Search

found 40 results

Audio, Radio New Zealand

A scathing inquiry into the Earthquake Commission's handling of the 2010 and 2011 Canterbury earthquakes could mean huge change for how it handles claims. The Government says it's committed to implementing all of the recommendations from the inquiry, including improving its communication, planning and preparedness and dispute resolution. John Goddard, an insurance and employment law barrister who dealt with more than 4000 claims at the time, says repairs were handled poorly and the new recommendations won't cover all the bases. John Goddard and Melanie Bourke of EQC Fix speak to Corin Dann.

Images, Alexander Turnbull Library

In the top frame someone unseen (Murray McCully) in the Beehive says 'John! - There's been a bad reaction to us taking special powers to fix problems in Auckland!' Prime Minister John Key says 'What Murray?' In the lower frame Minister for the Rugby World Cup, Murray McCully, says 'The worst hit parts of Christchurch have declared themselves Fan Zones!' and the PM says 'Oh S..t!' The little Evans man says 'Sounds better than Red Zone!' Context: Refers to the chaos over transport and crowd control in the fanzone when much larger numbers of people flocked to the Rugby World Cup opening and revelry than expected. The government used special powers to take over the management of Queens Wharf fanzone spaces previously managed by an Auckland Council group, thus rather undermining the Mayor, Len Brown and the Auckland City Council. A new plan was signed off under special powers by Murray McCully directly after the fiasco. The Christchurch comment refers to the areas worst hit by the earhquakes. Colour and black and white versions available Quantity: 2 digital cartoon(s).

Audio, Radio New Zealand

It could be up to 18 months before 660 Christchurch homeowners know who will pay for earthquake damage repairs with a $1 billion price tag. The bill to fix houses in Christchurch that weren't repaired properly the first time round, or have suffered more damage in aftershocks, is climbing - and the government can't say who's liable. The problem is the homes have new owners who can't claim on theri insurance because the damage pre-dates them owning the home. Earlier Greater Christchurch Regeneration Minister Megan Woods told us the previous National government put no plan in place, and the current government is being left to pick up the pieces. Former Christchurch earthquake recovery minister Gerry Brownlee disputes the issue.

Audio, Radio New Zealand

A selection of the week's news including a former New Zealand cricketer demanding answers over how his name has been linked an investigation into match-fixing, the Act Party leader announces he is quitting as party leader and will leave parliament next year, the biggest drug haul in New Zealand history, the Auditor General apologises to Mangawhai locals for Audit New Zealand's failure to identify a 60 million-plus waste-water debacle, the Labour Party says its victory in the Christchurch East by-election is an indictment of the Government's response to the earthquakes, we hear from the author of a book about the building blocks of our words and literature and the national champion who will proudly represent New Zealand at an international competition in Perth.

Videos, NZ On Screen

In the late 1980s, Kiwi John Britten developed and built a revolutionary racing motorcycle. He pursued his dream all the way to Daytona International Speedway in Florida. In 1991 the underdog inventor came second against the biggest and richest manufacturers in the world. Britten: Backyard Visionary documents the maverick motorcycle designer as he and his crew rush to create an even better bike for the next Daytona. After arriving in Florida, another all-nighter is required to fix an untested vehicle with many major innovations. Costa Botes writes about the documentary here.

Images, Alexander Turnbull Library

An interested passerby assumes that a builder will be keen to get some EQC work fixing up Christchurch but the builder replies 'Are you kidding?! Not while EQC is paying us $4500 a week to do its assessments!' Context - The Earthquake Commission (EQC) has employed 414 contractors to carry out the assessments on its behalf, Radio New Zealand reported. Contractors carrying out property inspections of quake-damaged Christchurch homes are being paid about $4000 a week. Contractors are paid $75 an hour, while the builders, who inspect the damage, receive $60 an hour, the broadcaster said. (8 June 2011) Colour and black and white versions available Quantity: 2 digital cartoon(s).

