Search

found 52 results

Images, UC QuakeStudies

A photograph of the badly-damaged Winnie Bagoes building on Colombo Street. The left side of the building has collapsed and a metal pole anchored to a concrete block is holding up the remains.

Images, UC QuakeStudies

A photograph of the badly-damaged Winnie Bagoes building on Colombo Street. The left side of the building has collapsed and a metal pole anchored to a concrete block is holding up the remains.

Images, UC QuakeStudies

A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.

Images, UC QuakeStudies

A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.

Images, UC QuakeStudies

A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.

Images, UC QuakeStudies

A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.

Images, UC QuakeStudies

A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.

Images, UC QuakeStudies

A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.

Images, UC QuakeStudies

A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.

Videos, UC QuakeStudies

A video of people shopping on the opening day of Re:Start Mall. Re:Start Mall is a container mall set up in Cashel Street after the 22 February 2011 earthquake. It is made up of shipping-container shops, with the Ballantynes Department Store reopening as a retail anchor.

Audio, Radio New Zealand

What does leadership look like in a disaster? David compares Auckland Mayor Wayne Brown's leadership this week with how Bob Parker and Lianne Dalziel coped with the Christchurch earthquakes and terror attacks. He looks at how current Christchurch mayor Phil Mauger's council is faring and whether reality meets the rhetoric and what's happened to the city's Metro Sports facility, one of the anchor projects in the rebuild.

Videos, UC QuakeStudies

A video of Mayor Bob Parker and Prime Minister John Key speaking at the opening of Re:Start Mall which has been set up on Cashel Street after the 22 February 2011 earthquake. Re:Start mall is made up of shipping-container shops, with the Ballantynes Department Store reopening as a retail anchor.

Videos, UC QuakeStudies

A video of the first part of a series of talks on the topic of Planning and People, at the 2012 Seismics and the City forum. The talks are as follows: Mary Devine, Managing Director of Ballantyne and Co, on Anchoring Re:START and holding the centre; Anthony Leighs, Chief Executive of Leighs Construction, on Deconstruction and Reconstruction; and Sam Johnson, founder of the Student Volunteer Army, on Mobilising a Quick Response.

Videos, UC QuakeStudies

A video of the second part of a series of talks on the topic of Planning and People, at the 2012 Seismics and the City forum. The talks are as follows: Mary Devine, Managing Director of Ballantyne and Co, on Anchoring Re:START and holding the centre; Anthony Leighs, Chief Executive of Leighs Construction, on Deconstruction and Reconstruction; and Sam Johnson, founder of the Student Volunteer Army, on Mobilising a Quick Response

Research Papers, Lincoln University

The 2013 Seddon earthquake (Mw 6.5), the 2013 Lake Grassmere earthquake (Mw 6.6), and the 2016 Kaikōura earthquake (Mw 7.8) provided an opportunity to assemble the most extensive damage database to wine storage tanks ever compiled worldwide. An overview of this damage database is presented herein based on the in-field post-earthquake damage data collected for 2058 wine storage tanks (1512 legged tanks and 546 flat-based tanks) following the 2013 earthquakes and 1401 wine storage tanks (599 legged tanks and 802 flat-based tanks) following the 2016 earthquake. Critique of the earthquake damage database revealed that in 2013, 39% and 47% of the flat-based wine tanks sustained damage to their base shells and anchors respectively, while due to resilience measures implemented following the 2013 earthquakes, in the 2016 earthquake the damage to tank base shells and tank anchors of flat-based wine tanks was reduced to 32% and 23% respectively and instead damage to tank barrels (54%) and tank cones (43%) was identified as the two most frequently occurring damage modes for this type of tank. Analysis of damage data for legged wine tanks revealed that the frame-legs of legged wine tanks sustained the greatest damage percentage among different parts of legged tanks in both the 2013 earthquakes (40%) and in the 2016 earthquake (44%). Analysis of damage data and socio-economic findings highlight the need for industry-wide standards, which may have socio-economic implications for wineries.

Audio, Radio New Zealand

The David and Goliath battle over a heritage building sitting in the way of a planned $473 million dollar, multi-use arena for Christchurch has ended up in court. The 25,000-seated, roofed arena is the final anchor project for the Christchurch rebuild and will be designed to host everything from All Blacks tests to big concerts. But sitting on the edge of the site, at 212 Madras Street, is the NG Building, a 115-year old warehouse that's home to a number of creative businesses. It escaped the worst of the 2011 earthquake and was strengthened by its owners: Roland Logan and Sharon Ng. They say they were told in 2013 the building could be incorporated into the arena's design, and are at loggerheads over its compulsory acquisition. Last week they were at the High Court seeking an injunction that would allow them to temporarily maintain ownership of the building, and that decision was released yesterday - and upheld. Roland joins Kathryn to discuss why they hope the building can be saved.

