The decision on what to do with Christchurch's earthquake damaged redzone is one step closer, with the end of the public consultation period on the plan for the area. Over the past month Christchurch people have been asked to comment on a draft land use plan for the 602 hectares of land. Now those pitching ideas want the authorities to get on with the next step, so they can have some certainty about whether their projects can go ahead.
It's been a long road to recovery for one of Christchurch's biggest post-quake projects. Eight years after the route connecting Sumner to Lyttleton was blocked off by the earthquakes, the road through Evans Pass will reopen on Friday. Sumner residents will now have a second route into the suburb, as well as a renewed connection to Lyttleton. Sara Templeton is the councillor for Heathcote Ward, which covers Sumner, and speaks to Guyon Espiner.
The company running the restoration of Christchurch's Anglican Cathedral is confident it will be able to raise the extra $51 million still needed to finish the job, and says potential large donors are already being approached here and overseas.
The building has sat derelict since the 2011 earthquake and now the cost to fix it has soared from an original estimate of $104 million to $154 million.
Some Cantabrians are finding the price hard to justify.
The director of the restoration project Keith Paterson speaks to Corin Dann.
Tests have revealed that New Zealand's latest building designs will stand up to earthquakes of a greater intensity than the ones that occurred in Christchurch and Kaikōura. Researchers from the University of Auckland and Canterbury, in collaboration with QuakeCoRE and Tongji University in China, built a two-storey concrete building and put it on one of the largest shake tables in the world. All of the building's details were based on existing buildings in Wellington and Christchurch. The project leader is the University of Auckland's Dr Rick Henry. He talks to Guyon Espiner.
Two projects are documented within this MEM Report: I. The first project examined what was learnt involving the critical infrastructure in the aftermath of natural disasters in the Canterbury region of New Zealand – the most prominent being the series of earthquakes between 2010 and 2011. The project identified several learning gaps, leading to recommendations for further investigations that could add significant value for the lifeline infrastructure community. II. Following the Lifeline Lesson Learnt Project, the Disaster Mitigation Guideline series was initiated with two booklets, one on Emergency Potable Water and a second on Emergency Sanitation. The key message from both projects is that we can and must learn from disasters. The projects described are part of the emergency management, and critical infrastructure learning cycles – presenting knowledge captured by others in a digestible format, enabling the lessons to be reapplied. Without these kinds of projects, there will be fewer opportunities to learn from other’s successes and failures when it comes to preparing for natural disasters.
Organisations locate strategically within Business Districts (CBDs) in order to cultivate their image, increase their profile, and improve access to customers, suppliers, and services. While CBDs offer an economic benefit to organisations, they also present a unique set of hazard vulnerabilities and planning challenges for businesses. As of May 2012, the Christchurch CBD has been partially cordoned off for over 14 months. Economic activity within the cordoned CBD, which previously contained 6,000 businesses and over 51,000 workers, has been significantly diminished and organisations have been forced to find new ways of operating. The vulnerabilities and resilience of CBDs not only influences outcomes for CBD organisations, but also the broader interconnected (urban/regional/national) system. A CBD is a hub of economic, social, and built infrastructure within a network of links and nodes. When the hub is disrupted all of the people, objects, and transactions that usually flow into and out of the hub must be redirected elsewhere. In an urban situation this means traffic jams in peripheries of the city, increased prices of commercial property, and capital flight; all of which are currently being faced in Canterbury. This report presents the lessons learned from organisations in CBDs affected by the Canterbury earthquakes. Here we focus on the Christchurch CBD; however, several urban town centres were extensively disrupted by the earthquakes. The statistics and discussion presented in this report are based on the results of an ongoing study conducted by Resilient Organisations (www.resorgs.org.nz). The data was captured using two questionnaire surveys of Canterbury organisations (issued November 2010 and May 2011), interviews with key informants, and in-depth case studies of organisations. Several industry sectors were sampled, and geographic samples of organisations in the Christchurch CBD, Lyttelton, and the Kaiapoi town centre were also collected. Results in this report describing “non-CBD organisations” refer to all organisations outside of the Christchurch CBD, Lyttelton, and Kaiapoi town centres.
