Search

found 1299 results

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Reverend Peter Beck leading a prayer at the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) opening. Mayor Bob Parker is standing to the right of Reverend Peter Beck. The ceremony was held in Burwood Park.

Images, UC QuakeStudies

A powhiri performed by Ngai Tahu elders to welcome workers of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Reverend Peter Beck and Earthquake Minister Gerry Brownlee can be seen standing amongst the group. The ceremony was held in Burwood Park.

Images, UC QuakeStudies

A powhiri performed by Ngai Tahu elders to welcome workers of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Phil Goff is standing in the centre of the group that is being welcomed. Two cameras are filming the welcome. The ceremony was held in Burwood Park.

Images, UC QuakeStudies

A camera man filming Christchurch Mayor Bob Parker and Earthquake Recovery Minister Gerry Brownlee handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). A contractor is standing to the left.

Images, UC QuakeStudies

Members of the USAID Disaster Assistance Response Team (DART) and the New Zealand Urban Search and Rescue, breaking through the floor of a building which was severely damaged during the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of a member of the Wellington Emergency Management Office Emergency Response Team walking across Manchester Street. In the background is a block of earthquake-damaged buildings. Large sections of the buildings have collapsed and the rubble has spilled onto the street below.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team and the Red Cross, standing on the corner of Lichfield and High Streets. In the background large piles of rubble from earthquake-damaged buildings line the street.

Images, UC QuakeStudies

A team of Fire Service and Search and Rescue personnel using a crane to check the Forsyth Barr building for people trapped by the 22 February 2011 earthquake. A sign reading, "Help" has been stuck to one of the windows and a window above has already been broken by the team.

Images, UC QuakeStudies

A powhiri performed by Ngai Tahu elders to welcome workers of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Reverend Peter Beck and Earthquake Minister Gerry Brownlee can be seen standing amongst the group. The ceremony was held in Burwood Park.

Images, UC QuakeStudies

Members of the USAID Disaster Assistance Response Team and New Zealand Urban Search and Rescue Team in front of a collapsed house in the Christchurch central city. In the background, the Newstalk ZB Building can be seen.

Research Papers, Lincoln University

The 48hr Design Challenge, run by the Christchurch City Council and held at Lincoln University, provided an opportunity for Council to gain inspiration from the design and architecture industry, while testing the draft Central City Plan currently being developed. The Challenge was a response to the recent earthquakes in Christchurch and brought together local and international talent. A total of 15 teams took part in the Challenge, with seven people in each including engineers, planners, urban designers, architects and landscape architects, as well as one student on each team. The four sites within the Red Zone included the Cathedral Square and BNZ Building; 160 Gloucester Street; the Orion NZ Building at 203 Gloucester Street; and 90 Armagh Street, including the Avon River and Victoria Square. The fifth site, which sits outside the Red Zone, is the former Christchurch Women’s Hospital at 885 Colombo Street. This is team SoLA's entry for 160 Gloucester Street.

Images, UC QuakeStudies

A powhiri performed by Ngai Tahu elders to welcome workers of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Reverend Peter Beck is standing in the centre and Earthquake Minister Gerry Brownlee to the left. The ceremony was held in Burwood Park.

Images, UC QuakeStudies

Members of the Disaster Assistance Response Team outside the US headquarters in Latimer Square. Latimer Square was set up as a temporary headquarters for emergency management personnel after the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office walking down Lichfield Street towards the intersection of Madras Street. Buildings on either side of the team have been damaged by the earthquake and there are piles of rubble on the street in front of them.