Research papers, University of Canterbury Library

An as-built reinforced concrete (RC) frame building designed and constructed according to pre-1970s code design construction practice has been recently tested on the shake table at the University of Canterbury. The specimen, 1/2.5 scaled version of the original prototype, consists of two 3-storey 2-bay asymmetric frames in parallel, one interior and one exterior, jointed together by transverse beams and floor slabs. Following the benchmark test, a retrofit intervention has been proposed to rehabilitate the tested specimen. In this paper, detailed information on the assessment and design of the seismic retrofit procedure using GFRP (glass fibre reinforced polymer) materials is given for the whole frame. Hierarchy of strength and sequence of events (damage mechanisms) in the panel zone region are evaluated using a moment-axial load (M-N) interaction performance domain, according to a performance-based retrofit philosophy. Specific limit states or design objectives are targeted with attention given to both strength and deformation limits. In addition, an innovative retrofit solution using FRP anchor dowels for the corner beam-column joints with slabs is proposed. Finally, in order to provide a practical tool for engineering practice, the retrofit procedure is provided in a step-by step flowchart fashion.

Research papers, The University of Auckland Library

This thesis describes the strategies for earthquake strengthening vintage clay bricks unreinforced masonry (URM) buildings. URM buildings are well known to be vulnerable to damage from earthquake-induced lateral forces that may result in partial or full building collapse. The 2010/2011 Canterbury earthquakes are the most recent destructive natural disaster that resulted in the deaths of 185 people. The earthquake events had drawn people’s attention when URM failure and collapse caused about 39 of the fatality. Despite the poor performance of URM buildings during the 2010/2011 Canterbury earthquakes, a number of successful case study buildings were identified and their details research in-depth. In order to discover the successful seismic retrofitting techniques, two case studies of retrofitted historical buildings located in Christchurch, New Zealand i.e. Orion’s URM substations and an iconic Heritage Hotel (aka Old Government Building) was conducted by investigating and evaluating the earthquake performance of the seismic retrofitting technique applied on the buildings prior to the 2010/2011 Canterbury earthquakes and their performance after the earthquakes sequence. The second part of the research reported in this thesis was directed with the primary aim of developing a cost-effective seismic retrofitting technique with minimal interference to the vintage clay-bricks URM buildings. Two retrofitting techniques, (i) near-surface mounted steel wire rope (NSM-SWR) with further investigation on URM wallettes to get deeper understanding the URM in-plane behaviour, and (ii) FRP anchor are reported in this research thesis.