Audio, Radio New Zealand

The Earthquake Commission has settled with a Christchurch homeowner, just days before their test case was due to be heard at the High Court. Jamie Gibling used his KiwiSaver to buy his first family home in New Brighton after the quakes, believing it had been properly repaired. He later learned the repairs were botched and would cost $300,000 to fix. His "onsold" test case was supposed to be heard on Monday to clarify who was liable. But today EQC announced it had reached a settlement with the family and that agreement would provide a framework for the 54 other claimants also with Shine Lawyers. Finance and EQC Minister Grant Robertson last week announced an "onsold" settlement kitty of $300 million for the next 12 months but legal experts working with claimants have told Checkpoint it could cost taxpayers much much more. EQC's Deputy Chief Executive is Renee Walker. On Thursday she came into the studio and Lisa Owen asked her if the Giblings got what they asked for and if the 54 others who signed up to the class action would get the same.

Audio, Radio New Zealand

A review of the week's news including... The bill to fix botched EQC repairs from the Canterbury earthquakes is now four times what the previous Government predicted just two years ago, immigrants are being computer profiled, MPs are told that medicinal cannabis should be legalised for more people, Middlemore Hospital's woes continue, the Government orders a compulsory recall of 50 thousand vehicles with faulty airbags, Auckland drivers face a double tax hike under proposed sweeping changes to transport funding, Parliament changes the law so New Zealand men with historical homosexual convictions can have them wiped, a bus company wants to recruit more than 100 drivers from overseas because it can't find enough people to do the job here, Dunedin has its biggest weekend ever in terms of money spent thanks to Ed Sheeran, first it was closing - now it's not, Kaikohe's Warehouse is to stay, it all comes together for the New Zealand cricket team against England, an international consortium reaches a verbal agreement to buy the New Zealand Warriors and the woman who was RNZ's Washington correspondent for more than 20 years has died.

Research Papers, Lincoln University

At 4.35 a.m. on the 4th of September 2010 Christchurch residents were shaken awake by a magnitude 7.1 earthquake, the largest earthquake to hit urban New Zealand for nearly 80 years. It was a large earthquake. On average the world only has 17 earthquakes a year larger than magnitude seven. Haiti’s earthquake in January 2010 was magnitude 7.1 and Chile’s earthquake in February was magnitude 8.8. Although it was a big quake, Christchurch was lucky. In Haiti’s earthquake over 230,000 people were killed and in Chile 40,000 homes were destroyed. Happily this was not the situation in Christchurch, however the earthquake has caused considerable damage. The challenge for the Landscape Architecture community is to contribute to the city’s reconstruction in ways that will not only fix the problems of housing, and the city’s urban, suburban and neighbourhood fabric but that will do so in ways that will help solve the landscape problems that dogged the city before the earthquake struck.