The earthquake sequence has resulted in significant physical and reputational damage to the Canterbury tourism industry. Eighteen months after the earthquakes inbound tourism data is still below pre-earthquake levels, with Canterbury operators reporting that the industry has not bounced back to where it was before September 2010. Outcomes of the earthquakes on business performance highlight there were winners and losers in the aftermath. Recovery of inbound tourism markets is closely tied to the timeframe to rebuild the CBD of Christchurch. Reinstating critical tourism infrastructure will drive future tourism investment, and allow tourism businesses to regenerate and thrive into the future. A blueprint for rebuilding the CBD of Christchurch was released by the Christchurch City Council in July 2012, and has been well received by tourism stakeholders in the region. The challenge now is for city officials to fund the development projects outlined in the blueprint, and to rebuild the CBD as quickly as possible in order to help regenerate the tourism industry in Christchurch, Canterbury and the rest of the South Island
The Master of Engineering Management Project was sponsored by the Canterbury Earthquake Recovery Authority (CERA) and consisted of two phases: The first was an analysis of existing information detailing the effects of hazardous natural events on Canterbury Lifeline Utilities in the past 15 years. The aim of this “Lessons Learned” project was to produce an analysis report that identified key themes from the research, gaps in the existing data and to provide recommendations from these “Lessons Learned.” The Second phase was the development of a practical “Disaster Mitigation Guideline” that outlined lessons in the field of Emergency Sanitation. This research would build upon the first stage and would draw from international reference to develop a guideline that has practical implementation possibilities throughout the world.
"The Stories that we tell shape us to be who we are", a report by Elizabeth Ashby produced as part of her Summer Research Scholarship on the Women's Unheard Voices project.
Late in 2014 we were contacted by contractors working on a rebuild project in Christchurch’s city centre. It was reported that a number of bottles had been uncovered during routine earthworks and the area cordoned off until our arrival. The bottles … Continue reading →
A remote-operated digger has started work on Christchurch Cathedral removing rubble from the historic building.
It's a job project managers are describing as a world first - and a significant breakthrough in the clean up of Christchurch's earthquake damaged Cathedral.
Adam Burns reports.
Christchurch has a big bill to contend with, if it still wants the multi-use stadium that's been in the works since the earthquakes 11 years ago.
The problem-plagued project has blown out another $150 million, meaning it's going to cost $680 million and counting. The finish date's been pushed out too - to April 2026.
Christchurch City Council's punting the hefty decision making back to the ratepayers. The options - increase the budget, scale back the project, or halt work altogether.
Tessa Guest reports, and Crusaders CEO Colin Mansbridge talks to Lisa Owen.
This report to RCP Ltd and University of Canterbury summarises the findings of a 5 month secondment to the CERA Port Hills Land Clearance Team. Improvement strategies were initiated and observed. The Port Hills Land Clearance Programme is the undertaking of the demolition of all built structures from the Crown’s compulsory acquired 714 residential red zoned properties. These properties are zoned red due to an elevated life risk as a result of geotechnical land uncertainty following the 2011 Canterbury Earthquakes.
Following the Christchurch earthquake of 22 February 2011 a number of researchers were sent to Christchurch, New Zealand to document the damage to masonry buildings as part of “Project Masonry”. Coordinated by the Universities of Auckland and Adelaide, researchers came from Australia, New Zealand, Canada, Italy, Portugal and the US. The types of masonry investigated were unreinforced clay brick masonry, unreinforced stone masonry, reinforced concrete masonry, residential masonry veneer and churches; masonry infill was not part of this study. This paper focuses on the progress of the unreinforced masonry (URM) component of Project Masonry. To date the research team has completed raw data collection on over 600 URM buildings in the Christchurch area. The results from this study will be extremely relevant to Australian cities since URM buildings in New Zealand are similar to those in Australia.
