A presentation which explains that NZTA have adopted SCIRT's approach to utilities management and sets out the reasons why. This presentation was created in 2015.
A memorandum of understanding that sets out how SCIRT and InfraTrain planned to work together to build an industry training framework and skilled workforce.
A photograph of a slow motion rod from the Townsend Telescope. The rod was bent out of shape during the 22 February 2011 earthquake.
A report which details the archaeological investigations carried out during the course of SCIRT project 11185, water main renewal work on Manchester Street.
A document which outlines how to safely carry out lifting operations, created to discuss with site staff at on-site "toolbox talks".
A revised memorandum of understanding that sets out how SCIRT and Connexis planned to work together to build an industry training framework and skilled workforce.
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Lyttelton area.
Damage to the interior of a house in Richmond. The photographer comments, "Revisiting our abandoned house. Sagging walls have pulled the stereo shelves out of line".
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A design guideline which provides guidance to designers on how to carry out a whole of life evaluation of rebuild options.
A document which contains several examples of SCIRT Safety Alerts, which were documents sent out to inform and educate all site staff after an incident.
A tool which outlines the eight critical risks applicable to the SCIRT programme, and sets out minimum standards for addressing these risks. This tool was created in 2014.
University of Canterbury ICT staff members prepare to be escorted to buildings by Civil Defence members in order to retrieve computers from offices. The photographer comments, "ICT staff head out to retrieve computers from buildings".
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Christchurch City area.
A photograph of the top cover of the clock from the Townsend Telescope. Parts of the cover were bent out of shape during the 22 February 2011 earthquake.
A report which details the archaeological investigations carried out during the course of SCIRT projects 11115 and 11159, wastewater renewal work and storm water repair work on Ferry Road.
A pile of gravel and tarseal in front of a house in Richmond. The photographer comments, "River Rd repairs. We weren't living in our house, we'd moved out after the September 2010 shake".
A photograph of the declination vernier from the Townsend Telescope. The left side of the vernier was bent out of shape during the 22 February 2011 earthquake.
A photograph of the declination vernier from the Townsend Telescope. The left side of the vernier was bent out of shape during the 22 February 2011 earthquake.
Damage to a house in Richmond. Part of the brick wall is visibly out of alignment, leaving large gaps at the corner of the house. The photographer comments, "Dining room exterior wall".
A photograph of CPIT students constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of CPIT students constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of CPIT students constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of the earthquake-damaged output shaft from the top-plate of the Townsend Telescope's clock drive. The output shaft was bent out of shape during the 22 February 2011 earthquake.
A photograph of the hour angle setting circle from the Townsend Telescope. The left side of the support arm was bent out of shape during the 22 February 2011 earthquake.
A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A brochure created for Beca Heritage Week 2014, outlining SCIRT's repair work on heritage structures in the Central City. It was handed out to members of the public at SCIRT's walk and talk tours.
University of Canterbury students outside one of the tents used while lecture theatres were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Students leave a lecture tent".
A presentation prepared by SCIRT's Downer Communciation Lead, providing an overview of the community engagement carried out by the Downer Team during the restoration of the Bridge and Arch.