Audio, Radio New Zealand

Base isolation has generally been considered an expensive system used mainly in commercial buildings to make them more earthquake resilient. Katy Gosset meets the University of Canterbury engineers who've developed a safe, low cost model that could work in our homes.

Research papers, University of Canterbury Library

Base isolation is an incredibly effective technology used in seismic regions throughout the world to limit structural damage and maintain building function, even after severe earthquakes. However, it has so far been underutilised in light-frame wood construction due to perceived cost issues and technical problems, such as a susceptibility to movement under strong wind loads. Light-frame wood buildings make up the majority of residential construction in New Zealand and sustained significant damage during the 2010-2011 Canterbury earthquake sequence, yet the design philosophy has remained largely unchanged for years due to proven life-safety performance. Recently however, with the advent of performance based earthquake engineering, there has been a renewed focus on performance factors such as monetary loss that has driven a want for higher performing residential buildings. This research develops a low-cost approach for the base isolation of light-frame wood buildings using a flat-sliding friction base isolation system, which addresses the perceived cost and technical issues, and verifies the seismic performance through physical testing on the shake table at the University of Canterbury. Results demonstrate excellent seismic performance with no structural damage reported despite a large number of high-intensity earthquake simulations. Numerical models are subsequently developed and calibrated to New Zealand light-frame wood building construction approaches using state-of-the-art wood modelling software, Timber3D. The model is used to accurately predict both superstructure drift and acceleration demand parameters of fixed-base testing undertaken after the base isolation testing programme is completed. The model development allows detailed cost analyses to be undertaken within the performance based earthquake engineering framework that highlights the monetary benefits of using base isolation. Cost assessments indicate the base isolation system is only 6.4% more compared to the traditional fixed-base system. Finally, a design procedure is recommended for base isolated light-frame wood buildings that is founded on the displacement based design (DBD) approach used in the United States and New Zealand. Nonlinear analyses are used to verify the DBD method which indicate its suitability.

Research papers, University of Canterbury Library

This study analyses the Earthquake Commission’s (EQC) insurance claims database to investigate the influence of seismic intensity and property damage resulting from the Canterbury Earthquake Sequence (CES) on the repair costs and claim settlement duration for residential buildings. Firstly, the ratio of building repair cost to its replacement cost was expressed as a Building Loss Ratio (BLR), which was further extended to Regional Loss Ratio (RLR) for greater Christchurch by multiplying the average of all building loss ratios with the proportion of building stock that lodged an insurance claim. Secondly, the total time required to settle the claim and the time taken to complete each phase of the claim settlement process were obtained. Based on the database, the regional loss ratio for greater Christchurch for three events producing shakings of intensities 6, 7, and 8 on the modified Mercalli intensity scale were 0.013, 0.066, and 0.171, respectively. Furthermore, small (less than NZD15,000), medium (between NZD15,000 and NZD100,000), and large (more than NZD100,000) claims took 0.35-0.55, 1.95-2.45, and 3.35-3.85 years to settle regardless of the building’s construction period and earthquake intensities. The number of claims was also disaggregated by various building characteristics to evaluate their relative contribution to the damage and repair costs.

Audio, Radio New Zealand

Southern Response is back in court today - this time having a final go at arguing that a class action against it should not be an 'opt-out'. Christchurch residents Brendan and Colleen Ross say the state insurer deliberately withheld the true cost of repairing their home which was damaged in the Canterbury earthquakes. They are now among 3000 people represented in a class action led by Christchurch lawyer Grant Cameron. In September last year the Court of Appeal decided the class action could proceed on an 'opt-out' basis - which means it would cover more people and potentially cost the state-owned insurer more money if it loses. Southern Response is challenging that decision in the Supreme Court, a two day hearing wrapped up on Tuesday. Checkpoint reporter Logan Church was there.

Audio, Radio New Zealand

A new report says the financial cost of a major earthquake in Wellington would be much bigger than the Canterbury quakes. Opposition parties attack the asset sales plan after Bill English's "it's just a guess" comment and cuts to jobs, services, and profits, hard times at Qantas.

Audio, Radio New Zealand

The former Earthquake Commission minister, Gerry Brownlee, is defending EQC over claims its assessors in Christchurch were not properly qualified. A growing number of homeowners in the city are discovering EQC assessors have completely missed quake damage including broken foundations costing hundreds of thousands to repair. That's been disastrous for people who've bought homes with hidden damage who are sometimes finding private insurers unwilling to cover the cost of putting right mistakes made by EQC. The company hired by EQC to carry out repairs was Fletcher Construction. Its chief executive at the time, Mark Binns, told Checkpoint that EQC probably hired unqualified people to assess quake damaged homes. Gerry Brownlee refused to be drawn on the comments from Mr Binns. But when asked by RNZ Christchurch reporter, Conan Young, if it was acceptable to have retired policemen, school principals and vacuum cleaner salesmen carrying out assessments for EQC, he admitted finding enough people to do the job was a challenge.