Christchurch City Council (Council) is undertaking the Land Drainage Recovery Programme in order to assess the effects of the earthquakes on flood risk to Christchurch. In the course of these investigations it has become better understood that floodplain management should be considered in a multi natural hazards context. Council have therefore engaged the Jacobs, Beca, University of Canterbury, and HR Wallingford project team to investigate the multihazards in eastern areas of Christchurch and develop flood management options which also consider other natural hazards in that context (i.e. how other hazards contribute to flooding both through temporal and spatial coincidence). The study has three stages: Stage 1 Gap Analysis – assessment of information known, identification of gaps and studies required to fill the gaps. Stage 2 Hazard Studies – a gap filling stage with the studies identified in Stage 1. Stage 3 Collating, Optioneering and Reporting – development of options to manage flood risk. This present report is to document findings of Stage 1 and recommends the studies that should be completed for Stage 2. It has also been important to consider how Stage 3 would be delivered and the gaps are prioritised to provide for this. The level of information available and hazards to consider is extensive; requiring this report to be made up of five parts each identifying individual gaps. A process of identifying information for individual hazards in Christchurch has been undertaken and documented (Part 1) followed by assessing the spatial co-location (Part 2) and probabilistic presence of multi hazards using available information. Part 3 considers multi hazard presence both as a temporal coincidence (e.g. an earthquake and flood occurring at one time) and as a cascade sequence (e.g. earthquake followed by a flood at some point in the future). Council have already undertaken a number of options studies for managing flood risk and these are documented in Part 4. Finally Part 5 provides the Gap Analysis Summary and Recommendations to Council. The key findings of Stage 1 gap analysis are: - The spatial analysis showed eastern Christchurch has a large number of hazards present with only 20% of the study area not being affected by any of the hazards mapped. Over 20% of the study area is exposed to four or more hazards at the frequencies and data available. - The majority of the Residential Red Zone is strongly exposed to multiple hazards, with 86% of the area being exposed to 4 or more hazards, and 24% being exposed to 6 or more hazards. - A wide number of gaps are present; however, prioritisation needs to consider the level of benefit and risks associated with not undertaking the studies. In light of this 10 studies ranging in scale are recommended to be done for the project team to complete the present scope of Stage 3. - Stage 3 will need to consider a number of engineering options to address hazards and compare with policy options; however, Council have not established a consistent policy on managed retreat that can be applied for equal comparison; without which substantial assumptions are required. We recommend Council undertake a study to define a managed retreat framework as an option for the city. - In undertaking Stage 1 with floodplain management as the focal point in a multi hazards context we have identified that Stage 3 requires consideration of options in the context of economics, implementation and residual risk. Presently the scope of work will provide a level of definition for floodplain options; however, this will not be at equal levels of detail for other hazard management options. Therefore, we recommend Council considers undertaking other studies with those key hazards (e.g. Coastal Hazards) as a focal point and identifies the engineering options to address such hazards. Doing so will provide equal levels of information for Council to make an informed and defendable decision on which options are progressed following Stage 3.
This report forms part of a research project examining rural community resilience to natural hazard events, with a particular focus on transient population groups. A preliminary desktop and scoping exercise was undertaken to examine nine communities affected by the Kaikoura earthquake and to identify the variety of transient population groups that are commonly (and increasingly) found in rural New Zealand (see Wilson & Simmons, 2017). From this, four case study communities – Blenheim, Kaikoura, Waiau and St Arnaud – were selected to represent a range of settlement types.
These communities varied in respect of social, economic and geographic features, including the presence of particular transient population groups, and earthquake impact. While the 2016 Kaikoura earthquake provided a natural hazard event on which to focus the research, the research interest was in long-term (and broad) community resilience, rather than short-term (and specific) response and recovery actions which occurred post-earthquake.
This paper reports on a service-learning public journalism project in which postgraduate journalism students explore ways to engage with and report on diverse communities. Media scholars have argued that news media, and local newspapers in particular, must re-engage with their communities. Likewise, journalism studies scholars have urged educators to give journalism students greater opportunities to reflect on their work by getting out among journalism’s critics, often consumers or citizens concerned about content and the preparation of future journalists. The challenge for journalism educators is to prepare students for working in partnership with communities while also developing their ability to operate reflectively and critically within the expectations of the news media industry and wider society. The aim of this project has been to help students find ways to both listen and lead in a community, and also reflect on the challenges and critiques of community journalism practices. The project began in 2013 with stories about residents’ recovery following the devastating 2011 Canterbury earthquakes, and aimed to create stories that could contribute to community connection and engagement, and thereby resilience and recovery. The idea was inspired by research about post-disaster renewal that indicated that communities with strong social capital and social networks were more resilient and recovered more quickly and strongly. The project’s longer-term aim has been to explore community journalism practices that give greater power to citizens and communities by prioritising listening and processes of engagement. Over several months, students network with a community group to identify subjects with whom they will co-create a story, and then complete a story on which they must seek the feedback of their subject. Community leaders have described the project as a key example of how to do things “with people not to people”, and an outstanding contribution to the community-led component of Canterbury’s recovery. Analysis of student reflections, which are a key part of each year’s project, reveals the process of engaging with communities has helped students to map