Search

found 6348 results

Audio, Radio New Zealand

Questions to Ministers 1. PESETA SAM LOTU-IIGA to the Minister of Finance: What progress has the Government made in building a more competitive economy and getting on top of New Zealand's longstanding reliance on foreign debt? 2. Hon PHIL GOFF to the Prime Minister: Does he have confidence in his Minister of Finance? 3. KEVIN HAGUE to the Prime Minister: Does he stand by all his statements regarding the safety of mining in New Zealand; and does he consider his Government has met all its responsibilities arising out of the Pike River mine disaster? 4. Hon DAVID CUNLIFFE to the Minister of Finance: What are the latest official forecasts for the current account balance and the net international investment position over the next four years under his Government's policies? 5. JONATHAN YOUNG to the Minister of Justice: What progress has been made on the development of alternative court processes for child witnesses? 6. Hon CLAYTON COSGROVE to the Minister of Finance: In light of his statement yesterday regarding foreign-owned assets that "we need to generate the kind of savings that will help New Zealand buy back those assets", is it still the Government's policy to sell State assets if it is re-elected, given that up to 30 percent of the shares he proposes selling could go to overseas buyers? 7. Hon JOHN BOSCAWEN to the Minister of Finance: Does he think that implementing the 2025 Taskforce's recommendations in November 2009 would have avoided New Zealand's double credit downgrade; if not, why not? 8. GRANT ROBERTSON to the Minister of Health: Has he been advised of a reduction in funding for home-based health support services in the Wellington region? 9. TIM MACINDOE to the Minister of Corrections: Has she received any progress reports on the implementation of the Government's Prisoner Skills and Employment Strategy? 10. STUART NASH to the Minister of Finance: By how many percent has the GDP per capita gap between Australia and New Zealand widened since his Government took office? 11. NIKKI KAYE to the Minister for Communications and Information Technology: How many schools will benefit from ultra-fast broadband in the first year of the roll-out? 12. BRENDON BURNS to the Minister for Canterbury Earthquake Recovery: Does he stand by all of his statements on Canterbury's earthquake recovery? Questions to Members 1. SU'A WILLIAM SIO to the Chairperson of the Social Services Committee: Will she call a meeting to consider the Inquiry into the identification, rehabilitation, and care and protection of child offenders; if not, why not?

Audio, Radio New Zealand

PAUL GOLDSMITH to the Minister of Finance: What reports has he received on progress in lifting New Zealand’s household savings and reducing household debt? EUGENIE SAGE to the Minister for Canterbury Earthquake Recovery: Did the advice he has received on Christchurch City Council assets contemplate a sell off or sell down of shares in companies supervised by Christchurch City Holdings Ltd or of other council assets; if so, which ones? Hon DAVID PARKER to the Minister of Finance: Does he stand by his answer to yesterday’s primary question “as I understand it, there are no regional statistics that specifically isolate the number of people leaving any particular region to move overseas” and has the Treasury reported to him the existence of official statistics on permanent and long-term migration compiled by local council area and region? SCOTT SIMPSON to the Minister for Tertiary Education, Skills and Employment: What changes is the Government making to improve results from industry training? Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Which of the assets identified by CERA in response to his request has he ruled out asking Christchurch City Council to sell? KATRINA SHANKS to the Minister of Justice: What changes is she making to improve the Family Court? Le'aufa'amulia ASENATI LOLE-TAYLOR to the Minister for Whānau Ora: Does she stand by her statement that “I don’t object to any vulnerable family receiving Whānau Ora support, because that’s what the money is for”? Hon ANNETTE KING to the Minister of Housing: Does he stand by all his comments on housing; if not, why not? Dr KENNEDY GRAHAM to the Minister of Foreign Affairs: What is the total number and cost of uncontested contracts given by the Ministry of Foreign Affairs and Trade to external consultants in the last two financial years? MARK MITCHELL to the Minister for Communications and Information Technology: Has she received any reports on the progress of the Government’s Ultra-Fast Broadband and Rural Broadband Initiatives? DARIEN FENTON to the Minister of Labour: Does she stand by her statement regarding foreign chartered fishing vessels “If breaches of labour law occur – such as underpayment of wages or illegal deductions or breaches of the Code of Practice, the Department of Labour will be able to investigate them and take action”? NICKY WAGNER to the Minister for the Environment: What recent announcements has she made in relation to the Waste Minimisation Fund?

Research papers, The University of Auckland Library

Following the 2010/2011 Canterbury (New Zealand) earthquakes the seismic design of buildings with precast concrete panels has received significant attention. Although this form of construction generally performed adequately in Christchurch, there were a considerable number of precast concrete panel connection failures. This observation prompted a review of more than 4700 panel details to establish representative details used in both existing and new multi-storey and low rise industrial precast concrete buildings. The detailing and quantity of each reviewed connection type in the sampled data is reported, and advantages and potential deficiencies of each connection type are discussed. Following the Canterbury earthquakes, it was observed that brittle failure had occurred in some grouted metal duct connections used for precast concrete wall panels, resulting in recommendations for more robust detailing of this connection type. A set of experimental tests was subsequently performed to investigate the in-plane seismic behaviour of precast concrete wall panel connections. This testing comprised of seven reversed cyclic in-plane tests of fullscale precast concrete wall panels having wall-to-foundation grouted metal duct connections. Walls with existing connection detailing were found to perform adequately when carrying low axial loads, but performance was found to be less satisfactory as the axial load and wall panel length increased. The use of new recommended detailing was observed to prevent brittle connection response and to improve the robustness of the reinforcement splice. A parametric investigation was conducted using the finite element method to predict the failure mode of metal duct connections. From the results of the parametric study on metal duct connections it was identified that there were three possible failure modes, being reinforcement fracture, concrete spalling without metal duct pull out, and concrete spalling with metal duct pull-out. An alternative simple analytical method was proposed in order to determine the type of connection failure without using a time-consuming finite element method. Grouted sleeves inserts are an alternative connector that is widely used to connect wall panels to the foundations. The two full-scale wall panels were subjected to reversed cyclic in-plane demands until failure of either the connection or the wall panel. Wall panel failure was due to a combination of connection reinforcement pulling-out from the coupler and reinforcement fracture. In addition, non-embedded grouted sleeve tests filled with different quality of grout were conducted by subjecting these coupler assemblages to cyclic and monotonic forces.

