Search

found 42 results

Images, UC QuakeStudies

Damage to the dome of the Cathedral of the Blessed Sacrament. Cracking around the base of the dome shows how it has moved. In the foreground, damage to the north-west corner of the building can be seen. The photographer comments, "A bike ride around the CBD. Catholic Cathedral, Barbadoes St".

Images, UC QuakeStudies

The sewage treatment ponds in Bromley. In the distance trucks and diggers can be seen piling up liquefaction silt. The photographer comments, "Looking NW from the causeway through the sewage wetlands. Mountains of liquefaction silt are being piled up near the corner of Breezes Rd and SH74-Anzac Drive".

Images, UC QuakeStudies

Trucks and diggers build large piles of liquefaction silt. In the foreground can be seen the Bromley sewage treatment ponds. The photographer comments, "Looking NW from the causeway through the sewage wetlands. Mountains of liquefaction silt are being piled up near the corner of Breezes Rd and SH74-Anzac Drive".

Images, UC QuakeStudies

Damage to the front of the Cathedral of the Blessed Sacrament. The upper part of the corner structures have collapsed, and the cross on the roof is on a lean. A statue of the Virgin Mary can be seen in a window. The photographer comments, "A bike ride around the CBD. Catholic Cathedral, Barbadoes St".

Images, UC QuakeStudies

A large crack in the road surface at the intersection of Medway Street and River Road, where River Road has slumped towards the river. The photographer comments, "Medway Street is a buckled mess of broken seal and liquefaction. 79 Medway St is on the right - taken at the corner of Medway St and River Rd".

Images, UC QuakeStudies

Damage to River Road in Richmond. The road is badly cracked and buckled, and is partly blocked off with road cones and warning tape. In the background is a truck carrying more road cones and signs. The photographer comments, "Major slumps and cracks along River Rd. Near 381 River Rd, looking towards the Banks Ave - Dallington Terrace corner".

Images, UC QuakeStudies

Damage to River Road in Richmond. The road is badly cracked and has slumped towards the river. Road cones and warning tape block off the road to vehicles. The photographer comments, "The end of River Rd, at the corner of Banks Ave-McBratneys Rd-Dallington Tce. Morons in 4WDs kept wanting to drive through here".

Images, UC QuakeStudies

Trucks and diggers build large piles of liquefaction silt. One pile has been covered with plastic sheeting, weighted down with tyres. In the foreground can be seen the Bromley sewage treatment ponds. The photographer comments, "Looking NW from the causeway through the sewage wetlands. Mountains of liquefaction silt are being piled up near the corner of Breezes Rd and SH74-Anzac Drive".

Images, UC QuakeStudies

Trucks and diggers build large piles of liquefaction silt. One pile has been covered with plastic sheeting, weighted down with tyres. In the foreground can be seen the Bromley sewage treatment ponds. The photographer comments, "Looking NW from the causeway through the sewage wetlands. Mountains of liquefaction silt are being piled up near the corner of Breezes Rd and SH74-Anzac Drive".

Images, UC QuakeStudies

Members of the University of Canterbury's E-Learning team in their temporary office in the NZi3 building. The photographer comments, "University of Canterbury administration all fits into one building! Well, sort of. The e-learning corner; Alan Hoskin (learning adviser) in the foreground, some guy in a blue shirt at my desk, Rob Stowell (our video guy) arriving, Herbert Thomas (group leader), Lei Zhang (elearning developer/sysadmin)".

Images, UC QuakeStudies

Members of the University of Canterbury's E-Learning team, Jess Hollis, Alan Hoskin, Paul Nicholls and Susan Tull, in their temporary office in the NZi3 building. The photographer comments, "University of Canterbury administration all fits into one building! Well, sort of. Jess with laptop on side desk, Paul the same on the other side, Susan getting sorted, Alan on the phone. Another day in the e-learning corner".

Images, UC QuakeStudies

Paul Nicholls, a member of the University of Canterbury's E-Learning team, in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Closer view of our corner of the building. We will have some cubicle partitions soon, but I don't know how we'll configure the space then. It's quite nice being so open, but it may be too noisy".