Photograph captioned by BeckerFraserPhotos, "139 Armagh Street".
Photograph captioned by BeckerFraserPhotos, "Mounds of demolition debris at the site of the Copthorne Durham on the corner of Durham and Kilmore Streets being sprayed with water to keep the dust down".
A photograph captioned by BeckerFraserPhotos, "A view looking west from the intersection of Manchester Street and Hereford Street".
Photograph captioned by BeckerFraserPhotos, "The Colombo Street bridge over the Avon River".
Photograph captioned by BeckerFraserPhotos, "Cambridge Terrace, near the Colombo Street Bridge. The melancholy air of this stretch of the river bank matches the sombre tone of the PGC site just across the road, where 18 people died".
A photograph captioned by BeckerFraserPhotos, "A crane lifting roof material off a demolition building at 705 Colombo Street".
A photograph of the Isaac Theatre Royal on Gloucester Street.
Photograph captioned by BeckerFraserPhotos, "Glass that fell from the Brannigan's Building, finally swept up".
A photograph captioned by BeckerFraserPhotos, "An excavator demolishing the Contours Gym on the corner of Durham and Armagh Streets".
Photograph captioned by BeckerFraserPhotos, "Retrieved office material on the pavement of Hereford Street".
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
Photograph captioned by BeckerFraserPhotos, "230 Manchester Street".
A photograph captioned by BeckerFraserPhotos, "A view from Cambridge Terrace towards Cathedral Square. The partially deconstructed Hotel Grand Chancellor no longer dominates the sky line. Here it appears between the PricewaterhouseCoopers building on the left and the Novotel Hotel on the right".
A photograph captioned by BeckerFraserPhotos, "A view looking north from the intersection of Manchester Street and Hereford Street".
Photograph captioned by BeckerFraserPhotos, "The Salvation Army Christchurch City Corps".
A photograph captioned by BeckerFraserPhotos, "A few flowers still blooming on the floral clock in Victoria Square".
A photograph of an abandoned camera tripod and Buzzy Bee toy in Cathedral Square.
Photograph captioned by BeckerFraserPhotos, "District Court, 284 Durham Street".
Photograph captioned by BeckerFraserPhotos, "299 Durham Street".
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
Photograph captioned by BeckerFraserPhotos, "Struthers Lane - Sol Square".
Photograph captioned by BeckerFraserPhotos, "Intersection of Peterborough and Durham Streets looking east".
A photograph of the temporary CERA offices in Cathedral Square.