Research papers, University of Canterbury Library

Deconstruction, at the end of the useful life of a building, produces a considerable amount of materials which must be disposed of, or be recycled / reused. At present, in New Zealand, most timber construction and demolition (C&D) material, particularly treated timber, is simply waste and is placed in landfills. For both technical and economic reasons (and despite the increasing cost of landfills), this position is unlikely to change in the next 10 – 15 years unless legislation dictates otherwise. Careful deconstruction, as opposed to demolition, can provide some timber materials which can be immediately re-used (eg. doors and windows), or further processed into other components (eg. beams or walls) or recycled (‘cascaded’) into other timber or composite products (e.g. fibre-board). This reusing / recycling of materials is being driven slowly in NZ by legislation, the ‘greening’ of the construction industry and public pressure. However, the recovery of useful material can be expensive and uneconomic (as opposed to land-filling). In NZ, there are few facilities which are able to sort and separate timber materials from other waste, although the soon-to-be commissioned Burwood Resource Recovery Park in Christchurch will attempt to deal with significant quantities of demolition waste from the recent earthquakes. The success (or otherwise) of this operation should provide good information as to how future C&D waste will be managed in NZ. In NZ, there are only a few, small scale facilities which are able to burn waste wood for energy recovery (e.g. timber mills), and none are known to be able to handle large quantities of treated timber. Such facilities, with constantly improving technology, are being commissioned in Europe (often with Government subsidies) and this indicates that similar bio-energy (co)generation will be established in NZ in the future. However, at present, the NZ Government provides little assistance to the bio-energy industry and the emergence worldwide of shale-gas reserves is likely to push the economic viability of bio-energy further into the future. The behaviour of timber materials placed in landfills is complex and poorly understood. Degrading timber in landfills has the potential to generate methane, a potent greenhouse gas, which can escape to the atmosphere and cancel out the significant benefits of carbon sequestration during tree growth. Improving security of landfills and more effective and efficient collection and utilisation of methane from landfills in NZ will significantly reduce the potential for leakage of methane to the atmosphere, acting as an offset to the continuing use of underground fossil fuels. Life cycle assessment (LCA), an increasingly important methodology for quantifying the environmental impacts of building materials (particularly energy, and global warming potential (GWP)), will soon be incorporated into the NZ Green Building Council Greenstar rating tools. Such LCA studies must provide a level playing field for all building materials and consider the whole life cycle. Whilst the end-of-life treatment of timber by LCA may establish a present-day base scenario, any analysis must also present a realistic end-of-life scenario for the future deconstruction of any 6 new building, as any building built today will be deconstructed many years in the future, when very different technologies will be available to deal with construction waste. At present, LCA practitioners in NZ and Australia place much value on a single research document on the degradation of timber in landfills (Ximenes et al., 2008). This leads to an end-of-life base scenario for timber which many in the industry consider to be an overestimation of the potential negative effects of methane generation. In Europe, the base scenario for wood disposal is cascading timber products and then burning for energy recovery, which normally significantly reduces any negative effects of the end-of-life for timber. LCA studies in NZ should always provide a sensitivity analysis for the end-of-life of timber and strongly and confidently argue that alternative future scenarios are realistic disposal options for buildings deconstructed in the future. Data-sets for environmental impacts (such as GWP) of building materials in NZ are limited and based on few research studies. The compilation of comprehensive data-sets with country-specific information for all building materials is considered a priority, preferably accounting for end-of-life options. The NZ timber industry should continue to ‘champion’ the environmental credentials of timber, over and above those of the other major building materials (concrete and steel). End-of-life should not be considered the ‘Achilles heel’ of the timber story.

Audio, Radio New Zealand

MAGGIE BARRY to the Minister of Finance: What reports has he received on the economy? Rt Hon WINSTON PETERS to the Minister of Māori Affairs: Is he satisfied with the financial management of the Whānau Integration, Innovation and Engagement Fund, administered by Te Puni Kōkiri? Hon DAVID PARKER to the Minister of Finance: What is the projected growth, if any, of New Zealand’s international liabilities under this Government’s policies, and what are the components of those liabilities? EUGENIE SAGE to the Minister for the Environment: Is water quality in New Zealand being negatively affected by livestock in rivers and lakes? Dr CAM CALDER to the Minister of Corrections: What progress has been made on the proposal to build a public-private prison at Wiri? Hon PHIL GOFF to the Minister of Foreign Affairs: Will proposed changes to the Ministry of Foreign Affairs and Trade undermine its ability to carry out its role in promoting New Zealand’s trade, security and consular interests? LOUISE UPSTON to the Minister of Women's Affairs: What commitment is the Government willing to make to increase the number of women on State sector boards? DENIS O'ROURKE to the Minister for Canterbury Earthquake Recovery: Is he satisfied with the rate of progress of the Christchurch earthquake recovery? Dr KENNEDY GRAHAM to the Minister for Climate Change Issues: Did New Zealand meet the 28 February deadline for its submission to the United Nations on increasing the level of ambition in global greenhouse gas mitigation, as agreed by parties in the Durban Platform for Enhanced Action; if not, why not? DARIEN FENTON to the Minister of Labour: Does she stand by her answer to Written Question No 00916 (2012) that “the Government is focused on building a more competitive economy, which will lead to more jobs and higher wages”? JOHN HAYES to the Minister of Defence: What updates can he give on new Defence Force capability? CLARE CURRAN to the Minister of Broadcasting: Is he confident that current Government broadcasting policy upholds the standards of an independent and free press; if so, why?  

Research papers, The University of Auckland Library

Mechanistic and scientific approaches to resilience assume that there is a “tipping point” at which a system can no longer absorb adversity; after this point, it is liable to collapse. Some of these perspectives, particularly those stemming from ecology and psychology, recognise that individuals and communities cannot be perpetually resilient without limits. While the resilience paradigm has been imported into the social sciences, the limits to resilience have often been disregarded. This leads to an overestimation of “human resourcefulness” within the resilience paradigm. In policy discourse, practice, and research, resilience seems to be treated as a “limitless” and human quality in which individuals and communities can effectively cope with any hazard at any time, for as long as they want and with any people. We critique these assumptions with reference to the recovery case in Ōtautahi Christchurch, Aotearoa New Zealand following the 2010-11 Canterbury earthquake sequence. We discuss the limits to resilience and reconceptualise resilience thinking for disaster risk reduction and sustainable recovery and development.

Audio, Radio New Zealand

It was so nearly lost. As the Christ Church Anglican Cathedral is being rebuilt, historian Edmund Bohan is releasing a history of the distinctive Gothic building. It shows it was controversial even before work started on designing it, let alone building in. From the laying of the foundations to the official opening, it took 40 years, after squabbles over pretty much every aspect of its construction - not to mention the huge problems raising the money to build it in the City Centre. In Heart of the City: The Story of Christchurch's Controversial Cathedral, Edmund is critical of the former Anglican Bishop Victoria Matthews' determination to demolish the badly-damaged cathedral after the Canterbury earthquakes, to replace it with a modern church. And he tells Lynn Freeman he's very much looking forward to seeing the Cathedral restored to its former glory after a lengthy and pricey rebuild. But first he sets the scene. Back in the 1860s, there was controversy over where the cathedral should go, its design, whether it should be in stone or timber - even if there should be a cathedral built at all! Heart of the City: The Story of Christchurch's Controversial Cathedral, by Edmund Bohan is published by Quentin Wilson Publishing.