community dynamics, think more critically about source relationships, editorial choices and objectivity norms, and to develop a perspective on the diverse ways they can go about their journalism in the future. Each year, students partner with different groups and organisations, addressing different themes each time the project runs. For 2016, the programme proposes to develop the project in a new way, by not just exploring a community’s stories but also exploring its media needs and it aims to work with Christchurch’s new migrant Filipino community to develop the groundwork for a community media and/or communication platform, which Filipino community leaders say is a pressing need. For this iteration, journalism students will be set further research tasks aimed at deepening their ‘public listening’: they will conduct a survey of community members’ media use and needs as well as qualitative research interviews. It is hoped that the data collected will strengthen students’ understanding of their own journalism practice, as well as form the basis for work on developing media tools for minority groups who are generally poorly represented in mainstream media. In 2015, the journalism programme surveyed its community partners and held follow-up interviews with 13 of 18 story subjects to elicit further feedback on its news content and thereby deepen understanding of different community viewpoints. The survey and interview data revealed the project affected story subjects in a number of positive and interesting ways. Subjects said they appreciated the way student reporters took their time to build relationships and understand the context of the community groups with which they were involved, and contrasted this with their experience of professional journalists who had held pre-conceived assumptions about stories and/or rushed into interviews. As a direct consequence of the students’ approach, participants said they better trusted the student journalists to portray them accurately and fairly. Most were also encouraged by the positive recognition stories brought and several said the engagement process had helped their personal development, all of which had spin-offs for their community efforts. The presentation night that wraps up each year’s project, where community groups, story subjects and students come together to network and share the final stories, was cited as a significant positive aspect of the project and a great opportunity for community partners to connect with others doing similar work. Community feedback will be sought in future projects to inform and improve successive iterations.
There are many things that organisations of any size can do to prepare for a disaster or crisis. Traditionally, the advice given to business has focused on identifying risks, reducing their likely occurrence, and planning in advance how to respond. More recently, there is growing interest in the broader concept of organisational resilience which includes planning for crisis but also considers traits that lead to organisational adaptability and ability to thrive despite adverse circumstances. In this paper we examine the policy frameworks1 within New Zealand that influence the resilience of small and medium sized businesses (SMEs). The first part of the paper focuses on the New Zealand context, including the prevailing political and economic ideologies, the general nature of New Zealand SMEs and the nature of New Zealand’s hazard environment. The paper then goes on to outline the key policy frameworks in place relevant to SMEs and hazards. The final part of the paper examines the way the preexisting policy environment influenced the response of SMEs and Government following the Canterbury earthquakes.
Abstract The original intention for the Partnership Community Worker (PCW) project in 2006 was for it to be an extension of the Pegasus Health General Practice and furthermore to be a bridge between the community and primary healthcare. It was believed that a close working relationship between the Practice Nurse and the PCW would help the target population of Māori, Pacifica and low income people to address and overcome their perceived barriers to healthcare which included: finance, transport, anxiety, cultural issues, communication, or lack of knowledge. Seven years later although the PCW project has been deemed a success in the Canterbury District Health Board annual reports (2013-14) and community and government agencies, including the Christchurch Resettlement Service (2012), many of the Pegasus Health General Practices have not utilised the project to its full extent, hence the need for this research. I was interested in finding out in the first instance if the model had changed and, if so why, and in the second instance if the promotional material currently distributed by Pegasus Health Primary Health Organisation reflected the daily practice of the PCW. A combination of methods were used including: surveys to the Pegasus Health General Practices, interviews with PCWs, interviews with managers of both the PCW host organisations and referring agencies to the PCW project. All the questions asked of all the participants in this research were focussed on their own perception of the role of the PCW. Results showed that the model has changed and although the publications were not reflecting the original intention of the project they did reflect the daily practice of the PCWs who are now struggling to meet much wider community expectations and needs. Key Results: Partnership Community Worker (PCW) interviews: Seventeen PCWs of the 19 employed were interviewed face to face. A number expressed interest in more culturally specific training and some are pursuing qualifications in social work; for many pay parity is an issue. In addition, many felt overwhelmed by the expectations around clients with mental health issues and housing issues now, post-earthquakes. Medical Practice surveys: Surveys were sent to eighty-two Pegasus Health medical practices and of these twenty five were completed. Results showed the full capacity of the PCW role was not clearly understood by all with many believing it was mostly a transport service. Those who did understand the full complexity of the role were very satisfied with the outcomes. PCW Host Community Manager Interviews: Of the ten out of twelve managers interviewed, some wished for more communication with Pegasus Health management because they felt aspects of both the PCW role and their own role as managers had become blurred over time. Referring organisations: Fifteen of the fifty referring community or government organisations participated. The overall satisfaction of the service was high and some acknowledged the continuing need for PCWs to be placed in communities where they were well known and trusted. Moreover results also showed that both the Canterbury earthquakes 2010-2011 and the amalgamation of Partnership Health PHO and Pegasus Health Charitable Limited in 2013 have contributed to the change of the model. Further future research may also be needed to examine the long term effects on the people of Canterbury involved in community work during the 2011-2014 years.
