Search

found 603 results

Videos, UC QuakeStudies

A video of an interview with Chris Bartholomeusz, Construction Manager at Downer Construction, about the work the team has been doing to stabilise a former quarry on Gleaning Spur. More than 12,000 cubic metres of soil have been removed from the hillside in order to remove a risk of a landslide hitting the houses below.

Images, UC QuakeStudies

A worker uses a large water-blasting pipe to clear blocked drains. The photographer comments, "These guys worked really hard late at night to remove the liquefaction blocking our drains, but did not pre-warn people. Our elderly neighbour's toilet was drenched in water".