Research papers, University of Canterbury Library

Disaster recovery involves the restoration, repair and rejuvenation of both hard and soft infrastructure. In this report we present observationsfrom seven case studies of collaborative planning from post-earthquake Canterbury, each of which was selected as a means of better understanding ‘soft infrastructure for hard times’. Though our investigation is located within a disaster recovery context, we argue that the lessons learned are widely applicable. Our seven case studies highlighted that the nature of the planning process or journey is as important as the planning objective or destination. A focus on the journey can promote positive outcomes in and of itself through building enduring relationships, fostering diverse leaders, developing new skills and capabilities, and supporting translation and navigation. Collaborative planning depends as much upon emotional intelligence as it does technical competence, and we argue that having a collaborative attitude is more important than following prescriptive collaborative planning formulae. Being present and allowing plenty of time are also key. Although deliberation is often seen as an improvement on technocratic and expertdominated decision-making models, we suggest that the focus in the academic literature on communicative rationality and discursive democracy has led us to overlook other more active forms of planning that occur in various sites and settings. Instead, we offer an expanded understanding of what planning is, where it happens and who is involved. We also suggest more attention be given to values, particularly in terms of their role as a compass for navigating the terrain of decision-making in the collaborative planning process. We conclude with a revised model of a (collaborative) decision-making cycle that we suggest may be more appropriate when (re)building better homes, towns and cities.

Research papers, University of Canterbury Library

Study region: Christchurch, New Zealand. Study focus: Low-lying coastal cities worldwide are vulnerable to shallow groundwater salinization caused by saltwater intrusion and anthropogenic activities. Shallow groundwater salinization can have cascading negative impacts on municipal assets, but this is rarely considered compared to impacts of salinization on water supply. Here, shallow groundwater salinity was sampled at high spatial resolution (1.3 piezometer/km2 ), then mapped and spatially interpolated. This was possible due to a uniquely extensive set of shallow piezometers installed in response to the 2010–11 Canterbury Earthquake Sequence to assess liquefaction risk. The municipal assets located within the brackish groundwater areas were highlighted. New hydrological insights for the region: Brackish groundwater areas were centred on a spit of coastal sand dunes and inside the meander of a tidal river with poorly drained soils. The municipal assets located within these areas include: (i) wastewater and stormwater pipes constructed from steel-reinforced concrete, which, if damaged, are vulnerable to premature failure when exposed to chloride underwater, and (ii) 41 parks and reserves totalling 236 ha, within which salt-intolerant groundwater-dependent species are at risk. This research highlights the importance of determining areas of saline shallow groundwater in low-lying coastal urban settings and the co-located municipal assets to allow the prioritisation of sites for future monitoring and management.

Research papers, University of Canterbury Library

In most design codes, infill walls are considered as non-structural elements and thus are typically neglected in the design process. The observations made after major earthquakes (Duzce 1999, L’Aquila 2009, Christchurch 2011) have shown that even though infill walls are considered to be non-structural elements, they interact with the structural system during seismic actions. In the case of heavy infill walls (i.e. clay brick infill walls), the whole behaviour of the structure may be affected by this interaction (i.e. local or global structural failures such as soft storey mechanism). In the case of light infill walls (i.e. non-structural drywalls), this may cause significant economical losses. To consider the interaction of the structural system with the ‘non-structural ’infill walls at design stage may not be a practical approach due to the complexity of the infill wall behaviour. Therefore, the purpose of the reported research is to develop innovative technological solutions and design recommendations for low damage non-structural wall systems for seismic actions by making use of alternative approaches. Light (steel/timber framed drywalls) and heavy (unreinforced clay brick) non-structural infill wall systems were studied by following an experimental/numerical research programme. Quasi-static reverse cyclic tests were carried out by utilizing a specially designed full scale reinforced concrete frame, which can be used as a re-usable bare frame. In this frame, two RC beams and two RC columns were connected by two un-bonded post tensioning bars, emulating a jointed ductile frame system (PRESSS technology). Due to the rocking behaviour at the beam-column joint interfaces, this frame was typically a low damage structural solution, with the post-tensioning guaranteeing a linear elastic behaviour. Therefore, this frame could be repeatedly used in all of the tests carried out by changing only the infill walls within this frame. Due to the linear elastic behaviour of this structural bare frame, it was possible to extract the exact behaviour of the infill walls from the global results. In other words, the only parameter that affected the global results was given by the infill walls. For the test specimens, the existing practice of construction (as built) for both light and heavy non-structural walls was implemented. In the light of the observations taken during these tests, modified low damage construction practices were proposed and tested. In total, seven tests were carried out: 1) Bare frame , in order to confirm its linear elastic behaviour. 2) As built steel framed drywall specimen FIF1-STFD (Light) 3) As built timber framed drywall specimen FIF2-TBFD (Light) 4) As built unreinforced clay brick infill wall specimen FIF3-UCBI (Heavy) 5) Low damage steel framed drywall specimen MIF1-STFD (Light) 6) Low damage timber framed drywall specimen MIF2-TBFD (Light) 7) Low damage unreinforced clay brick infill wall specimen MIF5-UCBI (Heavy) The tests of the as built practices showed that both drywalls and unreinforced clay brick infill walls have a low serviceability inter-storey drift limit (0.2-0.3%). Based on the observations, simple modifications and details were proposed for the low damage specimens. The details proved to be working effectively in lowering the damage and increasing the serviceability drift limits. For drywalls, the proposed low damage solutions do not introduce additional cost, material or labour and they are easily applicable in real buildings. For unreinforced clay brick infill walls, a light steel sub-frame system was suggested that divides the infill panel zone into smaller individual panels, which requires additional labour and some cost. However, both systems can be engineered for seismic actions and their behaviour can be controlled by implementing the proposed details. The performance of the developed details were also confirmed by the numerical case study analyses carried out using Ruaumoko 2D on a reinforced concrete building model designed according to the NZ codes/standards. The results have confirmed that the implementation of the proposed low damage solutions is expected to significantly reduce the non-structural infill wall damage throughout a building.

