will she take to support the local government sector to achieve greater efficiency and control spending?
Oarai is a coastal town in Ibaraki Prefecture, Japan, affected by the Great East Japan Earthquake in 2011. The disaster severely damaged local industries, and the local tourism sector faced a sharp decline followed the event. To overcome the conundrum, the local tourism businesses have taken the opportunity to collaborate with an anime called Girls und Panzer, which has been developed by an external animation production studio. This collaboration has resulted in huge success, and the drop in the local tourism industry had been largely reversed, but has resulted in a significant change to the tourism system. This thesis explores the activities and outcomes of this tourism industry reimagining. A mixed-method approach was used to investigate the perception of local tourism businesses to the current Oarai tourism system, and examine the transformative effect of the disaster and its aftermath. Perceptions of disaster impact and anime tourism development were analysed through surveys (n=73) and interviews (n=2) which focused on tourism business operators, while participant observation was conducted to create the image of anime tourism operation in Oarai. Results show that the development of anime tourism in Oarai successfully helped the local tourism businesses to recover from the disaster. As new agencies and organisations joined the anime tourism network, anime tourism increased communication between stakeholders, and improved the resilience of the community. The new tourism development has transformed the local tourism industry, to some extent, however. the future trajectory of anime tourism in Oarai is difficult to forecast, and there is scope for longitudinal research of this tourism system.
Monday's 10 year anniversary of the devastating earthquake that took the lives of 185 people in Christchurch, will be marked with a special service near the city's earthquake memorial. Large crowds are expected from half past twelve this afternoon on the lawn just across the river from the memorial wall. Among those speaking is the prime minister, Jacinda Ardern. A message from former mayor, Sir Bob Parker, will be read out. Sir Bob, who led the city through one of its most challenging periods, recently suffered a major stroke and heart attack. The names of the 185 who died will be read before a minute's silence at twelve fifty one, the exact moment the quake struck. Flowers will then be laid at the memorial wall.
After the Christchurch earthquakes, the government declared about 8000 houses as Red Zoned, prohibiting further developments in these properties, and offering the owners to buy them out. The government provided two options for owners: the first was full payment for both land and dwelling at the 2007 property evaluation, the second was payment for land, and the rest to be paid by the owner’s insurance. Most people chose the second option. Using data from LINZ combined with data from StatNZ, this project empirically investigates what led people to choose this second option, and what were the implications of these choices for the owners’ wealth and income.
A residential property in Bexley with an overgrown garden. A spray-painted message on the wall of the house reads, "Thanks 4 the memories, 1997-2012, kia kaha". The photographer comments, "Today I took a drive around the residential area between Bexley and New Brighton. It was a stark reminder to be thankful for the situation we're in and perhaps not complain too much that our garden wall hasn't yet been rebuilt ... Saddest of all are the messages that have been scrawled on walls and garage doors by departing locals. At one end of the scale, thanking the family home for the memories, and at the other end of the scale cursing the looters which have made a bad situation that much more unbearable".