The Project Team were: Simon Wallace (TIA),
David Simmons (Lincoln University),
Susanne Becken (Lincoln University)The State of the Tourism Sector report is published annually.The Tourism Industry Association of New Zealand’s (TIA) annual State of the Sector 2011 has been
prepared in partnership with Lincoln University. The objective of this is to understand better how
the tourism sector sees its future and what challenges and opportunities lie ahead in both the short
and longer term. State of Sector 2011, alongside the ongoing series of TIA Insights and other
consultations that TIA is undertaking in its research work programme, is aimed at informing
participants at the Tourism Summit taking place in Wellington on 13 July 2011. This information is a
key driver in assisting with the development of the 2011 Tourism Industry Election Manifesto. State
of the Sector 2011 also ultimately provides a current view of the tourism sector for those within the
industry and for external stakeholders who have an interest in tourism in New Zealand.
Rt Hon WINSTON PETERS to the Prime Minister: Does he stand by all his statements?
DAVID SHEARER to the Prime Minister: Does he stand by all his statements?
PAUL GOLDSMITH to the Minister of Finance: What reports has he received on business and economic conditions in New Zealand?
Dr RUSSEL NORMAN to the Prime Minister: Does he stand by his answer to written question 07314 (2013) when he said: "The inquiry team, itself, did not seek permission from Peter Dunne before it obtained his email logs" and does he think it should have?
SIMON O'CONNOR to the Minister of Transport: How will the Government progress the delivery of the next generation of transport projects for Auckland?
Hon DAVID PARKER to the Minister of Finance: Are the proceeds from selling power companies and other assets being used to pay down debt, to build schools and hospitals, to fund irrigation projects, to rebuild Christchurch, or to fund Auckland transport projects?
IAN McKELVIE to the Minister of Police: What updates has she received on how Police are using technology to prevent crime?
JACINDA ARDERN to the Minister of Finance: Does he agree with The Economist that "inequality is one of the biggest social, economic and political challenges of our time"; if so, what is his Government doing to address the fact that New Zealand now has the widest income gap since detailed records began?
PAUL FOSTER-BELL to the Minister of Justice: How is the Government improving its justice and other services to local communities?
Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: When was he first made aware of the September IANZ report which warned the Christchurch City Council that "Continued accreditation beyond May 2013 will depend on a satisfactory outcome of that assessment" and was he advised by CERA or a Ministerial colleague?
JONATHAN YOUNG to the Minister of Broadcasting: What progress has been made on the regional rollout of the digital switchover for New Zealand television viewers?
GARETH HUGHES to the Minister of Conservation: Will he implement the recommendations to protect Maui's dolphins contained in the report of this year's meeting of the International Whaling Commission Scientific Committee; if not, why not
Questions to Members
JACINDA ARDERN to the Chairperson of the Social Services Committee: On which date and time, if any, did he receive the Minister for Social Development's written responses to the pre-hearing questions for the 2013/14 Estimates review for Vote Social Development?
JACINDA ARDERN to the Chairperson of the Social Services Committee: On what date did the Minister for Social Development appear before the Committee to answer questions regarding the 2013/14 Estimates review for Vote Social Development?
Dr MEGAN WOODS to the Chairperson of the Education and Science Committee: Did he consider inviting the Minister to appear again to answer questions around responses to questions on the 2013/14 Estimates for Vote Education, if so, did he receive any advice about the Minister's willingness to appear again?
Hon DAVID CUNLIFFE to the Prime Minister: Does he have confidence that his Ministers are ethical and competent?