Audio, Radio New Zealand

Questions to Ministers 1. DAVID SHEARER to the Prime Minister: Does he stand by his statement in the House yesterday, in answer to Oral Question No 2, that his Government is selling assets because "New Zealanders want less debt, more productive assets, and an economy that is going to function, not a load more debt"? 2. PAUL GOLDSMITH to the Minister for Economic Development: What progress is the Government making in implementing its economic growth agenda? 3. PHIL TWYFORD to the Minister of Transport: Does the Government consider it important for its transport spending to be cost-effective and provide a good return on investment? 4. Dr RUSSEL NORMAN to the Minister for State Owned Enterprises: What, according to the Crown Ownership Monitoring Unit, was the average total shareholder return of Genesis, Meridian, Mighty River Power and Solid Energy over the last five years and how does that compare to the average cost of borrowing to the Government right now? 5. NICKY WAGNER to the Minister of Local Government: What reports has he received on how much rates increased nationally in the decade since the Local Government Act 2002 and how does this compare to the previous decade? 6. GRANT ROBERTSON to the Minister for the Environment: Does he stand by his statement made in the House yesterday in relation to the grounding of the Rena that "the statute sets down very clearly that I as Minister for the Environment should not be encouraging or discouraging a proper, independent decision by Environment Bay of Plenty as to whether they should or should not take a prosecution"? 7. KANWALJIT SINGH BAKSHI to the Minister of Broadcasting: What recent announcements has the Government made on progress towards digital switchover? 8. Rt Hon WINSTON PETERS to the Prime Minister: Does he still have confidence in all his Ministers? 9. Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: How many written comments were received on the draft Recovery Plan for the Christchurch CBD and is it his intention to consider them all before making a decision on the draft Recovery Plan for the CBD, in accordance with the process set out on the Canterbury Earthquake Recovery Authority's website? 10. MELISSA LEE to the Minister of Internal Affairs: What recent steps have there been to promote New Zealand citizenship as a successful settlement pathway for migrants? 11. CLARE CURRAN to the Minister of Broadcasting: Does he stand by the Prime Minister's statement in relation to the appointment of the Prime Minister's electorate chairman Stephen McElrea to the NZ On Air board that "if you look at the vast array of appointments we make, I think the balance is about right"? 12. CATHERINE DELAHUNTY to the Minister of Education: Will she rule out implementing Treasury's advice to increase class sizes in schools?

Research papers, University of Canterbury Library

People aged 65 years and older are the fastest growing age group in New Zealand. By the mid-2070s, there are predictions that this age group is likely to comprise approximately one third of the population. Older people are encouraged to stay in their own homes within their community for as long as possible with support to encourage the extension of ageing in place. Currently around 14% of those aged 75 years or older, make the move into retirement villages. This is expected to increase. Little is known by retirement villages about the wellbeing and health of those who decide to live independently in these facilities. Predicting the need for a continuum of care is challenging. This research measured the wellbeing and health of older adults. It was situated in a critical realist paradigm, overlaid with an empathetic axiology. A focused literature review considered the impact on wellbeing from the aspects of living place, age, gender, health status and the 2010/2011 Canterbury earthquakes. Longitudinal studies used the Enlightenment Scale and the interRAI Community Health Assessment (CHA) to measure the wellbeing and health of one group of residents (n=120) living independently in one retirement village in Canterbury, New Zealand. The research was extended to incorporate two cross-section studies when initial results for wellbeing were found to be higher than anticipated. These additional studies included participants living independently from other retirement villages (n=115) and those living independently within the community (n=354). A total of 589 participants, aged 65 – 97 years old, completed the Enlightenment Scale across the four studies. Across the living places, wellbeing continued to significantly improve with age. The Enlightenment Scale was a useful measure of wellbeing with older adults. Participants in the longitudinal studies largely maintained a relatively good health status, showing little change over the study period of 15 months. Predictions for the need for a move to supportive care were not able to be made using the CHA. The health status of participants did not influence their level of wellbeing. The key finding of note is that the wellbeing score of older adults increases by 1.27 points per year, using the Enlightenment Scale, irrespective of where they live.

Audio, Radio New Zealand

A review of the week's news including... a major health alert in Pukekohe after two and a half thousand children were exposed to contaminated water, the Prime Minister kicks off election year with a pledge to spend more than half a billion dollar on crime-fighting, is New Zealand citizenship for sale? several former employees of the Canterbury Earthquake Recovery Authority are being investigated, international Indian students to be deported, more alleged mistreatment of animals revealed at another New Zealand rodeo event, a women's sexual abuse group says the judge got it wrong when he ruled in favour of a man who posted photos of his half naked wife on Facebook, people increasingly find ways to get around petrol prices that they think are too high, should an unofficial white chair memorial to the victims of the 2011 Christchurch quake be moved? the scientific test results which reveal exactly how Havelock North's drinking water supply was contaminated, the Maori Party backs calls from a group of local councils campaigning to keep their regions free from genetic modification, a film producer is caught out by a recent law change banning anyone travelling from America from entering New Zealand with medicinal cannabis and an update on a seriously unwell albatross chick.

Audio, Radio New Zealand

A review of the week's news including... A tsunami warning after a severe 7.1 earthquake north of East Cape, Havelock North's residents finally get the chance to grill their local leaders, the Environment Minister says people who insist that every lake and river should be safe to swim in are being unrealistic, Kim Dotcom wins his bid to live stream his High Court appeal against his extradition, New Zealanders who've been living in Australia for up to ten years say they're reaching breaking point, legal action over faulty steel mesh triggers doubts about some house insurance, a prominent Maori leader is found guilty of defrauding his fellow trustees in the Wellington Tenths Trust, a South Canterbury farming official says stealing 500 cows is like stealing the Crown jewels - complicated but not impossible, Auckland mayoral candidate Vic Crone pledges to bring forward the cross-harbour tunnel project by a decade or more after saying she'd make no commitments on it, while another candidate, Phil Goff wants to introduce a living wage for all council staff, the transgender community wants the waiting times for sex change operations cut, a sit down chat with Olympic pole vaulting bronze medalist Eliza McCartney and the real story behind the 2nd Bledisloe Cup test in Wellington from a former Wallaby.

Research papers, The University of Auckland Library

This section considers forms of collaboration in situated and community projects embedded in important spatial transformation processes in New Zealand cities. It aims to shed light on specific combinations of material and semantic aspects characterising the relation between people and their environment. Contributions focus on participative urban transformations. The essays that follow concentrate on the dynamics of territorial production of associations between multiple actors belonging both to civil society and constituted authority. Their authors were directly engaged in the processes that are reported and conceptualised, thereby offering evidence gained through direct hands-on experience. Some of the investigations use case studies that are conspicuous examples of the recent post-traumatic urban development stemming from the Canterbury earthquakes of 2010-2011. More precisely, these cases belong to the early phases of the programmes of the Christchurch recovery or the Wellington seismic prevention. The relevance of these experiences for the scope of this study lies in the unprecedented height of public engagement at local, national and international levels, a commitment reached also due to the high impact, both emotional and concrete, that affected the entire society.

Research papers, University of Canterbury Library

This research investigates the validation of simulated ground motions on complex structural systems. In this study, the seismic responses of two buildings are compared when they are subjected to as-recorded ground motions and simulated ones. The buildings have been designed based on New Zealand codes and physically constructed in Christchurch, New Zealand. The recorded ground motions are selected from 40 stations database of the historical 22 Feb. 2011 Christchurch earthquake. The Graves and Pitarka (2015) methodology is used to generate the simulated ground motions. The geometric mean of maximum inter-story drift and peak floor acceleration are selected as the main seismic responses. Also, the variation of these parameters due to record to record variability are investigated. Moreover, statistical hypothesis testing is used to investigate the similarity of results between observed and simulated ground motions. The results indicate a general agreement between the peak floor acceleration calculated by simulated and recorded ground motions for two buildings. While according to the hypothesis tests result, the difference in drift can be significant for the building with a shorter period. The results will help engineers and researchers to use or revise the procedure by using simulated ground motions for obtaining seismic responses.