Research papers, University of Canterbury Library

Field surveys and experimental studies have shown that light steel or timber framed plasterboard partition walls are particularly vulnerable to earthquake damage prompting the overarching objective of this research, which is to further the development of low damage seismic systems for non-structural partition walls in order to facilitate their adoption by industry to assist with reducing the losses associated with the maintenance and repair cost of buildings across their design life. In particular, this study focused on the behaviour of steel-framed partition walls systems with novel detailing that aim to be “low-damage” designed according to common practice for walls used in commercial and institutional buildings in New Zealand. This objective was investigated by (1) investigating the performance of a flexible track system proposed by researchers and industry by experimental testing of full-scale specimens; (2) investigating the performance of the seismic gap partition wall systems proposed in a number of studies, further developed in this study with input from industry, by experimental testing of full-scale specimens; and (3) investigating the potential implications of using these systems compared with traditionally detailed partition wall systems within multi-storey buildings using the Performance Based Earthquake Engineering loss assessment methodology. Three full-scale testing frames were designed in order to replicate, under controlled laboratory conditions, the effects of seismic shaking on partition walls within multi-storey buildings by the application of quasi-static uni-directional cyclic loading imposing an inter-storey drift. The typical configuration for test specimens was selected to be a unique “y-shape”, including one angled return wall, with typical dimensions of approximately 2400 mm along the main wall and 600 mm along (approximately) the returns walls with a height of 2405 mm from floor to ceiling. The specimens were aligned within test frames at an oblique angle to the direction of loading in order to investigate bi- directional effects. Three wall specimens with flexible track detailing, two identical plane specimens and the third including a doorway, were tested. The detailing involved removing top track anchors within the proximity of wall intersections, thus allowing the tracks to ‘bow’ out at these locations. Although the top track anchors were specified to be removed the proximity of wall intersections, a construction error was made whereby a single top track slab to concrete anchor was left in at the three-way wall junction. Despite this error, the experimental testing was deemed worthwhile since such errors will also occur in practice and because the behaviour of the wall can be examined with this fixing in mind. The specimens also included an acoustic/fire sealant at the top lining to floor boundary. In addition to providing drift capacities, the force-displacement behaviour is also reported, the dissipated energy was computed, and the parameters of the Wayne-Stewart hysteretic model were fitted to the results. The specimen with the door opening behaved significantly different to the plane specimens: damage to the doorway specimen began as cracking of the wallboard propagating from the corners of the doorway following which the L- and Y- shaped junctions behaved independently, whereas damage to the plane specimens began as cracking of the wallboard at the top of the L-junction and wall system deformed as a single unit. The results suggest that bi-directional behaviour is important even if its impact cannot be directly quantified by the experiments conducted. Damage to sealant implies that the bond between plasterboard and sealant is important for its seismic performance. Careful quality control is advised as defects in the bond may significantly impact its ability to withstand seismic movement. Two specimens with seismic gap detailing were tested: a steel stud specimen and a timber stud specimen. Observed drift capacities were significantly greater than traditional plasterboard partition systems. Equations were used to predict the drift at which damage state 1 (DS1) and damage state 2 (DS2) would initiate. The equation used to estimate the drift at the onset of DS1 accurately predicted the onset of plaster cracking but overestimated the drift at which the gap filling material was damaged. The equation used to predict the onset of DS2 provided a lower bound for both specimens and also when used to predict results of previous experimental tests on seismic gap systems. The gap-filling material reduced the drift at the onset of DS1, however, it had a beneficial effect on the re-centring behaviour of the linings. Out-of-plane displacements and return wall configuration did not appear to significantly impact the onset of plaster cracking in the specimens. A loss assessment according to the PBEE methodology was conducted on four steel MRF case study buildings: (1) a 4-storey building designed for the Christchurch region, (2) a 4-storey building designed for the Wellington region, (3) a 12-storey building designed for the Christchurch region, and (4) a 12- storey building designed for the Wellington region. The fragility parameters for a traditional partition system, the flexible track partition system, and the seismic gap steel stud and timber stud partition systems were included within the loss assessment. The order (lowest to highest) of each system in terms of the expected annual losses of each building when incorporating the system was, (1) the seismic gap timber stud system, (2) the seismic gap steel stud system, (3) the traditional/baseline system, and (4) the flexible track system. For the seismic gap timber stud system, which incurred the greatest reduction in expected annual losses for each case study building, the reduction in expected annual losses in comparison to the losses found when using the traditional system ranged from a 5% to a 30% reduction. This reinforces the fact that while there is a benefit to the using low damage partition systems in each building the extent of reduction in expected annual losses is significantly dependent on the particular building design and its location. The flexible track specimens had larger repair costs at small hazard levels compared to the traditional system but smaller repair costs at larger hazard levels. However, the resulting expected annual losses for the flexible track system was higher than the traditional system which reinforces findings from past studies which observed that the greatest contribution to expected annual losses arises from low to moderate intensity shaking seismic events (low hazard levels).