Images, Alexander Turnbull Library

A man representing New Zealand reads a newspaper whose headline is ''Quake may cost insurance co's up to $16B'. Above him is an enormous mosquito that represents 'increased premiums' and that is about to suck the blood out of him; it casts a huge menacing shadow in which the man stands. Context - Insurance companies have experienced massive losses after the Canterbury earthquake. This may ultimately result in higher premiums as insurance companies try to recoup from their loss. According to Chris Ryan, Insurance Council chief executive, "The quake would probably result in foreign reinsurance companies increasing the premiums they charged local insurers." (Stuff 9 Sep 2010) Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

A legal settlement between the Earthquake Commission and a group of Canterbury homeowners over the standard of quake repairs, is being described as a milestone for house owners throughout the country. The Reserve Bank has left the cost of borrowing unchanged at a record low 2-point-25 percent, athough it is signalling further cuts remain on the cards.

Audio, Radio New Zealand

An insurance expert says a Supreme Court decision yesterday could open lawyers up to legal action from anybody who has bought a home in Christchurch since the 2010 and 2011 earthquakes. The court's decision makes it clear that insurers cannot be held liable for meeting the full replacement cost of a quake damaged home by the subsequent purchaser of that house.

Audio, Radio New Zealand

The Australian Rugby Union is supporting a call by its New Zealand counterpart for changes to the World Cup cost structure, Canterbury's estimated 30 billion-dollar earthquake rebuild could receive a kick-start from the giant China Development Bank, When it comes to the battlefield of illness and infections, women are far more robust than their male counterparts.

Images, Alexander Turnbull Library

Text below the image reads 'More silence?..' Prime Minister John Key and the Governor General Sir Anand Satyanand and several 'hangers-on' almost suffer coronaries when an official suggests in discussions about 'cost-saving ideas' that 'One of the National Projects we could "reprioritise" in the wake of the earthquake is to axe any Kiwi VIP attendance at the royal wedding'. Context - The PM and Governor General are thought to be on the list for invitations to the wedding of Prince William and Kate Middleton but after the catastrophic Christchurch earthquake of 22 February 2011, which is going to cost the country billions, a wag wonders whether they should go. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

The government is crowdsourcing the cyclone recovery bill. It has launched an international fundraising effort, modelled on the Christchurch Earthquake Appeal - which raised almost $100 million. A separate special Lotto draw will also be held on March 18 with all proceeds going to affected communities. Prime Minister Chris Hipkins has urged New Zealanders to get behind the effort. He defended asking people to chip in when the cost-of-living is so high.

Audio, Radio New Zealand

The Earthquake Commission has settled with a Christchurch homeowner, just days before their test case was due to be heard at the High Court. Jamie Gibling used his KiwiSaver to buy his first family home in New Brighton after the quakes, believing it had been properly repaired. He later learned the repairs were botched and would cost $300,000 to fix. His "onsold" test case was supposed to be heard on Monday to clarify who was liable. But today EQC announced it had reached a settlement with the family and that agreement would provide a framework for the 54 other claimants also with Shine Lawyers. Finance and EQC Minister Grant Robertson last week announced an "onsold" settlement kitty of $300 million for the next 12 months but legal experts working with claimants have told Checkpoint it could cost taxpayers much much more. EQC's Deputy Chief Executive is Renee Walker. On Thursday she came into the studio and Lisa Owen asked her if the Giblings got what they asked for and if the 54 others who signed up to the class action would get the same.

Research papers, University of Canterbury Library

In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.

Images, eqnz.chch.2010

Hotel Grand Chancellor - Leaning 1m to the east, demolition will start about mid June and is expected to take 10 months to complete at a cost of approx NZ$10m. It will be the biggest & tallest demolition project in New Zealand. Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, ...

Audio, Radio New Zealand

Despite a hasty retreat from its iconic building in Christchurch's Square following the February earthquake, 'The Press', is in celebration mode. It's 150 years since the paper began with a six page edition that sold for six pence. It's first pages warned of the crippling cost of a new tunnel and rail line connecting Lyttelton to Christchurch, and on the back, a for sale ad for 100,000 gorse plants! Deb Nation finds the paper celebrated their centenary 50 years earlier, with memories of pigeon post and paper boys.

Audio, Radio New Zealand

In the hours after the February 2011 Canterbury earthquake, Chessie Henry's father Chris Henry, a Kaikoura-based doctor, crawled into makeshift tunnels in the collapsed CTV building to rescue the living and look for the dead. Six years later, Chessie interviewed Chris in an attempt to understand the trauma that lead her father to burnout. In her book just published, We Can Make A Life: A memoir of family, earthquakes and courage, Chessie Henry considers the psychological cost of heroism and unravels stories and memories from her family history.