Research papers, University of Canterbury Library

Damage distribution maps from strong earthquakes and recorded data from field experiments have repeatedly shown that the ground surface topography and subsurface stratigraphy play a decisive role in shaping the ground motion characteristics at a site. Published theoretical studies qualitatively agree with observations from past seismic events and experiments; quantitatively, however, they systematically underestimate the absolute level of topographic amplification up to an order of magnitude or more in some cases. We have hypothesized in previous work that this discrepancy stems from idealizations of the geometry, material properties, and incident motion characteristics that most theoretical studies make. In this study, we perform numerical simulations of seismic wave propagation in heterogeneous media with arbitrary ground surface geometry, and compare results with high quality field recordings from a site with strong surface topography. Our goal is to explore whether high-fidelity simulations and realistic numerical models can – contrary to theoretical models – capture quantitatively the frequency and amplitude characteristics of topographic effects. For validation, we use field data from a linear array of nine portable seismometers that we deployed on Mount Pleasant and Heathcote Valley, Christchurch, New Zealand, and we compute empirical standard spectral ratios (SSR) and single-station horizontal-to-vertical spectral ratios (HVSR). The instruments recorded ambient vibrations and remote earthquakes for a period of two months (March-April 2017). We next perform two-dimensional wave propagation simulations using the explicit finite difference code FLAC. We construct our numerical model using a high-resolution (8m) Digital Elevation Map (DEM) available for the site, an estimated subsurface stratigraphy consistent with the geomorphology of the site, and soil properties estimated from in-situ and non-destructive tests. We subject the model to in-plane and out-of-plane incident motions that span a broadband frequency range (0.1-20Hz). Numerical and empirical spectral ratios from our blind prediction are found in very good quantitative agreement for stations on the slope of Mount Pleasant and on the surface of Heathcote Valley, across a wide range of frequencies that reveal the role of topography, soil amplification and basin edge focusing on the distribution of ground surface motion.

Research Papers, Lincoln University

‘Housing affordability’ has been a term used to refer to a problem that arises when the costs of housing are seen as being unreasonably high in relation to incomes. In the United Kingdom and Australia the local town planning systems have been used to address housing affordability issues. This response in countries that share New Zealand’s town and country planning history raised the question for this research of the local government response to housing affordability issues in the city of Christchurch, New Zealand. This research was undertaken during the fifth year after the 2010/2011 Canterbury earthquake series. Research conducted by the Centre for Housing Research Aotearoa New Zealand and the New Zealand Productivity Commission present quite different pictures of the housing affordability problem, suggest different solutions and indicate different roles for levels of government, the community housing sector and the housing market. The research undertaken for this dissertation aimed to address the question of the role of the state, through the lense of a local response to housing affordability issues, in the context of a central government response focused on land supply and reforming the Resource Management Act 1991.

Research papers, University of Canterbury Library

Christchurch City Council (Council) is undertaking the Land Drainage Recovery Programme in order to assess the effects of the earthquakes on flood risk to Christchurch. In the course of these investigations it has become better understood that floodplain management should be considered in a multi natural hazards context. Council have therefore engaged the Jacobs, Beca, University of Canterbury, and HR Wallingford project team to investigate the multihazards in eastern areas of Christchurch and develop flood management options which also consider other natural hazards in that context (i.e. how other hazards contribute to flooding both through temporal and spatial coincidence). The study has three stages:  Stage 1 Gap Analysis – assessment of information known, identification of gaps and studies required to fill the gaps.  Stage 2 Hazard Studies – a gap filling stage with the studies identified in Stage 1.  Stage 3 Collating, Optioneering and Reporting – development of options to manage flood risk. This present report is to document findings of Stage 1 and recommends the studies that should be completed for Stage 2. It has also been important to consider how Stage 3 would be delivered and the gaps are prioritised to provide for this. The level of information available and hazards to consider is extensive; requiring this report to be made up of five parts each identifying individual gaps. A process of identifying information for individual hazards in Christchurch has been undertaken and documented (Part 1) followed by assessing the spatial co-location (Part 2) and probabilistic presence of multi hazards using available information. Part 3 considers multi hazard presence both as a temporal coincidence (e.g. an earthquake and flood occurring at one time) and as a cascade sequence (e.g. earthquake followed by a flood at some point in the future). Council have already undertaken a number of options studies for managing flood risk and these are documented in Part 4. Finally Part 5 provides the Gap Analysis Summary and Recommendations to Council. The key findings of Stage 1 gap analysis are: - The spatial analysis showed eastern Christchurch has a large number of hazards present with only 20% of the study area not being affected by any of the hazards mapped. Over 20% of the study area is exposed to four or more hazards at the frequencies and data available. - The majority of the Residential Red Zone is strongly exposed to multiple hazards, with 86% of the area being exposed to 4 or more hazards, and 24% being exposed to 6 or more hazards. - A wide number of gaps are present; however, prioritisation needs to consider the level of benefit and risks associated with not undertaking the studies. In light of this 10 studies ranging in scale are recommended to be done for the project team to complete the present scope of Stage 3. - Stage 3 will need to consider a number of engineering options to address hazards and compare with policy options; however, Council have not established a consistent policy on managed retreat that can be applied for equal comparison; without which substantial assumptions are required. We recommend Council undertake a study to define a managed retreat framework as an option for the city. - In undertaking Stage 1 with floodplain management as the focal point in a multi hazards context we have identified that Stage 3 requires consideration of options in the context of economics, implementation and residual risk. Presently the scope of work will provide a level of definition for floodplain options; however, this will not be at equal levels of detail for other hazard management options. Therefore, we recommend Council considers undertaking other studies with those key hazards (e.g. Coastal Hazards) as a focal point and identifies the engineering options to address such hazards. Doing so will provide equal levels of information for Council to make an informed and defendable decision on which options are progressed following Stage 3.

Audio, Radio New Zealand

The integrity of the entire public service is under scrutiny after revelations about the close relationship between a private security firm Thompson and Clark and the SIS and the Ministry for Primary Industries. In March, the State Services Commissioner Peter Hughes ordered an investigation after it was revealed the firm spied on Canterbury earthquake claimants for Southern Response. That was was further widened to include the Ministry of Business, Innovation and Employment which has been accused by Greenpeace of using the company to spy on them. On Tuesday as a result of RNZ inquiries, Mr Hughes widened the investigation even further to cover all government department and scores of other public sector agencies such as District Health Boards. State Services Minister Chris Hipkins is demanding answers. The SIS emails show a staff member and one of the Thompson and Clark directors were old friends who met regularly. Also an OIA request from RNZ News has triggered the uncovering of what the Ministry for Primary Industries describes as potentially serious misconduct by several former staff members. Joining us to explain the details are the reporters who have been doing this digging, Checkpoint's Zac Fleming and Conan Young. Thompson and Clark's Gavin Clark declined to come on Morning Report but in an email said Thompson and Clark is willing to cooperate fully with the SSC and will await the investigation to take its natural course.

