Search

found 2167 results

Images, eqnz.chch.2010

20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...

Images, UC QuakeStudies

Photograph captioned by Fairfax, "A unit of about 15 New Zealand Territorial Army soldiers prepare to sandbag a broken pumping station in New Brighton to stop water pouring into neighbouring properties. The pumping station on the corner of Palmers Road and New Brighton Road was badly damaged and water was pouring onto both streets".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "A unit of about 15 New Zealand Territorial Army soldiers prepare to sandbag a broken pumping station in New Brighton to stop water pouring into neighbouring properties. The pumping station on the corner of Palmers Road and New Brighton Road was badly damaged and water was pouring onto both streets".

Images, UC QuakeStudies

The damaged Ozone Hotel on Marine Parade. Fallen bricks lie on the ground in front of the building, which is surrounded by security fencing. The photographer comments, "A bike ride to New Brighton and the beach 3 weeks after the Feb 22 quake. Roads were still very rough and under reconstruction. Some buildings are still standing. but don't look too healthy".