Project Prioritisation Management Plan
Articles, UC QuakeStudies
A document which describes SCIRT's framework, principles and process of defining projects and the process of prioritising those projects.
A document which describes SCIRT's framework, principles and process of defining projects and the process of prioritising those projects.
A document, created in May 2014, containing additional information to supplement SCIRT traffic management plans.
A plan which describes how the transition from the IRMO programme to the SCIRT programme will take place after the signing of the Alliance Agreement.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
A SCIRT pro forma created in May 2014 to reduce the amount of generic information required in a traffic management plan (TMP).
A guideline, created in May 2014, to show TMP (traffic management plan) planners how to use the SCIRT proforma.
A plan which details how in 2013 SCIRT planned to engage its workforce in training.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A plan which provides SCIRT with a map for building and sustaining outstanding performance. The first version of this plan was produced on 18 February 2013.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A document which outlines the purpose and processes associated with ECI at SCIRT.
A plan which outlines the processes and IT applications and services required to manage the SCIRT programme. The first version of this plan was produced on 9 August 2011.
A plan which sets out how SCIRT will carry out internal communication over the life of its programme of work. The first version of this plan was produced on 24 January 2011.
A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.
A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012. Note that personal details of key personnel have been removed from this document.
Recovery from disasters is a significant issue faced by all countries in the world at various times. Governments, including central and local governments, are the key actors regarding post-disaster recovery because they have the authority and responsibility to rescue affected people and recover affected areas (Yang, 2010). Planning is a critical step in the recovery process and provides the basis for defining a shared vision for recovery, clear objectives and intended results. Subsequently, the concept of collaborative planning and ‘build back better’ are highly desirable in recovery planning. However, in practice, these concepts are difficult to achieve. A brief description of the recovery planning in Christchurch City following the Canterbury earthquakes 2011 is provided as an example and comparison. This research aims to analyse the planning process to develop a post-disaster recovery plan in Indonesia using Mataram City’s recovery plan following the Lombok Earthquakes 2018 as the case study. It will emphasise on the roles of the central and local governments and whether they collaborate or not, and the implications of decentralisation for recovery planning. The methodology comprised a combination of legislation analysis and semi-structure interviews with the representatives of the central and local governments who were involved in the planning process. The results indicate that there was no collaboration between the central and local governments when developing the recovery plan, with the former tend to dominate and control the planning process. It is because there are regulatory and institutional problems concerning disaster management in Indonesia. In order to improve the implementation of disaster management and develop a better recovery plan, some recommendations are proposed. These include amendments the disaster management law and regulations to provide a clear guideline regarding the roles and responsibilities of both the central and local governments. It is also imperative to improve the capacity and capability of the local governments in managing disaster.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
Disasters can create the equivalent of 20 years of waste in only a few days. Disaster waste can have direct impacts on public health and safety, and on the environment. The management of such waste has a great direct cost to society in terms of labor, equipment, processing, transport and disposal. Disaster waste management also has indirect costs, in the sense that slow management can slow down a recovery, greatly affecting the ability of commerce and industry to re-start. In addition, a disaster can lead to the disruption of normal solid waste management systems, or result in inappropriate management that leads to expensive environmental remediation. Finally, there are social impacts implicit in disaster waste management decisions because of psychological impact we expect when waste is not cleared quickly or is cleared too quickly. The paper gives an overview of the challenge of disaster waste management, examining issues of waste quantity and composition; waste treatment; environmental, economic, and social impacts; health and safety matters; and planning. Christchurch, New Zealand, and the broader region of Canterbury were impacted during this research by a series of shallow earthquakes. This has led to the largest natural disaster emergency in New Zealand’s history, and the management of approximately 8 million tons of building and infrastructure debris has become a major issue. The paper provides an overview of the status of disaster waste management in Christchurch as a case study. A key conclusion is the vital role of planning in effective disaster waste management. In spite of the frequency of disasters, in most countries the ratio of time spent on planning for disaster waste management to the time spent on normal waste management is extremely low. Disaster waste management also requires improved education or training of those involved in response efforts. All solid waste professionals have a role to play to respond to the challenges of disaster waste management.