DAVID BENNETT to the Minister of Finance: What reports has he received on building momentum in the New Zealand economy and how this is supporting jobs?
METIRIA TUREI to the Prime Minister: Has he checked his files yet regarding whether Hon John Banks declared a potential conflict of interest in relation to the New Zealand International Convention Centre Bill while still a Minister; if so, was any conflict declared?
Hon ANNETTE KING to the Minister of Health: Is he satisfied with the performance of Health Benefits Ltd; if so, why?
NICKY WAGNER to the Minister for Canterbury Earthquake Recovery: What recent progress has been made on the anchor projects in the Christchurch Central recovery plan?
ANDREW WILLIAMS to the Minister of Conservation: Has he received any reports on the environmental impact of seismic surveying in the New Zealand Exclusive Economic Zone?
Hon MARYAN STREET to the Minister of State Services: Has he asked the State Services Commissioner for reports on recent failures of state sector agencies to carry out their functions according to the law; if not, why not?
IAN McKELVIE to the Minister for Primary Industries: What progress can he report on boosting innovation in the primary sector through the Primary Growth Partnership?
Hon DAMIEN O'CONNOR to the Minister for Primary Industries: What reports, if any, has he received on the state of the New Zealand kiwifruit industry?
PAUL FOSTER-BELL to the Minister of Police: What recent announcements has she made to support the victims of serious financial crime?
Hon RUTH DYSON to the Minister of Conservation: Why did he tell the House on 24 September "the first I knew of the issue of the submission was just 5 days before" when as he stated on 17 October "The first full briefing on Tukituki was on 5 March and it confirmed the department's role in the process and mentioned nitrogen and phosphorous management"?
Dr KENNEDY GRAHAM to the Minister for Climate Change Issues: Will he explain, given the latest projection of New Zealand's net greenhouse gas emissions is around 90 million tonnes in 2040, how the Government can conceivably reach its own emissions reduction target of 30 million tonnes by 2050?
Though there is a broad consensus that communities play a key role in disaster response and recovery, most of the existing work in this area focuses on the activities of donor agencies, formal civil defence authorities, and local/central government. Consequently, there is a paucity of research addressing the on-going actions and activities undertaken by communities and ‘emergent groups’ , particularly as they develop after the immediate civil defence or ‘response’ phase is over.
In an attempt to address this gap, this inventory of community-led recovery initiatives was undertaken approximately one year after the most devastating February 2011 earthquake. It is part of on-going project at Lincoln University documenting – and seeking a better understanding of -
various emergent communities’ roles in recovery, their challenges, and strategies for overcoming them. This larger project also seeks to better understand how collaborative work between informal and formal recovery efforts might be facilitated at different stages of the process.
This inventory was conducted over the December 2011 – February 2012 period and builds on Landcare Research’s Christchurch Earthquake Activity Inventory which was a similar snapshot taken in April 2011. The intention behind conducting this updated inventory is to gain a longitudinal perspective of how community-led recovery activities evolve over time.
Each entry is ordered alphabetically and contact details have been provided where possible. A series of keywords have also been assigned that describe the main attributes of each activity to assist searches within this document.This inventory was supported by the Lincoln University Research Fund and the Royal Society Marsden Fund.
