A photograph of the south end of Latimer Square near Hereford Street. A generator has been hooked up to a power board which has several power plugs attached to it. A crate of supplies is sitting behind the power board. Wire fencing has been set up in the background as a cordon, and emergency tape has been draped between the trees. Behind this there are earthquake-damaged buildings, excavators and their parts, and rubble on Madras Street.
The Cabinet has decided to make an initial 5-million-dollar contribution to the Christchurch mayoral fund set up to help with the earthquake clean up.
A photograph of emergency management personnel in Latimer Square. In the background, tents have been set up for the USAID and Singapore Rescue teams.
A photograph of the Atmosphere project being set up for LUXCITY.
A photograph of the Atmosphere project being set up for LUXCITY.
A photograph of the Atmosphere project being set up for LUXCITY.
A photograph of the Atmosphere project being set up for LUXCITY.
A photograph of the Atmosphere project being set up for LUXCITY.
A bicycle set up in Gap Filler's cycle-powered cinema equipment.
A photograph of the Atmosphere project being set up for LUXCITY.
A photograph of Worcester Street near Latimer Square. A police car is parked on the road. In the distance, tents have been set up in Latimer Square.
A photograph of emergency management personnel running a USAR station in Latimer Square. The station is made up of wooden struts with a tarpaulin roof and walls.
A stage being set up across the Avon River on Hagley Park.
A photograph of an excavator clearing the rubble from earthquake-damaged buildings on Lichfield Street. The rubble has been gathered from the street and piled up beside the Majestic Theatre.
A photograph of an excavator clearing the rubble from earthquake-damaged buildings on Lichfield Street. The rubble has been gathered from the street and piled up beside the Majestic Theatre.
A photograph of a group of tents in Latimer Square. The tents were set up as temporary accommodation for emergency management personnel after the 22 February 2011 earthquake.
A photograph of tents pitched at the On-Site Operations Coordination Centre (OSOCC) in Latimer Square. The OSOCC was set up by the United Nations Emergency Relief Coordinator.
A photograph of a portable shower unit set up in Hagley Park for the emergency management personnel who travelled to Christchurch after the 22 February 2011 earthquake. A clothes line has been set up by tying ropes to the shower unit and a digger. To the right, a number of portaloos can also be seen.
A photograph of rubble in a car park behind the Forsyth Barr building. The rubble is mostly made up of concrete staircases with messages spray-painted on the sides.
Reporter Jessica Horn is at Burnside High School, where a welfare centre has been set up.
The four members of a panel set up to monitor emergency regulations governing the rebuilding of Canterbury say they did not ask for the higher-than-standard fees set by the Cabinet.
A photograph looking north up Barbadoes Street from the intersection of Gloucester Street. In the distance there is a cloud of dust and a partially-collapsed fish-and-chip store.
A photograph looking north up Barbadoes Street from the intersection of Gloucester Street. In the distance there is a cloud of dust and a partially-collapsed fish-and-chip store.
A photograph of a temporary welfare headquarters set up by Civil Defence.
A photograph of rubble in a car park behind the Forsyth Barr building. The rubble is mostly made up of concrete staircases. Two emergency management personnel are standing in the foreground.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team relaxing on stretcher beds. The stretchers were set up in the hall of the Rimu Park Scout Camp.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team relaxing on stretcher beds. The stretchers were set up in the hall of the Rimu Park Scout Camp.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team relaxing on stretcher beds. The stretchers were set up in the hall of the Rimu Park Scout Camp.
A photograph of rubble in a car park behind the Forsyth Barr building. The rubble is mostly made up of concrete staircases. An emergency management team member is standing to the right.
A photograph of a group of tents set up in Latimer Square next to the USAID tent. The tents were used as temporary accommodation for emergency management personnel after the 22 February 2011 earthquake.