Search

found 54 results

Images, UC QuakeStudies

A photograph of the earthquake damage to a block of buildings on Hereford Street. Large sections of the buildings have collapsed and the rubble has spilled onto the footpath and street in front. USAR codes have been spray-painted on the front of Calendar Girls.

Audio, UC QuakeStudies

Part two of the audio that makes up Gap Filler's 29th project, the Transitional City Audio Tour. This part of the tour begins in Cathedral Square and includes commentary on the proposal for the Convention Centre. The tour then moves down Worcester Street, providing commentary on Hotel 115, the Old Government Building (now the Heritage Hotel), and the Trinity Church on the way. Once the tour reaches Latimer Square, it moves towards Hereford Street and there is commentary on the Green Frame, and the future of Les Mill and Calendar Girls. The tour then moves down Madras Street, passing the Transitional Cathedral and the artwork, 185 Empty Chairs. The tour ends with commentary on the Farmers' Trading Building, the first Farmers' building in Christchurch which was eventually replaced by the IRD Building on Madras Street.