Search

found 46 results

Images, UC QuakeStudies

A photograph of part of the display structure for the Info Gap temporary outdoor display space. The structure is sitting behind the Gap Filler headquarters in Sydenham.

Articles, Christchurch uncovered

Here in New Zealand, we like to think ourselves as a nation of outdoor enthusiasts, always off tramping, kayaking, mountain biking, etc. But it wasn’t always thus. Our love affair with the outdoors began in the mid-late 19th century and was … Continue reading →

Images, UC QuakeStudies

A photograph of the entrance to Gap Filler's temporary outdoor cinema on the corner of Madras and St Asaph Streets. The entranceway is made of lights on a steel frame, and leads to a painted "red carpet".

Audio, Radio New Zealand

When the 2010 and 2011 earthquakes created a city-wide outdoor research laboratory, UC Civil Engineering Professor Misko Cubrinovski gathered as much information as possible. This work has been recognised by the American Society of Civil Engineers (ASCE), which is presenting him with the 2019 Ralph B. Peck Award for "outstanding contributions to the geotechnical engineering profession through the publication of several insightful field case histories"

Audio, Radio New Zealand

Topics - If you like a quiet time, head for the Spanish city of Seville. Seville's silent summer, they're calling this. They've banned outdoor noise. Seville's been noisy; flamenco singers, old men playing dominoes, bar patrons chatting. The city councillors have now banned most of this, and they seem to have support. Gerry Brownlee the Earthquake Recovery Minister will have the final say over what happens to a piece of land near Christchurch airport, on the corner of Memorial Ave and Russley Road. It's currently zoned as rural, but industrial development could be on the cards. The NYT wonders why with so much violence in movies and games, the big Comic-con pop entertainment convention in San Diego is so peaceful. John Banks snapped phone-driving, we saw at the weekend. John Banks accused of breaking the law again, this time for using a cellphone while driving.

Audio, Radio New Zealand

Since Standing Room Only started some of the biggest changes we've seen in attitudes towards art and artists has happened in Otautahi Christchurch. How much artists contributed to the city's emotional recovery from the earthquakes through projects like Gap Filler, but also how many individual people created and shared their work. Before the quakes, Neil Dawson's monumental sculpture The Challice in the Square was initially criticised, but within days of its unveiling it became an impromptu shrine for the New York victims of 9/11. Back in 1998, the SCAPE Public Art started commissioning large outdoor works by international and Kiwi sculptors and artists. Some stayed but most of them were temporary. Some attracted criticism but they certainly got people talking. As SCAPE reaches its quarter century, its founder and Executive Director Deborah McCormick is standing down in March next year. Deborah's last SCAPE will see her tick off one of her long held ambitions - to secure a permanent sculpture for Christchurch by Auckland-based artist Dr Brett Graham. Lynn Freeman talks with Deborah and Brett, first asking Deborah to take us back to the lightbulb moment that led to SCAPE public art event.

Research papers, University of Canterbury Library

In this thesis, focus is given to develop methodologies for rapidly estimating specific components of loss and downtime functions. The thesis proposes methodologies for deriving loss functions by (i) considering individual component performance; (ii) grouping them as per their performance characteristics; and (iii) applying them to similar building usage categories. The degree of variation in building stock and understanding their characteristics are important factors to be considered in the loss estimation methodology and the field surveys carried out to collect data add value to the study. To facilitate developing ‘downtime’ functions, this study investigates two key components of downtime: (i) time delay from post-event damage assessment of properties; and (ii) time delay in settling the insurance claims lodged. In these two areas, this research enables understanding of critical factors that influence certain aspects of downtime and suggests approaches to quantify those factors. By scrutinising the residential damage insurance claims data provided by the Earthquake Commission (EQC) for the 2010- 2011 Canterbury Earthquake Sequence (CES), this work provides insights into various processes of claims settlement, the time taken to complete them and the EQC loss contributions to building stock in Christchurch city and Canterbury region. The study has shown diligence in investigating the EQC insurance claim data obtained from the CES to get new insights and build confidence in the models developed and the results generated. The first stage of this research develops contribution functions (probabilistic relationships between the expected losses for a wide range of building components and the building’s maximum response) for common types of claddings used in New Zealand buildings combining the probabilistic density functions (developed using the quantity of claddings measured from Christchurch buildings), fragility functions (obtained from the published literature) and cost functions (developed based on inputs from builders) through Monte Carlo simulations. From the developed contribution functions, glazing, masonry veneer, monolithic and precast concrete cladding systems are found to incur 50% loss at inter-storey drift levels equal to 0.027, 0.003, 0.005 and 0.011, respectively. Further, the maximum expected cladding loss for glazing, masonry veneer, monolithic, precast concrete cladding systems are found to be 368.2, 331.9, 365.0, and 136.2 NZD per square meter of floor area, respectively. In the second stage of this research, a detailed cost breakdown of typical buildings designed and built for different purposes is conducted. The contributions of structural and non- structural components to the total building cost are compared for buildings of different usages, and based on the similar ratios of non-structural performance group costs to the structural performance group cost, four-building groups are identified; (i) Structural components dominant group: outdoor sports, stadiums, parkings and long-span warehouses, (ii) non- structural drift-sensitive components dominant group: houses, single-storey suburban buildings (all usages), theatres/halls, workshops and clubhouses, (iii) non-structural acceleration- sensitive components dominant group: hospitals, research labs, museums and retail/cold stores, and (iv) apartments, hotels, offices, industrials, indoor sports, classrooms, devotionals and aquariums. By statistically analysing the cost breakdowns, performance group weighting factors are proposed for structural, and acceleration-sensitive and drift-sensitive non-structural components for all four building groups. Thus proposed building usage groupings and corresponding weighting factors facilitate rapid seismic loss estimation of any type of building given the EDPs at storey levels are known. A model for the quantification of post-earthquake inspection duration is developed in the third stage of this research. Herein, phase durations for the three assessment phases (one rapid impact and two rapid building) are computed using the number of buildings needing inspections, the number of engineers involved in inspections and a phase duration coefficient (which considers the median building inspection time, efficiency of engineer and the number of engineers involved in each assessment teams). The proposed model can be used: (i) by national/regional authorities to decide the length of the emergency period following a major earthquake, and estimate the number of engineers required to conduct a post-earthquake inspection within the desired emergency period, and (ii) to quantify the delay due to inspection for the downtime modelling framework. The final stage of this research investigates the repair costs and insurance claim settlement time for damaged residential buildings in the 2010-2011 Canterbury earthquake sequence. Based on the EQC claim settlement process, claims are categorized into three groups; (i) Small Claims: claims less than NZD15,000 which were settled through cash payment, (ii) Medium Claims: claims less than NZD100,000 which were managed through Canterbury Home Repair Programme (CHRP), and (iii) Large Claims: claims above NZD100,000 which were managed by an insurance provider. The regional loss ratio (RLR) for greater Christchurch for three events inducing shakings of approximate seismic intensities 6, 7, and 8 are found to be 0.013, 0.066, and 0.171, respectively. Furthermore, the claim duration (time between an event and the claim lodgement date), assessment duration (time between the claim lodgement day and the most recent assessment day), and repair duration (time between the most recent assessment day and the repair completion day) for the insured residential buildings in the region affected by the Canterbury earthquake sequence is found to be in the range of 0.5-4 weeks, 1.5- 5 months, and 1-3 years, respectively. The results of this phase will provide useful information to earthquake engineering researchers working on seismic risk/loss and insurance modelling.