Research papers, University of Canterbury Library

This paper outlines the deconstruction, redesign and reconstruction of a 2 storey timber building at the University of Canterbury, in Christchurch, New Zealand. The building consists of post tensioned timber frames and walls for lateral and gravity resistance, and timber concrete composite flooring. Originally a test specimen, the structure was subjected to extreme lateral displacements in the University structural testing laboratory. This large scale test of the structural form showed that post tensioned timber can withstand high levels of drift with little to no structural damage in addition to displaying full recentering characteristics with no residual displacements, a significant contributor to post earthquake cost. The building subsequently has been dismantled and reconstructed as offices for the Structural Timber Innovation Company (STIC). In doing this over 90% of the materials have been recycled which further enhances the sustainability of this construction system. The paper outlines the necessary steps to convert the structure from a test specimen into a functioning office building with minimal wastage and sufficient seismic resistance. The feasibility of recycling the structural system is examined using the key indicators of cost and time.

Research papers, University of Canterbury Library

With the occurrence of natural disasters on the increase, major cities around the world face the potential of complete loss of infrastructure due to design guidelines that do not consider resilience in the design. With the February 22nd, 2011 earthquake in Christchurch, being the largest insured event, lessons learnt from the rebuild will be vital for the preparation of future disasters. Therefore the objective of this research is to understand the financial implications of the changes to the waste water design guidelines used throughout the five year rebuild programme of works. The research includes a study of the SCIRT alliance model selected for the delivery that is flexible enough to handle changes in the design with minimal impact on the direct cost of the rebuild works. The study further includes the analysis and compares the impact of the three different guidelines on maintenance and replacement cost over the waste water pipe asset life. The research concludes that with the varying ground conditions in Christchurch and also the wide variety of materials in use in the waste water network up to the start of the CES, the rebuild was not a ‘one size fits all’ approach.

Images, Alexander Turnbull Library

Several 'quake victims' dive into a fissure and zip it up as Santa Claus in the form of a malignant '$' symbol leaps towards them yelling 'Ho! Ho! Ho!' One of the quake victims shouts 'Quick Hide! Christmas is getting closer!!' Context; the Christchurch earthquake on 4th September and all the subsequent aftershocks have cost many people a great deal of money. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

A Christchurch insurance advocate says the new Canterbury Earthquake Insurance Tribunal may finally be the solution to get unresolved claims from the 2010 and 2011 Canterbury earthquakes settled. The government has launched an earthquake insurance tribunal to try to finally resolve outstanding insurance claims from the Canterbury earthquakes. Dean Lester, who acts as a insurance claim preparer in Christchurch, told our reporter Rachel Graham the tribunal will have the power to get on and make a decision on the key sticking points, without people facing the huge cost of a high court trial.

Audio, Radio New Zealand

Construction delays and cost over-runs are prolonging the earthquake risks facing patients and staff at Christchurch hospital. Six major hospital buildings at the central city site have been listed as earthquake prone since May, but there is no safer space to shift patients into. Christchurch Hospital boss David Meates pron; Mates says the hospital is still basically a construction site. One earthquake prone building has roof tanks containing 75 tonnes of water. Mr Meates told RNZ reporter Phil Pennington removing the water from the tanks in the meantime is not an option.

Audio, Radio New Zealand

A review of the week's news including: Continuing industrial trouble at Ports Of Auckland, the National Road Policing manager Paula Rose on holiday road toll figures, Southland faces drought conditions, researchers come up with a solution that could lower the cost of rebuilding the earthquake devastated Christchurch CBD, a 24 year old woman with autism wins a 2011 attitude award for raising awareness of the condition, New Zealand Tasman Sea rowers hope to finally make some progress and how they celebrate New year at the bottom of the World.

Audio, Radio New Zealand

A Christchurch man with terminal cancer is using his final days to battle his insurance company, a decade on from the deadly earthquakes. Brian Shaw owns an apartment that's in a block of 11. They were all damaged in 2011. Shaw is a building consent officer. He says getting technical reports and chasing a settlement with insurer Vero has already cost the unit owners about $400,000, and they still have not even made it to court. On Friday morning he will be protesting outside Vero's Christchurch office, along with other unhappy customers.

Audio, Radio New Zealand

Christchurch has a big bill to contend with, if it still wants the multi-use stadium that's been in the works since the earthquakes 11 years ago. The problem-plagued project has blown out another $150 million, meaning it's going to cost $680 million and counting. The finish date's been pushed out too - to April 2026. Christchurch City Council's punting the hefty decision making back to the ratepayers. The options - increase the budget, scale back the project, or halt work altogether. Tessa Guest reports, and Crusaders CEO Colin Mansbridge talks to Lisa Owen.