Research papers, University of Canterbury Library

Field surveys and experimental studies have shown that light steel or timber framed plasterboard partition walls are particularly vulnerable to earthquake damage prompting the overarching objective of this research, which is to further the development of low damage seismic systems for non-structural partition walls in order to facilitate their adoption by industry to assist with reducing the losses associated with the maintenance and repair cost of buildings across their design life. In particular, this study focused on the behaviour of steel-framed partition walls systems with novel detailing that aim to be “low-damage” designed according to common practice for walls used in commercial and institutional buildings in New Zealand. This objective was investigated by (1) investigating the performance of a flexible track system proposed by researchers and industry by experimental testing of full-scale specimens; (2) investigating the performance of the seismic gap partition wall systems proposed in a number of studies, further developed in this study with input from industry, by experimental testing of full-scale specimens; and (3) investigating the potential implications of using these systems compared with traditionally detailed partition wall systems within multi-storey buildings using the Performance Based Earthquake Engineering loss assessment methodology. Three full-scale testing frames were designed in order to replicate, under controlled laboratory conditions, the effects of seismic shaking on partition walls within multi-storey buildings by the application of quasi-static uni-directional cyclic loading imposing an inter-storey drift. The typical configuration for test specimens was selected to be a unique “y-shape”, including one angled return wall, with typical dimensions of approximately 2400 mm along the main wall and 600 mm along (approximately) the returns walls with a height of 2405 mm from floor to ceiling. The specimens were aligned within test frames at an oblique angle to the direction of loading in order to investigate bi- directional effects. Three wall specimens with flexible track detailing, two identical plane specimens and the third including a doorway, were tested. The detailing involved removing top track anchors within the proximity of wall intersections, thus allowing the tracks to ‘bow’ out at these locations. Although the top track anchors were specified to be removed the proximity of wall intersections, a construction error was made whereby a single top track slab to concrete anchor was left in at the three-way wall junction. Despite this error, the experimental testing was deemed worthwhile since such errors will also occur in practice and because the behaviour of the wall can be examined with this fixing in mind. The specimens also included an acoustic/fire sealant at the top lining to floor boundary. In addition to providing drift capacities, the force-displacement behaviour is also reported, the dissipated energy was computed, and the parameters of the Wayne-Stewart hysteretic model were fitted to the results. The specimen with the door opening behaved significantly different to the plane specimens: damage to the doorway specimen began as cracking of the wallboard propagating from the corners of the doorway following which the L- and Y- shaped junctions behaved independently, whereas damage to the plane specimens began as cracking of the wallboard at the top of the L-junction and wall system deformed as a single unit. The results suggest that bi-directional behaviour is important even if its impact cannot be directly quantified by the experiments conducted. Damage to sealant implies that the bond between plasterboard and sealant is important for its seismic performance. Careful quality control is advised as defects in the bond may significantly impact its ability to withstand seismic movement. Two specimens with seismic gap detailing were tested: a steel stud specimen and a timber stud specimen. Observed drift capacities were significantly greater than traditional plasterboard partition systems. Equations were used to predict the drift at which damage state 1 (DS1) and damage state 2 (DS2) would initiate. The equation used to estimate the drift at the onset of DS1 accurately predicted the onset of plaster cracking but overestimated the drift at which the gap filling material was damaged. The equation used to predict the onset of DS2 provided a lower bound for both specimens and also when used to predict results of previous experimental tests on seismic gap systems. The gap-filling material reduced the drift at the onset of DS1, however, it had a beneficial effect on the re-centring behaviour of the linings. Out-of-plane displacements and return wall configuration did not appear to significantly impact the onset of plaster cracking in the specimens. A loss assessment according to the PBEE methodology was conducted on four steel MRF case study buildings: (1) a 4-storey building designed for the Christchurch region, (2) a 4-storey building designed for the Wellington region, (3) a 12-storey building designed for the Christchurch region, and (4) a 12- storey building designed for the Wellington region. The fragility parameters for a traditional partition system, the flexible track partition system, and the seismic gap steel stud and timber stud partition systems were included within the loss assessment. The order (lowest to highest) of each system in terms of the expected annual losses of each building when incorporating the system was, (1) the seismic gap timber stud system, (2) the seismic gap steel stud system, (3) the traditional/baseline system, and (4) the flexible track system. For the seismic gap timber stud system, which incurred the greatest reduction in expected annual losses for each case study building, the reduction in expected annual losses in comparison to the losses found when using the traditional system ranged from a 5% to a 30% reduction. This reinforces the fact that while there is a benefit to the using low damage partition systems in each building the extent of reduction in expected annual losses is significantly dependent on the particular building design and its location. The flexible track specimens had larger repair costs at small hazard levels compared to the traditional system but smaller repair costs at larger hazard levels. However, the resulting expected annual losses for the flexible track system was higher than the traditional system which reinforces findings from past studies which observed that the greatest contribution to expected annual losses arises from low to moderate intensity shaking seismic events (low hazard levels).

Research papers, The University of Auckland Library

It is well known that buildings constructed using unreinforced masonry (URM) are susceptible to damage from earthquake induced lateral forces that may result in partial or full building collapse. The 2010/2011 Canterbury earthquakes are the most recent New Zealand example of destructive earthquakes, which have drawn people's attention to the inherent seismic weaknesses of URM buildings and anchored masonry veneer systems in New Zealand. A brief review of the data collected following the 2010 Darfield earthquake and more comprehensive documentation of data that was collected following the 2011 Christchurch earthquake is presented, along with the findings from subsequent data interrogation. Large stocks of earthquake prone vintage URM buildings that remain in New Zealand and in other seismically active parts of the world result in the need for minimally invasive and cost effective seismic retrofit techniques. The principal objective of the doctoral research reported herein was to investigate the applicability of near surface mounted (NSM) carbon fibre reinforced polymer (CFRP) strips as a seismic improvement technique. A comprehensive experimental program consisting of 53 pull tests is presented and is used to assess the accuracy of existing FRP-to-masonry bond models, with a modified model being proposed. The strength characteristics of vintage clay brick URM wall panels from two existing URM buildings was established and used as a benchmark when manufacturing replica clay brick test assemblages. The applicability of using NSM CFRP strips as a retrofitting technique for improving the shear strength and the ductility capacity of multi-leaf URM walls constructed using solid clay brick masonry is investigated by varying CFRP reinforcement ratios. Lastly, an experimental program was undertaken to validate the proposed design methodology for improving the strength capacity of URM walls. The program involved testing full-scale walls in a laboratory setting and testing full-scale walls in-situ in existing vintage URM buildings. Experimental test results illustrated that the NSM CFRP technique is an effective method to seismically strengthen URM buildings.

