Project Prioritisation Management Plan
Articles, UC QuakeStudies
A document which describes SCIRT's framework, principles and process of defining projects and the process of prioritising those projects.
A document which describes SCIRT's framework, principles and process of defining projects and the process of prioritising those projects.
A document, created in May 2014, containing additional information to supplement SCIRT traffic management plans.
A plan which describes how the transition from the IRMO programme to the SCIRT programme will take place after the signing of the Alliance Agreement.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
A SCIRT pro forma created in May 2014 to reduce the amount of generic information required in a traffic management plan (TMP).
A guideline, created in May 2014, to show TMP (traffic management plan) planners how to use the SCIRT proforma.
A plan which details how in 2013 SCIRT planned to engage its workforce in training.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A plan which provides SCIRT with a map for building and sustaining outstanding performance. The first version of this plan was produced on 18 February 2013.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A document which outlines the purpose and processes associated with ECI at SCIRT.
A plan which outlines the processes and IT applications and services required to manage the SCIRT programme. The first version of this plan was produced on 9 August 2011.
A plan which sets out how SCIRT will carry out internal communication over the life of its programme of work. The first version of this plan was produced on 24 January 2011.
A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.
A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012. Note that personal details of key personnel have been removed from this document.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
A promotional brochure explaining the Forward Works Viewer and that the tool was a key to cost-effective and efficient project delivery in Christchurch.
Orientation: Large-scale events such as disasters, wars and pandemics disrupt the economy by diverging resource allocation, which could alter employment growth within the economy during recovery. Research purpose: The literature on the disaster–economic nexus predominantly considers the aggregate performance of the economy, including the stimulus injection. This research assesses the employment transition following a disaster by removing this stimulus injection and evaluating the economy’s performance during recovery. Motivation for the study: The underlying economy’s performance without the stimulus’ benefit remains primarily unanswered. A single disaster event is used to assess the employment transition to guide future stimulus response for disasters. Research approach/design and method: Canterbury, New Zealand, was affected by a series of earthquakes in 2010–2011 and is used as a single case study. Applying the historical construction–economic relationship, a counterfactual level of economic activity is quantified and compared with official results. Using an input–output model to remove the economy-wide impact from the elevated activity reveals the performance of the underlying economy and employment transition during recovery. Main findings: The results indicate a return to a demand-driven level of building activity 10 years after the disaster. Employment transition is characterised by two distinct periods. The first 5 years are stimulus-driven, while the 5 years that follow are demand-driven from the underlying economy. After the initial period of elevated building activity, construction repositioned to its long-term level near 5% of value add. Practical/managerial implications: The level of building activity could be used to confidently assess the performance of regional economies following a destructive disaster. The study results argue for an incentive to redevelop the affected area as quickly as possible to mitigate the negative effect of the destruction and provide a stimulus for the economy. Contribution/value-add: This study contributes to a growing stream of regional disaster economics research that assesses the economic effect using a single case study.
A video of a presentation by Associate Professor John Vargo during the fifth plenary of the 2016 People in Disasters Conference. Vargo is a senior researcher and co-leader of the Resilient Organisations Research Programme at the University of Canterbury. The presentation is titled, "Organisational Resilience is more than just Business Continuity".The abstract for this presentation reads as follows: Business Continuity Management is well-established process in many larger organisations and a key element in their emergency planning. Research carried out by resilient organisations follow the 2010 and 2011 Canterbury Earthquakes show that most small organisations did not have a business continuity plan (BCP), yet many of these organisations did survive the massive disruptions following the earthquakes. They were resilient to these catastrophic events, but in the absence of a BCP. This research also found that many of the organisations with BCP's, struggled to use them effectively when facing real events that did not align with the BCP. Although the BCPs did a good job of preparing organisations to deal with technology and operational disruptions, there was virtually no coverage for the continuity of people. Issues surrounding staff welfare and engagement were amongst the most crucial issues faced by Canterbury organisations, yet impacts of societal and personal disruption did not feature in BCPs. Resilience is a systematic way of looking at how an organization can survive a crisis and thrive in an uncertain world. Business continuity is an important aspect for surviving the crisis, but it is only part of the bigger picture addressed by organisational resilience. This presentation will show how organizational experiences in the Canterbury earthquakes support the need to move to a 'Business Continuity' for the '21st Century', one that incorporates more aspects of resilience, especially the 'people' areas of leadership, culture, staff welfare, and engagement.