Website of Canterbury CDEM Group, which is a partnership of local authorities, emergency services and other organisations tasked with providing effective and comprehensive management of major hazards and their consequences anywhere in Canterbury. Includes community preparedness information, information for emergency managers and CDEM Group plan.
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.
This report is the output of a longitudinal study that was established between the University of Auckland and Resilient Organisations, in conjunction with the Building Research Association of New Zealand (BRANZ), to evaluate the ongoing resource availability and capacity for post-earthquake reconstruction in Christchurch.
A document outlining the Emergency Management Policy at the University of Canterbury in the time between the 4 September 2010 and 22 February 2011 earthquake. This policy was developed to provide a mandate for decisions that need to be taken to most appropriately and expeditiously respond to a planned event or unforeseen critical incident at the University of Canterbury.
Earthquakes impacting on the built environment can generate significant volumes of waste, often overwhelming existing waste management capacities. Earthquake waste can pose a public and environmental health hazard and can become a road block on the road to recovery. Specific research has been developed at the University of Canterbury to go beyond the current perception of disaster waste as a logistical hurdle, to a realisation that disaster waste management is part of the overall recovery process and can be planned for effectively. Disaster waste decision-makers, often constrained by inappropriate institutional frameworks, are faced with conflicting social, economic and environmental drivers which all impact on the overall recovery. Framed around L’Aquila earthquake, Italy, 2009, this paper discusses the social, economic and environmental effects of earthquake waste management and the impact of existing institutional frameworks (legal, financial and organisational). The paper concludes by discussing how to plan for earthquake waste management.
Insurance is widely acknowledged as a key component in an organisation's disaster preparedness and resilience. But how effective is insurance in aiding business recovery following a major disaster? The aim of this research was to summarise the experiences of both the insurance industry and businesses dealing with commercial insurance claims following the 2010 and 2011 Canterbury earthquakes.
Information about CDEM planning, programmes and the Ministry itself. Includes emergency preparedness information for the public and downloadable resources for civil defence sector workers. Earthquake related information can be found in the archived instances from September 2010-
Planning in New Zealand in 2014 has largely been dominated by housing and urban development, potential local government and legislative reforms, and water issues. This volume’s peer reviewed research, which combines Issues 1 and 2, focuses on these issues, but with perspectives and issues that are outside the mainstream. In our lead research article, John Ryks and his co-authors review the opportunities from Treaty settlements and legislative provisions and challenges for Māori participation in urban development, such as the balancing of matawaka and mana whenua perspectives. Water issues are picked up by Ronlyn Duncan and Phil Holland who each take constructively critical views toward some currently well-regarded approaches to resolutions. We have reflective and somewhat contrasting contributions from two highly respected semi-retired planners, Malcolm Douglass (FNZPI) and Derek Hall, that challenge aspects of New Zealand’s current approach to planning. In our outreach part of this Volume we include the response of some political parties to questions put to them about planning by LPR team member Nicole Read. Finally, Lincoln University appears to have turned a corner after the earthquakes, at least in the planning programmes.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
The New Zealand Kellogg Rural Leaders Programme develops emerging agribusiness leaders to help shape the future of New Zealand agribusiness and rural affairs. Lincoln University has been involved with this leaders programme since 1979 when it was launched with a grant from the Kellogg Foundation, USA.At 4.35am on 4th September 2010, Canterbury was hit by an earthquake measuring 7.1 on the Richter scale. On 22nd February 2011 and 13th June 2011 a separate fault line approximately 35km from the first, ruptured to inflict two further earthquakes measuring 6.3 and 6.0 respectively. As a direct result of the February earthquake, 181 people lost their lives. Some commentators have described this series of earthquakes as the most expensive global insurance event of all time. These earthquakes and the more than 7000 associated aftershocks have had a significant physical impact on parts of Canterbury and virtually none on others. The economic, social and emotional impacts of these quakes spread across Canterbury and beyond. Waimakariri