This report presents the simplified seismic assessment of a case study reinforced concrete (RC) building following the newly developed and refined NZSEE/MBIE guidelines on seismic assessment (NZSEE/MBIE, semi-final draft 26 October 2016). After an overview of the step-by-step ‘diagnostic’ process, including an holistic and qualitative description of the expected vulnerabilities and of the assessment strategy/methodology, focus is given, whilst not limited, to the implementation of a Detailed Seismic Assessment (DSA) (NZSEE/MBIE, 2016c). The DSA is intended to provide a more reliable and consistent outcome than what can be provided by an initial seismic assessment (ISA). In fact, while the Initial Seismic Assessment (ISA), of which the Initial Evaluation Procedure is only a part of, is the more natural and still recommended first step in the overall assessment process, it is mostly intended to be a coarse evaluation involving as few resources as reasonably possible. It is thus expected that an ISA will be followed by a Detailed Seismic Assessment (DSA) not only where the threshold of 33%NBS is not achieved but also where important decisions are intended that are reliant on the seismic status of the building. The use of %NBS (% New Building Standard) as a capacity/demand ratio to describe the result of the seismic assessment at all levels of assessment procedure (ISA through to DSA) is deliberate by the NZSEE/MBIE guidelines (Part A) (NZSEE/MBIE 2016a). The rating for the building needs only be based on the lowest level of assessment that is warranted for the particular circumstances. Discussion on how the %NBS rating is to be determined can be found in Section A3.3 (NZSEE/MBIE 2016a), and, more specifically, in Part B for the ISA (NZSEE/MBIE 2016b) and Part C for the DSA (NZSEE/MBIE 2016c). As per other international approaches, the DSA can be based on several analysis procedures to assess the structural behaviour (linear, nonlinear, static or dynamic, force or displacement-based). The significantly revamped NZSEE 2016 Seismic Assessment Guidelines strongly recommend the use of an analytical (basically ‘by hand’) method, referred to the Simple Lateral Mechanism Analysis (SLaMA) as a first phase of any other numerically-based analysis method. Significant effort has thus been dedicated to provide within the NZSEE 2016 guidelines (NZSEE/MBIE 2016c) a step-by-step description of the procedure, either in general terms (Chapter 2) or with specific reference to Reinforced Concrete Buildings (Chapter 5). More specifically, extract from the guidelines, NZSEE “recommend using the Simple Lateral Mechanism Analysis (SLaMA) procedure as a first step in any assessment. While SLaMA is essentially an analysis technique, it enables assessors to investigate (and present in a simple form) the potential contribution and interaction of a number of structural elements and their likely effect on the building’s global capacity. In some cases, the results of a SLaMA will only be indicative. However, it is expected that its use should help assessors achieve a more reliable outcome than if they only carried out a detailed analysis, especially if that analysis is limited to the elastic range For complex structural systems, a 3D dynamic analysis may be necessary to supplement the simplified nonlinear Simple Lateral Mechanism Analysis (SLaMA).” This report presents the development of a full design example for the the implementation of the SLaMA method on a case study buildings and a validation/comparison with a non-linear static (pushover) analysis. The step-by-step-procedure, summarized in Figure 1, will be herein demonstrated from a component level (beams, columns, wall elements) to a subassembly level (hierarchy of strength in a beam-column joint) and to a system level (frame, C-Wall) assuming initially a 2D behaviour of the key structural system, and then incorporating a by-hand 3D behaviour (torsional effects).
Voluntary turnover has been the subject of scholarly inquiry for more than 100 years and much is understood about the drivers of turnover, and the decision-making processes involved. To date most models of voluntary turnover have assumed a rational and sequential decision process, initiated primarily by dissatisfaction with the job and the perceived availability of alternatives. Operating within a strong predictive research agenda, countless studies have sought to validate, extend and refine these traditional models through the addition of distal antecedents, mediators, moderators, and proximal antecedents of turnover. The net result of this research is a large body of empirical support for a somewhat modest relationship between job dissatisfaction, perceived alternatives, turnover intentions, job search behaviour and actual turnover. Far less scholarly attention has been directed at understanding shock-induced turnover that is not necessarily derived from dissatisfaction. Moreover, almost no consideration has been given to understanding how a significant and commonly experienced extra-organisational shock, such as natural disaster, might impact turnover decision making. Additionally, the dynamic and cumulative impacts of multiple shocks on turnover decision making have to date not been examined by turnover researchers. In addressing these gaps this thesis presents a leaver-centric theory of employee turnover decision making that is grounded in the post-disaster context. Data for the study were collected from in-depth interviews with 31 leavers in four large organisations in Christchurch, New Zealand; an area that experienced a major natural disaster in the form of the Canterbury earthquake sequence. This context provided a unique setting in which to study turnover as the primary shock was followed by a series of smaller shocks, resulting in a period of sustained disruption to the pre-shock status quo. Grounded theory methods are used to develop a typology of leaving which describes four distinct patterns of turnover decision making that follow a significant extra-organisational shock. The proposed typology not only addresses the heterogeneous and complex nature of turnover decision making, but also provides a more nuanced explanation of the turnover process explicating how the choice of decision path followed is influenced by four contextual factors which emerged from the data: (1) pre-shock motivational state; (2) decision difficulty; (3) experienced shock magnitude; and (4) the availability of resources. The research findings address several shortcomings in the extant literature on employee turnover, and offer practical recommendations for managers seeking to retain employees in a post-disaster setting.