Tsunami events including the 2004 Indian Ocean Tsunami and the 2011 Tohoku Earthquake and Tsunami confirmed the need for Pacific-wide comprehensive risk mitigation and effective tsunami evacuation planning. New Zealand is highly exposed to tsunamis and continues to invest in tsunami risk awareness, readiness and response across the emergency management and science sectors. Evacuation is a vital risk reduction strategy for preventing tsunami casualties. Understanding how people respond to warnings and natural cues is an important element to improving evacuation modelling techniques. The relative rarity of tsunami events locally in Canterbury and also globally, means there is limited knowledge on tsunami evacuation behaviour, and tsunami evacuation planning has been largely informed by hurricane evacuations. This research aims to address this gap by analysing evacuation behaviour and movements of Kaikōura and Southshore/New Brighton (coastal suburb of Christchurch) residents following the 2016 Kaikōura earthquake. Stage 1 of the research is engaging with both these communities and relevant hazard management agencies, using a survey and community workshops to understand real-event evacuation behaviour during the 2016 Kaikōura earthquake and subsequent tsunami evacuations. The second stage is using the findings from stage 1 to inform an agent-based tsunami evacuation model, which is an approach that simulates of the movement of people during an evacuation response. This method improves on other evacuation modelling approaches to estimate evacuation times due to better representation of local population characteristics. The information provided by the communities will inform rules and interactions such as traffic congestion, evacuation delay times and routes taken to develop realistic tsunami evacuation models. This will allow emergency managers to more effectively prepare communities for future tsunami events, and will highlight recommended actions to increase the safety and efficiency of future tsunami evacuations.
During the 21st century, New Zealand has experienced increasing public concern over the quality of the design and appearance of new developments, and their effects on the urban environment. In response to this, a number of local authorities developed a range of tools to address this issue, including urban design panels to review proposals and provide independent advice. Following the 2010 and 2011 Canterbury earthquake sequence, the commitment to achieve high quality urban design within Christchurch was given further importance, with the city facing the unprecedented challenge of rebuilding a ‘vibrant and successful city’. The rebuild and regeneration reinforced the need for independent design review, putting more focus and emphasis on the role and use of the urban design panel; first through collaboratively assisting applicants in achieving a better design outcome for their development by providing an independent set of eyes on their design; and secondly in assisting Council officers in forming their recommendations on resource consent decisions. However, there is a perception that urban design and the role of the urban design panel is not fully understood, with some stakeholders arguing that Council’s urban design requirements are adding cost and complexity to their developments. The purpose of this research was to develop a better understanding on the role of the Christchurch urban design panel post-earthquake in the central city; its direct and indirect influence on the built environment; and the deficiencies in the broader planning framework and institutional settings that it might be addressing. Ultimately, the perceived role of the Panel is understood, and there is agreement that urban design is having a positive influence on the built environment, albeit viewed differently amongst the varying groups involved. What has become clear throughout this research is that the perceived tension between the development community and urban design well and truly exists, with the urban design panel contributing towards this. This tension is exacerbated further through the cost of urban design to developers, and the drive for financial return from their investments. The panel, albeit promoting a positive experience, is simply a ‘tick box’ exercise for some, and as the research suggests, groups or professional are determining themselves what constitutes good urban design, based on their attitude, the context in which they sit and the financial constraints to incorporate good design elements. It is perhaps a bleak time for urban design, and more about building homes.