Research Papers, Lincoln University

New Zealand is one of the most highly urbanised countries in the world with well over 87 per cent of us living in 138 recognised urban centres, yet the number of people residing in inner city areas is proportionally very low. Householders have been exercising their preference for suburban or rural areas by opting for low density suburban environments. It is widely agreed that productivity and sustainability increase when people aggregate in the inner city, however there is a perceived trade-off between the density and liveability of an area. Achieving liveability in the inner city is concerned with reducing the pressures which emerge from higher population densities. Promoting inclusive societies, revitalising underutilised cityscapes, ensuring accessibility and fostering sense of place, are all elements essential to achieving liveable communities. The rebuild following the 2010 and 2011 Canterbury earthquakes provides Christchurch with an opportunity to shape a more environmentally sustainable, economically vibrant and liveable city. This research involves undertaking a case study of current inner city liveability measures and those provided for through the rebuild. A cross-case analysis with two of the world’s most liveable cities, Melbourne and Vancouver, exposes Christchurch’s potential shortcomings and reveals practical measures the city could implement in order to promote liveability.

Research papers, University of Canterbury Library

This research aims to explore how business models of SMEs revolve in the face of a crisis to be resilient. The business model canvas was used as a tool to analyse business models of SMEs in Greater Christchurch. The purpose was to evaluate the changes SMEs brought in their business models after hit by a series of earthquake in 2010 and 2011. The idea was to conduct interviews of business owners and analyse using grounded theory methods. Because this method is iterative, a tentative theoretical framework was proposed, half way through the data collection. It was realised that owner specific characteristics were more prominent in the data than the elements business model. Although, SMEs in this study experienced several operational changes in their business models such as change of location and modification of payment terms. However, the suggested framework highlights how owner specific attributes influence the survival of a small business. Small businesses and their owners are extremely interrelated that the business models personify the owner specific characteristics. In other words, the adaptation of the business model reflects the extent to which the owner possess these attributes. These attributes are (a) Mindsets – the attitude and optimism of business owner; (b) Adaptive coping – the ability of business owner to take corrective actions; and (c) Social capital – the network of a business owner, including family, friends, neighbours and business partners.

Research papers, Victoria University of Wellington

Heritage buildings are an important element of our urban environments, representing the hope and aspirations of a generation gone, reminding us of our achievements and our identity.  When heritage buildings suffer damage, or fall into disrepair they are either met by one of two extremes; a bulldozer or painstaking repair. If the decision to conserve defeats the bulldozer, current heritage practice favours restoration into a mausoleum-type monument to yesteryear. But what if, rather than becoming a museum, these heritage buildings could live on and become a palimpsest of history? What if the damage was embraced and embodied in the repair?  The Cathedral of the Blessed Sacrament on Barbadoes Street, Christchurch is the case study building for this thesis. Suffering damage in the Canterbury earthquakes of 2010 and 2011, the Cathedral sits in ruin waiting for decisions to be made around how it can be retained for future generations.  This thesis will propose a reconstruction for the Cathedral through the analysis of precedent examples of reconstructing damaged heritage buildings and guided by a heritage framework proposed in this thesis. The employed process will be documented as an alternative method for reconstructing other damaged heritage buildings.

Audio, Radio New Zealand

TODD McCLAY to the Minister of Finance: What progress has the Government made with its economic programme in 2012? Dr RUSSEL NORMAN to the Prime Minister: Does he stand by his promise to New Zealanders that "I expect high standards from my Ministers … if they don't meet the standards I set then obviously I will take action if necessary"? DAVID SHEARER to the Prime Minister: Does he stand by all his statements and have confidence in the statements of all his Ministers? NICKY WAGNER to the Minister for Canterbury Earthquake Recovery: How is the Government delivering a strong and effective recovery for greater Christchurch following the earthquakes? CHARLES CHAUVEL to the Minister of Justice: What are the specific "assumptions" based on "incorrect facts" demonstrating some "misunderstanding of New Zealand law" that she alleges are contained in the report of Justice Binnie concerning the application by Mr Bain for compensation for wrongful conviction and imprisonment? Dr PAUL HUTCHISON to the Minister of Health: What progress has the Government made on its national preventive health targets this year? Rt Hon WINSTON PETERS to the Prime Minister: Why does he have confidence in the Minister for Whānau Ora? KRIS FAAFOI to the Minister of Police: Is she committed to all of her promises in regards to the New Zealand Police? TIM MACINDOE to the Minister of Justice: What progress has been made towards achieving Better Public Services across the justice sector? HONE HARAWIRA to the Minister of Education: Does she accept the finding of the Children's Commissioner's Expert Advisory Group on Solutions to Child Poverty that a government funded food programme in low-decile schools is a simple, do-able, and low-cost solution to help children in poverty learn and achieve at school, and the recommendation that Government design and implement such a programme; if not, why not? CHRIS HIPKINS to the Minister of Education: Does she believe that her consultation process around the possible closure of residential special schools provided all those affected with an opportunity to have a meaningful say and have that say properly considered; if so, why? MELISSA LEE to the Minister for Social Development: What progress has the Government made in 2012 to shift the focus of our welfare system to one that is active, work focused and delivers better outcomes for New Zealanders?

Audio, Radio New Zealand

TODD McCLAY to the Minister of Finance: What progress has the Government made with its economic programme in 2012? Dr RUSSEL NORMAN to the Prime Minister: Does he stand by his promise to New Zealanders that "I expect high standards from my Ministers … if they don't meet the standards I set then obviously I will take action if necessary"? DAVID SHEARER to the Prime Minister: Does he stand by all his statements and have confidence in the statements of all his Ministers? NICKY WAGNER to the Minister for Canterbury Earthquake Recovery: How is the Government delivering a strong and effective recovery for greater Christchurch following the earthquakes? CHARLES CHAUVEL to the Minister of Justice: What are the specific "assumptions" based on "incorrect facts" demonstrating some "misunderstanding of New Zealand law" that she alleges are contained in the report of Justice Binnie concerning the application by Mr Bain for compensation for wrongful conviction and imprisonment? Dr PAUL HUTCHISON to the Minister of Health: What progress has the Government made on its national preventive health targets this year? Rt Hon WINSTON PETERS to the Prime Minister: Why does he have confidence in the Minister for Whānau Ora? KRIS FAAFOI to the Minister of Police: Is she committed to all of her promises in regards to the New Zealand Police? TIM MACINDOE to the Minister of Justice: What progress has been made towards achieving Better Public Services across the justice sector? HONE HARAWIRA to the Minister of Education: Does she accept the finding of the Children's Commissioner's Expert Advisory Group on Solutions to Child Poverty that a government funded food programme in low-decile schools is a simple, do-able, and low-cost solution to help children in poverty learn and achieve at school, and the recommendation that Government design and implement such a programme; if not, why not? CHRIS HIPKINS to the Minister of Education: Does she believe that her consultation process around the possible closure of residential special schools provided all those affected with an opportunity to have a meaningful say and have that say properly considered; if so, why? MELISSA LEE to the Minister for Social Development: What progress has the Government made in 2012 to shift the focus of our welfare system to one that is active, work focused and delivers better outcomes for New Zealanders?  