This is an interim report from the research study performed within the NHRP Research Project “Impacts of soil liquefaction on land, buildings and buried pipe networks: geotechnical evaluation and design, Project 3: Seismic assessment and design of pipe networks in liquefiable soils”. The work presented herein is a continuation of the comprehensive study on the impacts of Christchurch earthquakes on the buried pipe networks presented in Cubrinovski et al. (2011). This report summarises the performance of Christchurch City’s potable water, waste water and road networks through the 2010-2011 Canterbury Earthquake Sequence (CES), and particularly focuses on the potable water network. It combines evidence based on comprehensive and well-documented data on the damage to the water network, detailed observations and interpretation of liquefaction-induced land damage, records and interpretations of ground motion characteristics induced by the Canterbury earthquakes, for a network analysis and pipeline performance evaluation using a GIS platform. The study addresses a range of issues relevant in the assessment of buried networks in areas affected by strong earthquakes and soil liquefaction. It discusses performance of different pipe materials (modern flexible pipelines and older brittle pipelines) including effects of pipe diameters, fittings and pipeline components/details, trench backfill characteristics, and severity of liquefaction. Detailed breakdown of key factors contributing to the damage to buried pipes is given with reference to the above and other relevant parameters. Particular attention is given to the interpretation, analysis and modelling of liquefaction effects on the damage and performance of the buried pipe networks. Clear link between liquefaction severity and damage rate for the pipeline has been observed with an increasing damage rate seen with increasing liquefaction severity. The approach taken here was to correlate the pipeline damage to LRI (Liquefaction Resistance Index, newly developed parameter in Cubrinovski et al., 2011) which represents a direct measure for the soil resistance to liquefaction while accounting for the seismic demand through PGA. Key quality of the adopted approach is that it provides a general methodology that in conjunction with conventional methods for liquefaction evaluation can be applied elsewhere in New Zealand and internationally. Preliminary correlations between pipeline damage (breaks km-1), liquefaction resistance (LRI) and seismic demand (PGA) have been developed for AC pipes, as an example. Such correlations can be directly used in the design and assessment of pipes in seismic areas both in liquefiable and non-liquefiable areas. Preliminary findings on the key factors for the damage to the potable water pipe network and established empirical correlations are presented including an overview of the damage to the waste water and road networks but with substantially less detail. A comprehensive summary of the damage data on the buried pipelines is given in a series of appendices.
Science education research shows that a traditional, stand-and-deliver lecture format is less effective than teaching strategies that are learner-centred and that promote active engagement. The Carl Wieman Science Education Initiative (CWSEI) has used this research to develop resources to improve learning in university science courses. We report on a successful adaptation and implementation of CWSEI in the New Zealand university context. This two-year project at Massey University and the University of Canterbury began by using perception and concept surveys before and after undergraduate science courses to measure students’ attitudes towards science as well as their knowledge. Using these data, and classroom observations of student engagement and corroborating focus groups, the research team worked with lecturers to create interventions to enhance student engagement and learning in those courses. Results show several positive changes related to these interventions and they suggest several recommendations for lecturers and course coordinators. The recommendations include:1. Make learning outcomes clear, both for the lecturer and the students; this helps to cull extraneous material and scaffold student learning. 2. Use interactive activities to improve engagement, develop deeper levels of thinking, and improve learning. 3. Intentionally foster “expert-like thinking” amongst students in the first few semesters of the degree programme. 4. Be flexible because one size does not fit all and contextual events are beyond anyone’s control.In addition to these recommendations, data collected at the Canterbury site during the 2010 and 2011 earthquakes reinforced the understanding that the most carefully designed teaching innovations are subject to contextual conditions beyond the control of academics.
In this paper we outline the process and outcomes of a multi-agency, multi-sector research collaboration, led by the Canterbury Earthquake Research Authority (CERA). The CERA Wellbeing Survey (CWS) is a serial, cross-sectional survey that is to be repeated six-monthly (in April and September) until the end of the CERA Act, in April 2016. The survey gathers self-reported wellbeing data to supplement the monitoring of the social recovery undertaken through CERA's Canterbury Wellbeing Index. Thereby informing a range of relevant agency decision-making, the CWS was also intended to provide the community and other sectors with a broad indication of how the population is tracking in the recovery. The primary objective was to ensure that decision-making was appropriately informed, with the concurrent aim of compiling a robust dataset that is of value to future researchers, and to the wider, global hazard and disaster research endeavor. The paper begins with an outline of both the Canterbury earthquake sequence, and the research context informing this collaborative project, before reporting on the methodology and significant results to date. It concludes with a discussion of both the survey results, and the collaborative process through which it was developed.
Since the 2010/11 Canterbury earthquakes, Akaroa has been hosting the majority of cruise ship
arrivals to Canterbury. This amounts to approximately 70-74 days per season, when between 2,000-
4,000 persons come ashore between 9am and 4pm when in port. This increased level of cruise ship
arrivals has had significant impacts, both beneficial and detrimental, on Akaroa. Attitudes within the
Akaroa community to hosting cruise ship arrivals appear to be divided, and has led to public debate
in Akaroa about the issue. In response to this situation, Christchurch and Canterbury Tourism (CCT)
commissioned this research project to assess the impact of cruise ship tourism on the Akaroa
community.This research was commissioned and funded by Christchurch and Canterbury Tourism (CCT).
Hon DAVID PARKER to the Minister of Finance: Does he accept the BNZ statement that New Zealand’s increasing current account is “a very clear risk for New Zealand’s credit rating with Standard and Poor’s”?