Audio, Radio New Zealand

Hon DAVID CUNLIFFE to the Prime Minister: Does he have confidence that his Ministers are ethical and competent? DAVID BENNETT to the Minister of Finance: What reports has he received on building momentum in the New Zealand economy and how this is supporting jobs? METIRIA TUREI to the Prime Minister: Has he checked his files yet regarding whether Hon John Banks declared a potential conflict of interest in relation to the New Zealand International Convention Centre Bill while still a Minister; if so, was any conflict declared? Hon ANNETTE KING to the Minister of Health: Is he satisfied with the performance of Health Benefits Ltd; if so, why? NICKY WAGNER to the Minister for Canterbury Earthquake Recovery: What recent progress has been made on the anchor projects in the Christchurch Central recovery plan? ANDREW WILLIAMS to the Minister of Conservation: Has he received any reports on the environmental impact of seismic surveying in the New Zealand Exclusive Economic Zone? Hon MARYAN STREET to the Minister of State Services: Has he asked the State Services Commissioner for reports on recent failures of state sector agencies to carry out their functions according to the law; if not, why not? IAN McKELVIE to the Minister for Primary Industries: What progress can he report on boosting innovation in the primary sector through the Primary Growth Partnership? Hon DAMIEN O'CONNOR to the Minister for Primary Industries: What reports, if any, has he received on the state of the New Zealand kiwifruit industry? PAUL FOSTER-BELL to the Minister of Police: What recent announcements has she made to support the victims of serious financial crime? Hon RUTH DYSON to the Minister of Conservation: Why did he tell the House on 24 September "the first I knew of the issue of the submission was just 5 days before" when as he stated on 17 October "The first full briefing on Tukituki was on 5 March and it confirmed the department's role in the process and mentioned nitrogen and phosphorous management"? Dr KENNEDY GRAHAM to the Minister for Climate Change Issues: Will he explain, given the latest projection of New Zealand's net greenhouse gas emissions is around 90 million tonnes in 2040, how the Government can conceivably reach its own emissions reduction target of 30 million tonnes by 2050?

Research papers, University of Canterbury Library

Organisations play a vital role in assisting communities to recover from disasters. They are the key providers of goods and services needed in both response and recovery efforts. They provide the employment which both anchors people to place and supports the taxation base to allow for necessary recovery spending. Finally, organisations are an integral part of much day to day functioning contributing immensely to people’s sense of ‘normality’ and psychological wellbeing. Yet, despite their overall importance in the recovery process, there are significant gaps in our existing knowledge with regard to how organisations respond and recover following disaster. This research fills one part of this gap by examining collaboration as an adaptive strategy enacted by organisations in the Canterbury region of New Zealand, which was heavily impacted by a series of major earthquakes, occurring in 2010 and 2011. Collaboration has been extensively investigated in a variety of settings and from numerous disciplinary perspectives. However, there are few studies that investigate the role of collaborative approaches to support post-disaster business recovery. This study investigates the type of collaborations that have occurred and how they evolved as organisations reacted to the resource and environmental change caused by the disaster. Using data collected through semi-structured interviews, survey and document analysis, a rich and detailed picture of the recovery journey is created for 26 Canterbury organisations including 14 collaborators, six non-traders, five continued traders and one new business. Collaborations included two or more individual businesses collaborating along with two multi-party, place based projects. Comparative analysis of the organisations’ experiences enabled the assessment of decisions, processes and outcomes of collaboration, as well as insight into the overall process of business recovery. This research adopted a primarily inductive, qualitative approach, drawing from both grounded theory and case study methodologies in order to generate theory from this rich and contextually situated data. Important findings include the importance of creating an enabling context which allows organisations to lead their own recovery, the creation of a framework for effective post-disaster collaboration and the importance of considering both economic and other outcomes. Collaboration is found to be an effective strategy enabling resumption of trade at a time when there seemed few other options available. While solving this need, many collaborators have discovered significant and unexpected benefits not just in terms of long term strategy but also with regard to wellbeing. Economic outcomes were less clear-cut. However, with approximately 70% of the Central Business District demolished and rebuilding only gaining momentum in late 2014, many organisations are still in a transition stage moving towards a new ‘normal’.