An electronic copy of an account prepared by Trisha Ventom, IHC Self Advocacy Coordinator Southern Region, describing the processes put in place by IHC Advocacy following the Christchurch Earthquakes in 2011.
There are many things that organisations of any size can do to prepare for a disaster or crisis. Traditionally, the advice given to business has focused on identifying risks, reducing their likely occurrence, and planning in advance how to respond. More recently, there is growing interest in the broader concept of organisational resilience which includes planning for crisis but also considers traits that lead to organisational adaptability and ability to thrive despite adverse circumstances. In this paper we examine the policy frameworks1 within New Zealand that influence the resilience of small and medium sized businesses (SMEs). The first part of the paper focuses on the New Zealand context, including the prevailing political and economic ideologies, the general nature of New Zealand SMEs and the nature of New Zealand’s hazard environment. The paper then goes on to outline the key policy frameworks in place relevant to SMEs and hazards. The final part of the paper examines the way the preexisting policy environment influenced the response of SMEs and Government following the Canterbury earthquakes.
This paper explores the responses by a group of children to an art project that was undertaken by a small school in New Zealand after the September 2010 and February 2011 Christchurch earthquakes. Undertaken over a period of two years, the project aimed to find a suitable form of memorialising this significant event in a way that was appropriate and meaningful to the community. Alongside images that related directly to the event of the earthquakes, the art form of a mosaic was chosen, and consisted of images and symbols that clearly drew on the hopes and dreams of a school community who were refusing to be defined by the disaster. The paper 'writes' the mosaic by placing fragments of speech spoken by the children involved in relation to ideas about memory, affect, and the 'sublime', through the work of Jean-Francois Lyotard. The paper explores the mosaic as constituted by the literal and metaphorical 'broken pieces' of the city of Christchurch in ways that confer pedagogic value inscribed through the creation of a public art space by children. AM - Accepted Manuscript
The front page graphic for a feature marking the anniversary of the 22 February 2011 earthquake. The feature is titled, "Beyond the call".
The contents page for the Your Weekend section of The Press, featuring an editorial about the anniversary of the 22 February 2011 earthquake.
The front page graphic for a feature marking the anniversary of the 22 February 2011 earthquake. The feature is titled, "The year that was".
An incomplete layout for the front page of The Press. The headline reads, "City Council failed to grasp the magnitude of the task".
The Royal Commission into the Canterbury Earthquakes has heard the CTV building collapsed because of the incompetence of the man in charge of designing it.
The Dean of the Christchurch Cathedral says he's stepping down so he can better serve the city during the earthquake recovery.
The Ngai Tahu High Court case against the Crown over freshwater and Christchurch marking the 14th anniversary of the 2011 earthquake.
Damage to the Cathedral of the Blessed Sacrament. On the fence is a photograph of what the cathedral looked like before the earthquake.
The Avon river, with some cordon fence visible on the left and the central Police station in the background between the trees.
A photograph of the east side of the Odeon Theatre, showing the severe damage at the back of the theatre.
Damage to the Blackwells building in Kaiapoi. Part of the facade has collapsed onto the street below. In the foreground is the War Memorial.
The index page for the Your Weekend section of The Press, featuring a photograph of the temporary offices being used by The Press.
Damage to the Cranmer Courts. A section of the wall has crumbled, exposing the wooden framing and the interior of the building.
The front page graphic for the Mainlander section of The Press. The main headline reads, "12:51 pm: The first 20 seconds...".
The site of the demolished St. John's Anglican Church on Latimer Square. On the left is the former site of the CTV building.
A photograph of the east side of the Odeon Theatre, showing the severe damage at the back of the theatre.
Earthquake damage to the Cathedral of the Blessed Sacrament. Workers are suspended from a crane above the remains of the dome.
Earthquake damage to the Cathedral of the Blessed Sacrament. Workers are suspended from a crane above the remains of the dome.
The banks of the Kaiapoi River have slumped towards the river, leaving a gap between the riverside walkway and the steps up to Raven Quay.