Audio, Radio New Zealand

Questions to Ministers 1. JONATHAN YOUNG to the Minister of Finance: What advice has he received about factors that lie behind the current turmoil we are witnessing on world financial markets, and what are the implications for New Zealand? 2. KEVIN HAGUE to the Minister of Labour: Does she still agree, as she did on 13 July 2011, with the comment made by Rt Hon John Key on 22 November 2010 that "I have no reason to believe that New Zealand safety standards are any less than Australia's and in fact our safety record for the most part has been very good"? 3. Hon ANNETTE KING to the Prime Minister: Does he stand by his answers to Oral Question No 1 yesterday when he said that the Leader of the Opposition is "just plain wrong" in relation to skills training? 4. KATRINA SHANKS to the Minister for the Environment: How have Government reforms to the Resource Management Act helped increase competition in the grocery business? 5. Hon CLAYTON COSGROVE to the Attorney-General: Will he meet with earthquake victims' families to hear directly why they need independent legal representation; if not, why not? 6. Hon JOHN BOSCAWEN to the Minister of Finance: Does he stand by his statement that "I think the New Zealand Institute of Economic Research is referring to some longer-term issues around demographic change and healthcare costs, and we share the chief executive's concern"? 7. DARIEN FENTON to the Minister of Labour: What is the timeline of the ministerial inquiry into the treatment of foreign fishing crews in New Zealand waters? 8. CHRIS AUCHINVOLE to the Minister for Communications and Information Technology: What progress is being made on the Government's goal of delivering fast broadband to rural areas? 9. Dr KENNEDY GRAHAM to the Minister for Canterbury Earthquake Recovery: Does he agree that an appropriate part of the "red zone" area along the Avon River through Christchurch should be transformed into a "green space" for memorial and recreational public purposes? 10. STUART NASH to the Minister of Finance: Does he believe the tax system is fair for all New Zealanders? 11. KANWALJIT SINGH BAKSHI to the Minister for Social Development and Employment: What steps has the Government taken to manage gateways between benefits? 12. KELVIN DAVIS to the Minister of Education: Does she stand by all of her answers to Oral Question No 8 yesterday?

Audio, Radio New Zealand

DAVID SHEARER to the Prime Minister: Is it still a fundamental purpose of his Government to narrow the wage gap between New Zealand and Australia, and to grow local wages in New Zealand? TODD McCLAY to the Minister of Finance: What recent reports has he received on the economy? Hon DAVID PARKER to the Minister of Finance: In dollar terms, what is the shortfall in the tax-take for the nine months to March revealed in yesterday’s Financial Statements compared to October’s pre-election update? Dr RUSSEL NORMAN to the Minister of Finance: How much has been raised to date by the Earthquake Kiwi Bonds and, at this rate, how many years will it take to cover the Government’s estimated $5.5 billion liability resulting from the Canterbury earthquakes? Hon TAU HENARE to the Minister for Social Development: How will Budget 2012 provide greater support for young people most at risk of long-term welfare dependency? Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: Does he stand by the Prime Minister’s statement regarding asset sales that “We are not going to do anything tricky there”? Dr JIAN YANG to the Associate Minister of Health: How is the Government expanding its programme to reduce rheumatic fever in vulnerable communities? Hon ANNETTE KING to the Minister of Housing: Does he stand by all his comments regarding housing? JULIE ANNE GENTER to the Minister of Transport: What is the plan to pay for the Government’s transport expenditure given that the Ministry of Transport’s Briefing to the Incoming Minister warns of a funding shortfall of $4.9 billion if high oil prices and low GDP growth continue? MARK MITCHELL to the Minister for Economic Development: How is the Government improving value for money in its procurement of services for the public sector? DARIEN FENTON to the Minister of Labour: Does she stand by her statement that “I do not want to see unnecessary change for change’s sake. Rather I am looking to put in place pragmatic solutions as we implement our manifesto commitments and let employers, employees and business focus on what they do best.”? Rt Hon WINSTON PETERS to the Prime Minister: Does he still have confidence in the Minister for Social Development and the Associate Ministers for Social Development; if so, why?  

Research papers, University of Canterbury Library

This thesis focuses on the role of legal preparedness for managing large-scale urban disasters in Aotearoa New Zealand. It uses the Auckland Volcanic Field as a case study to answer the question: ‘is New Zealand’s current legal framework prepared to respond to and recover from a large-scale urban disaster?’. The Auckland Volcanic Field was chosen as the main case study because a future eruption is a low likelihood, high-impact event that New Zealand is going to have to manage in the future. Case studies are a key feature of this thesis as both New Zealand based and overseas examples are used to explore the role of legal preparedness by identifying and investigating a range of legal issues that need to be addressed in advance of a future Auckland Volcanic Field eruption. Of particular interest is the impact of legal preparedness for the recovery phase. The New Zealand case studies include; Canterbury earthquake sequence 2010-2011, the Kaikōura earthquake 2016, the Auckland flooding 2018, and the North Island Severe Weather event 2023, which encompasses both the Auckland Anniversary weekend flooding and Cyclone Gabrielle. As New Zealand has not experienced a large-scale urban volcanic eruption, overseas examples are explored to provide insights into the legal issues that are volcano specific. The overseas volcanic case studies cover eruptions in Heimaey (Iceland), the Soufrière Hills (Montserrat and the Grenadines), La Soufrière (St Vincent) and Tungurahua (Ecuador). New Zealand’s past experiences highlight a trend for introducing post-event legal frameworks to manage recovery. Consequently, the current disaster management system is not prioritising legal preparedness and instead is choosing to rely on exceptional powers. Unsurprisingly, the introduction of new post-event recovery frameworks has repercussions. In New Zealand, new post-event legal frameworks are introduced swiftly under urgency, they contain broad unstructured decision-making powers, and are often flawed. As these exceptional new frameworks sit outside the ‘normal’ legal frameworks, they in effect create a parallel “shadow system”. Based on the evidence explored in this thesis it does not appear that Auckland’s current disaster management framework is prepared to deal with a large-scale urban event caused by an Auckland Volcanic Field eruption. Following this conclusion, it is the submission of this thesis that New Zealand’s current legal framework is not prepared to respond to and recover from a large-scale urban disaster. To become legally prepared, New Zealand needs to consider the legal tools required to manage large-scale urban disasters in advance. This will prevent the creation of a legal vacuum in the aftermath of disasters and the need for new recovery frameworks. Adopting a new attitude will require a change in approach towards legal preparedness which prioritises it, rather than sidelining it. This may also require changes within New Zealand’s disaster management system including the introduction of a formal monitoring mechanism, which will support and prioritise legal preparedness. This thesis has shown that not legally preparing for future disasters is a choice which carries significant consequences. None of these consequences are inevitable when managing large-scale disasters, however they are inevitable when frameworks are not legally prepared in advance. To not legally prepare, is to prepare to fail and thus create a disaster by choice.

