Search

found 6122 results

Images, eqnz.chch.2010

Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...

Images, eqnz.chch.2010

A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.

Images, eqnz.chch.2010

A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.

Images, eqnz.chch.2010

A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.

Images, eqnz.chch.2010

Christchurch "New Zealand" architecture building "Demolition of old Millers building" demolition detail rubbleDemolition started on the old Millers building on a walk around Christchurch May 6, 2013 New Zealand. The building was originally designed in 1935 by G. A. Hart for the retail store, factory and warehouse Millers and was completed in 19...

Images, eqnz.chch.2010

Demolition work on Christchurch's "distinctive" former civic building and the Front Runner store. On a walk around Christchurch May 9, 2013 New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department s...

Images, eqnz.chch.2010

The centennial pool demolition is under way. On a walk around the city to catch up on events happening June 18, 2014 Christchurch New Zealand. Swimsuits have been hung on the fence around the Centennial Pool by campaigners against the complex's demolition. The Armagh St facility is being pulled down to make way for the new Margaret Mahy Fami...

Images, eqnz.chch.2010

I am going away for a short time for a holiday and well get back to you all when I get home. Demotion of the Victoria Sq apartments on a walk around the city Feb 26, 2014 Christchurch New Zealand. www...

Images, eqnz.chch.2010

The centennial pool demolition is under way. On a walk around the city to catch up on events happening June 18, 2014 Christchurch New Zealand. Swimsuits have been hung on the fence around the Centennial Pool by campaigners against the complex's demolition. The Armagh St facility is being pulled down to make way for the new Margaret Mahy Fami...

Images, eqnz.chch.2010

Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand. Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store. It featured the South Island's first escalator, which...

Images, eqnz.chch.2010

Porritt Park was, before the earthquakes, the headquarters of hockey in this region. Two astro-turf fields (the main one was other side of the building), and corporate offices etc. The earthquakes buckled all the playing surfaces and damaged the buildings; a couple of smaller ones have been removed. Hockey shifted the other side of the city t...

Images, eqnz.chch.2010

The Forsyth Barr building has stood silent and empty (except the occasional intruder and pigeons) since the February 2011 earthquake. It was sold "as is" and I understand that it is now going to be fitted out as a hotel. This is the building that had severe stairwell damage during the quake necessitating people being lowered via ropes etc on t...

Images, eqnz.chch.2010

One of the most beautiful pieces of wall art (added to the blank walls after buildings were demolished following the earthquakes) in Christchurch, is now being hidden by a new building in front of it. www.flickr.com/photos/johnstewartnz/15499321681/in/...

Images, eqnz.chch.2010

Demolition of the relatively new seven-storey Waters Edge Apartments in Ferrymead continues. CERES Environmental NZ are doing the job for CERA (Canterbury Earthquake Recovery Authority). Some will be pleased to see this block go as there was lot of resentment to it being built on the site of the old Ferrymead Tavern, Selected for Explore, #347...

Images, eqnz.chch.2010

Pigeons sit on the remains of one of the tallest buildings in Christchurch that was 95% demolished two or three years ago. The basement (now filled with water) and the columns remain. Demolished due to damage from the Christchurch 2011 earthquake.

Images, eqnz.chch.2010

20160419_7732_7D2-400 The City is in Rebuild phase (110/366) A totally different view to a few years ago. Most of the tall buildings have gone and construction is underway on a lot of new buildings, View from across the Estuary in Redcliffs. A couple of days ago the government agency controlling the post-earthquake work (CERA - Canterbury Ea...

Images, eqnz.chch.2010

20160703_144759_GT-S7275T-04 New sea wall at Redcliffs (185/366) I went for a drive in my second car mainly to charge the battery up and forgot to take my camera gear so only had my phone. This is the new rock wall to replace the severely damaged previous one (in the February 2011 earthquake). Work is still underway on the car parking and p...

Images, eqnz.chch.2010

AMI Stadium (Lancaster Park), not used since the February 2011 earthquake. It was used predominantly for rugby and cricket. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired. The concrete pad lower left is ...

Images, eqnz.chch.2010

The South New Brighton jetty has been closed for 3 or 4 years (fenced off) then the fence was removed and it was "open", but nothing has happened to it since the earthquakes, but it is closed again now, although it looks like a home made sign!

Images, eqnz.chch.2010

The ticket office at Lancaster Park (AMI Stadium), not used since the February 2011 earthquake. Windows broken and door boarded up. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.

Images, eqnz.chch.2010

Today was the first time I have been to the earthquake memorial since it was completed and opened on 22nd February 2017, six years after the devastating quake that killed the 185 that are named on this wall. I knew two of the people on the list.

Images, eqnz.chch.2010

Six ½ years after the earthquakes there are still a few demolitions taking place. This one is a block of council owned flats. Whether the whole complex is being demolished or not I don't know., but here the centre block of three is being demolished. The green grass is what was sections and houses demolished in 2012-2015 as it is too close to t...