district, north of Christchurch, has reflected a similar pattern, with over 1400 houses requiring rebuild or substantial repair, millions of dollars of damage to infrastructure, and significant social issues as a result. The physical damage in Waimakiriri District was predominately in parts of Kaiapoi, and two small beach settlements, The Pines and Kairaki Beach with pockets elsewhere in the district. While the balance of the district is largely physically untouched, the economic, social, and emotional shockwaves have spread across the district. Waimakariri district consists of two main towns, Rangiora and Kaiapoi, a number of smaller urban areas and a larger rural area. It is considered mid-size in the New Zealand local government landscape. This paper will explore the actions and plans of Waimakiriri District Council (WDC) in the Emergency Management Recovery programme to provide context to allow a more detailed examination of the planning processes prior to, and subsequent to the earthquakes. This study looked at documentation produced by WDC, applicable legislation and New Zealand Emergency Management resources and other sources. Key managers and elected representatives in the WOC were interviewed, along with a selection of governmental and nongovernmental agency representatives. The interview responses enable understanding of how central Government and other local authorities can benefit from these lessons and apply them to their own planning. It is intended that this paper will assist local government organisations in New Zealand to evaluate their planning processes in light of the events of 2010/11 in Canterbury and the lessons from WDC.
Contemporary organisations operate in rapidly evolving complex and ambiguous environments for which traditional change management approaches are insufficient. Under these conditions, organisations need to demonstrate learning and adaptive capabilities to effectively manage crises. Yet, the swift development and enactment of these capabilities can be particularly challenging for large, operationally diverse, and financially constrained public-sector organisations such as universities. Despite growing need for evidence-based research to guide crisis and change management in the higher education sector, the organisational literature offers limited insights. The combined impact of the 2010 and 2011 Canterbury earthquakes with a well-advanced restructure provided an opportunity to investigate institutional adaptation to and management of a compounded planned change (i.e., restructure) and an unplanned change (i.e., natural disaster response) at a university. Beginning in 2016, individual semi-structured interviews were conducted with 20 middle and senior university managers to capture their perspectives of compounded planned and unplanned change management, covering views of leadership, and of operational, structural, relational, and extra-organisational factors. Data were analysed using reflexive thematic analysis. The analysis coalesced into two overarching themes: Change Management Approaches and Lessons Learned through Change. Change Management Approaches evince institutional adaptation factors, along with barriers and enablers to effective change management, arising from the interplay of, and tensions between, leadership capabilities and a longstanding participatory culture. Lessons Learned through Change encompass business continuity mechanisms, and the learning opportunities seized and missed by leaders. The findings assert the primacy of workforce capabilities to 21st-century organisational success and thriving and substantiate that the calibre and availability of workforce capability is contingent on organisational culture and leadership. Leaders must ensure organisational agility by empowering employees, leveraging and integrating their contributions within and across functional units, and promoting effective two-way communication. The research argues for a hybrid repertoire of versatile dynamic organisational leadership qualities and capabilities to effectively navigate the multidimensional challenges and uncertainties in this sector and 21st-century business conditions. Of overarching significance to this repertoire is purpose-oriented emotionally intelligent leadership that honours the individual and collective dignity, diversity, and intelligence of all employees. This research empirically evidences the co-occurrence of planned and unplanned change in contemporary society, and continuous organisational adaptation and resilience to navigate the persistent volatility during a protracted crisis. Accordingly, the thesis argues that continued bifurcation of planned and unplanned change fields, and strategic and change management leadership theories is untenable, and that an integrated framework of organisational leadership and change management methodologies is required for organisations to effectively respond to and navigate the challenges and volatility of contemporary organisational contexts.
A promotional brochure explaining the Forward Works Viewer and that the tool was a key to cost-effective and efficient project delivery in Christchurch.