Research papers, University of Canterbury Library

Geosynthetic reinforced soil (GRS) walls involve the use of geosynthetic reinforcement (polymer material) within the retained backfill, forming a reinforced soil block where transmission of overturning and sliding forces on the wall to the backfill occurs. Key advantages of GRS systems include the reduced need for large foundations, cost reduction (up to 50%), lower environmental costs, faster construction and significantly improved seismic performance as observed in previous earthquakes. Design methods in New Zealand have not been well established and as a result, GRS structures do not have a uniform level of seismic and static resistance; hence involve different risks of failure. Further research is required to better understand the seismic behaviour of GRS structures to advance design practices. The experimental study of this research involved a series of twelve 1-g shake table tests on reduced-scale (1:5) GRS wall models using the University of Canterbury shake-table. The seismic excitation of the models was unidirectional sinusoidal input motion with a predominant frequency of 5Hz and 10s duration. Seismic excitation of the model commenced at an acceleration amplitude level of 0.1g and was incrementally increased by 0.1g in subsequent excitation levels up to failure (excessive displacement of the wall panel). The wall models were 900mm high with a full-height rigid facing panel and five layers of Microgird reinforcement (reinforcement spacing of 150mm). The wall panel toe was founded on a rigid foundation and was free to slide. The backfill deposit was constructed from dry Albany sand to a backfill relative density, Dr = 85% or 50% through model vibration. The influence of GRS wall parameters such as reinforcement length and layout, backfill density and application of a 3kPa surcharge on the backfill surface was investigated in the testing sequence. Through extensive instrumentation of the wall models, the wall facing displacements, backfill accelerations, earth pressures and reinforcement loads were recorded at the varying levels of model excitation. Additionally, backfill deformation was also measured through high-speed imaging and Geotechnical Particle Image Velocimetry (GeoPIV) analysis. The GeoPIV analysis enabled the identification of the evolution of shear strains and volumetric strains within the backfill at low strain levels before failure of the wall thus allowing interpretations to be made regarding the strain development and shear band progression within the retained backfill. Rotation about the wall toe was the predominant failure mechanism in all excitation level with sliding only significant in the last two excitation levels, resulting in a bi-linear displacement acceleration curve. An increase in acceleration amplification with increasing excitation was observed with amplification factors of up to 1.5 recorded. Maximum seismic and static horizontal earth pressures were recorded at failure and were recorded at the wall toe. The highest reinforcement load was recorded at the lowest (deepest in the backfill) reinforcement layer with a decrease in peak load observed at failure, possibly due to pullout failure of the reinforcement layer. Conversely, peak reinforcement load was recorded at failure for the top reinforcement layer. The staggered reinforcement models exhibited greater wall stability than the uniform reinforcement models of L/H=0.75. However, similar critical accelerations were determined for the two wall models due to the coarseness of excitation level increments of 0.1g. The extended top reinforcements were found to restrict the rotational component of displacement and prevented the development of a preliminary shear band at the middle reinforcement layer, contributing positively to wall stability. Lower acceleration amplification factors were determined for the longer uniform reinforcement length models due to reduced model deformation. A greater distribution of reinforcement load towards the top two extended reinforcement layers was also observed in the staggered wall models. An increase in model backfill density was observed to result in greater wall stability than an increase in uniform reinforcement length. Greater acceleration amplification was observed in looser backfill models due to their lower model stiffness. Due to greater confinement of the reinforcement layers, greater reinforcement loads were developed in higher density wall models with less wall movement required to engage the reinforcement layers and mobilise their resistance. The application of surcharge on the backfill was observed to initially increase the wall stability due to greater normal stresses within the backfill but at greater excitation levels, the surcharge contribution to wall destabilising inertial forces outweighs its contribution to wall stability. As a result, no clear influence of surcharge on the critical acceleration of the wall models was observed. Lower acceleration amplification factors were observed for the surcharged models as the surcharge acts as a damper during excitation. The application of the surcharge also increases the magnitude of reinforcement load developed due to greater confinement and increased wall destabilising forces. The rotation of the wall panel resulted in the progressive development of shears surface with depth that extended from the backfill surface to the ends of the reinforcement (edge of the reinforced soil block). The resultant failure plane would have extended from the backfill surface to the lowest reinforcement layer before developing at the toe of the wall, forming a two-wedge failure mechanism. This is confirmed by development of failure planes at the lowest reinforcement layer (deepest with the backfill) and at the wall toe observed at the critical acceleration level. Key observations of the effect of different wall parameters from the GeoPIV results are found to be in good agreement with conclusions developed from the other forms of instrumentation. Further research is required to achieve the goal of developing seismic guidelines for GRS walls in geotechnical structures in New Zealand. This includes developing and testing wall models with a different facing type (segmental or wrap-around facing), load cell instrumentation of all reinforcement layers, dynamic loading on the wall panel and the use of local soils as the backfill material. Lastly, the limitations of the experimental procedure and wall models should be understood.

Research papers, The University of Auckland Library

During the 2010/2011 Canterbury earthquakes, several reinforced concrete (RC) walls in multi-storey buildings formed a single crack in the plastic hinge region as opposed to distributed cracking. In several cases the crack width that was required to accommodate the inelastic displacement of the building resulted in fracture of the vertical reinforcing steel. This type of failure is characteristic of RC members with low reinforcement contents, where the area of reinforcing steel is insufficient to develop the tension force required to form secondary cracks in the surrounding concrete. The minimum vertical reinforcement in RC walls was increased in NZS 3101:2006 with the equation for the minimum vertical reinforcement in beams also adopted for walls, despite differences in reinforcement arrangement and loading. A series of moment-curvature analyses were conducted for an example RC wall based on the Gallery Apartments building in Christchurch. The analysis results indicated that even when the NZS 3101:2006 minimum vertical reinforcement limit was satisfied for a known concrete strength, the wall was still susceptible to sudden failure unless a significant axial load was applied. Additionally, current equations for minimum reinforcement based on a sectional analysis approach do not adequately address the issues related to crack control and distribution of inelastic deformations in ductile walls.