The greater Wellington region, New Zealand, is highly vulnerable to large earthquakes. While attention has been paid to the consequences of earthquake damage to road, electricity and water supply networks, the consequences of wastewater network damage for public health, environmental health and habitability of homes remain largely unknown for Wellington City. The Canterbury and Kaikōura earthquakes have highlighted the vulnerability of sewerage systems to disruption during a disaster. Management of human waste is one of the critical components of disaster planning to reduce faecal-oral transmission of disease and exposure to disease-bearing vectors. In Canterbury and Kaikōura, emergency sanitation involved a combination of Port-a-loos, chemical toilets and backyard long-drops. While many lessons may be learned from experiences in Canterbury earthquakes, it is important to note that isolation is likely to be a much greater factor for Wellington households, compared to Christchurch, due to the potential for widespread landslides in hill suburbs affecting road access. This in turn implies that human waste may have to be managed onsite, as options such as chemical toilets and Port-a-loos rely completely on road access for delivering chemicals and collecting waste. While some progress has been made on options such as emergency composting toilets, significant knowledge gaps remain on how to safely manage waste onsite. In order to bridge these gaps, laboratory tests will be conducted through the second half of 2019 to assess the pathogen die-off rates in the composting toilet system with variables being the type of carbon bulking material and the addition of a Bokashi composting activator.
Natural hazards continue to have adverse effects on communities and households worldwide, accelerating research on proactively identifying and enhancing characteristics associated with resilience. Although resilience is often characterized as a return to normal, recent studies of postdisaster recovery have highlighted the ways in which new opportunities can emerge following disruption, challenging the status quo. Conversely, recovery and reconstruction may serve to reinforce preexisting social, institutional, and development pathways. Our understanding of these dynamics is limited however by the small number of practice examples, particularly for rural communities in developed nations. This study uses a social–ecological inventory to document the drivers, pathways, and mechanisms of resilience following a large-magnitude earthquake in Kaikōura, a coastal community in Aotearoa New Zealand. As part of the planning and implementation phase of a multiyear project, we used the tool as the basis for indepth and contextually sensitive analysis of rural resilience. Moreover, the deliberate application of social–ecological inventory was the first step in the research team reengaging with the community following the event. The inventory process provided an opportunity for research partners to share their stories and experiences and develop a shared understanding of changes that had taken place in the community. Results provide empirical insight into reactions to disruptive change associated with disasters. The inventory also informed the design of targeted research collaborations, established a platform for longer-term community engagement, and provides a baseline for assessing longitudinal changes in key resilience-related characteristics and community capacities. Findings suggest the utility of social–ecological inventory goes beyond natural resource management, and that it may be appropriate in a range of contexts where institutional, social, and economic restructuring have developed out of necessity in response to felt or anticipated external stressors.
A video of the keynote presentation by Alexander C. McFarlane during the third plenary of the 2016 People in Disasters Conference. McFarlane is a Professor of Psychiatry at the University of Adelaide and the Heady of the Centre for Traumatic Stress Studies. The presentation is titled, "Holding onto the Lessons Disasters Teach".The abstract for this presentation reads as follows: Disasters are sentinel points in the life of the communities affected. They bring an unusual focus to community mental health. In so doing, they provide unique opportunities for better understanding and caring for communities. However, one of the difficulties in the disaster field is that many of the lessons from previous disasters are frequently lost. If anything, Norris (in 2006) identified that the quality of disaster research had declined over the previous 25 years. What is critical is that a longitudinal perspective is taken of representative cohorts. Equally, the impact of a disaster should always be judged against the background mental health of the communities affected, including emergency service personnel. Understandably, many of those who are particularly distressed in the aftermath of a disaster are people who have previously experienced a psychiatric disorder. It is important that disaster services are framed against knowledge of this background morbidity and have a broad range of expertise to deal with the emerging symptoms. Equally, it is critical that a long-term perspective is considered rather than short-term support that attempts to ameliorate distress. Future improvement of disaster management depends upon sustaining a body of expertise dealing with the consequences of other forms of traumatic stress such as accidents. This expertise can be redirected to co-ordinate and manage the impact of larger scale events when disasters strike communities. This presentation will highlight the relevance of these issues to the disaster planning in a country such as New Zealand that is prone to earthquakes.