SHANE ARDERN to the Minister of Finance: What reports has he received on the economy?
KEVIN HAGUE to the Minister for ACC: Can she confirm that staff in ACC’s Recovery Independence Service teams receive more or less remuneration dependent on whether the proportion of people receiving weekly compensation is less or more than specified duration targets?
Hon DAVID CUNLIFFE to the Minister for Economic Development: Does he stand by all his recent statements?
JAMI-LEE ROSS to the Minister of Police: What actions has the Government taken against illegal street racers?
Hon MARYAN STREET to the Minister of Health: Has he received any reports or correspondence regarding the Community Pharmacy Services Agreement with District Health Boards and if he has, have they caused him any concern?
TIM MACINDOE to the Minister of Justice: How is the Justice sector contributing to the Government’s better public services programme?
GARETH HUGHES to the Minister for Climate Change Issues: Does he agree with the statement made by the Minister for the Environment, Hon Amy Adams in Rio, that, “Money spent on fossil fuels is money that could be spent on other sustainable development priorities”, and will the Government re-allocate the $889 million for ETS credits in Budget 2012 towards sustainable projects and a green economy?
MIKE SABIN to the Minister of Immigration: What reports has he received on the benefits to New Zealand of the Recognised Seasonal Employer scheme?
KRIS FAAFOI to the Minister of Police: Does she stand by all the statements she made to the Law and Order Committee yesterday?
NICKY WAGNER to the Minister for Courts: What recent announcements has he made regarding court services for Christchurch?
DENIS O'ROURKE to the Minister for Canterbury Earthquake Recovery: Does he still believe that the best way to deal with the price increase in home rentals in Christchurch is to leave it to the market?
Beam-column joints are addressed in the context of current design procedures and performance criteria for reinforced concrete ductile frames subjected to large earthquake motions. Attention is drawn to the significant differences between the pertinent requirements of concrete design codes of New Zealand and the United States for such joints. The difference between codes stimulated researchers and structural engineers of the United States, New Zealand, Japan and China to undertake an international collaborative research project. The major investigators of the project selected issues and set guidelines for co-ordinated testing of joint specimens designed according to the codes of the countries. The tests conducted at the University of Canterbury, New Zealand, are reported. Three full-scale beam-column-slab joint assemblies were designed according to existing code requirements of NZS 3101:1982, representing an interior joint of a one-way frame, an interior joint of a two-way frame, and an exterior joint of a two-way frame. Quasistatic cyclic loading simulating severe earthquake actions was applied. The overall performance of each test assembly was found to be satisfactory in terms of stiffness, strength and ductility. The joint and column remained essentially undamaged while plastic hinges formed in the beams. The weak beam-strong column behaviour sought in the design, desirable in tall ductile frames designed for earthquake resistance, was therefore achieved. Using the laws of statics and test observations, the action and flow of forces from the slabs, beams and column to the joint cores are explored. The effects of bond performance and the seismic shear resistance of the joints, based on some postulated mechanisms, are examined. Implications of the test results on code specifications are discussed and design recomendations are made.
The Canterbury earthquakes of 2010 and 2011 caused significant damage and disruption to the city of Christchurch, New Zealand. A Royal Commission was established to report on the causes of building failure as a result of the earthquakes as well as look at the legal and best-practice requirements for buildings in New Zealand Central Business Districts. The Royal Commission made 189 recommendations on a variety of matters including managing damaged buildings after an earthquake, the adequacy of building codes and standards, and the processes of seismic assessments of existing buildings to determine their earthquake vulnerability. In response the Ministry of Business, Innovation and Employment, the agency responsible for administering building regulation in New Zealand, established a work programme to assist with the Canterbury rebuild and to implement the lessons learned throughout New Zealand. The five primary work streams in the programme are: • Facilitating the Canterbury Rebuild • Structural Performance and Design Standards • Geotechnical and structural guidance • Existing Building Resilience • Post Disaster Building Management This paper provides more detail on each of the work streams. There has been significant collaboration between the New Zealand Government and the research community, technical societies, and engineering consultants, both within New Zealand and internationally, to deliver the programme and improve the resilience of the New Zealand built environment. This has presented major challenges for an extremely busy industry in the aftermath of the Canterbury earthquakes. The paper identifies the items of work that have been completed and the work that is still in progress at the time of writing.