Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Large cracks along the stop bank".
The state of emergency in Christchurch has just been extended until midday on Wednesday. In latest developments Canterbury Civil Defence is now warning people to prepare for potential flooding, only two days after the major earthquake that caused widespread damage to much of the region.
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Ian Heslop, ECAN Design and Operations Engineer".
PDF slides from a presentation given by Dr. Thomas Wilson from the UC Geology department on 18 November 2010 in Wellington. The presentation was delivered at a State Services Briefing at the Reserve Bank Seminar Room, and at a public talk for UC Alumni at the Wellington Club.
Photograph captioned by Fairfax, "Christchurch was rocked by a large aftershock shortly after 8am this morning. The state of emergency has been extended for a further 7 days and more army personnel have been brought into the city".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Earthquake damage repair work on the stop bank".
Photograph captioned by Fairfax, "Christchurch Earthquake. Christchurch was rocked by a large aftershock shortly after 8am this morning. The state of emergency has been extended for a further 7 days and more army personnel have been brought into the city".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. A large crack at the base of the stop bank".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Large cracks along the top of the stop bank".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Engineers huddle on the stop bank to discuss the situation".
Hide backs Garrett despite passport fraud, Christchurch firms hopeful RBNZ will keep rates on hold, Radio New Zealand's political editor discusses Act turmoil, Earthquake muddies picture on future OCR rises, State of emergency expected to be lifted in Canterbury, Kaikoura slip due to be cleared today and Statue of Battle of Britain hero Sir Keith Park unveiled in London.
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. TV crew film the inside of the crack on the stop bank while John McCombe (photographer) looks on".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in NZ have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. The once level stop bank has lowered about 1.5 metres in place. Kaiapoi township is to the left of the frame".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".
Liquefaction of sandy soil has been observed to cause significant damage to infrastructure during major earthquakes. Historical cases of liquefaction have typically occurred in sands containing some portion of fines particles, which are defined as 75μm or smaller in diameter. The effects of fines on the undrained behaviour of sand are not however fully understood, and this study therefore attempts to quantify these effects through the undrained testing of sand mixed with non-plastic fines sourced from Christchurch, New Zealand. The experimental program carried out during this study consisted of undrained monotonic and cyclic triaxial tests performed on three different mixtures of sand and fines: the Fitzgerald Bridge mixture (FBM), and two Pinnacles Sand mixtures (PSM1 and PSM2). The fines content of each host sand was systematically varied up to a maximum of 30%, with all test specimens being reconstituted using moist tamping deposition. The undrained test results from the FBM soils were interpreted using a range of different measures of initial state. When using void ratio and relative density, the addition of fines to the FBM sand caused more contractive behaviour for both monotonic and cyclic loadings. This resulted in lower strengths at the steady state of deformation, and lower liquefaction resistances. When the intergranular void ratio was used for the interpretation, the effect of additional fines was to cause less contractive response in the sand. The state parameter and state index were also used to interpret the undrained cyclic test results – these measures suggested that additional fines caused less contractive sand behaviour, the opposite to that observed when using the void ratio. This highlighted the dependency on the parameter chosen as a basis for the response comparison when determining the effects of fines, and pointed out a need to identify a measure that normalizes such effects. Based on the FBM undrained test results and interpretations, the equivalent granular void ratio, e*, was identified from the literature as a measure of initial state that normalizes the effects of fines on the undrained behaviour of sand up to a fines content of 30%. This is done through a parameter within the e* definition termed the fines influence factor, b, which quantifies the effects of fines from a value of zero (no effect) to one (same effect as sand particles). The value of b was also determined to be different when interpreting the steady state lines (bSSL) and cyclic resistance curves (bCR) respectively for a given mixture of sand and fines. The steady state lines and cyclic resistance curves of the FBM soils and a number of other sand-fines mixtures sourced from the literature were subsequently interpreted using the equivalent granular void ratio concept, with bSSL and bCR values being back-calculated from the respective test data sets. Based on these interpretations, it was concluded that e* was conceptually a useful parameter for characterizing and quantifying the effects of fines on the undrained behaviour of sand, assuming the fines influence factor value could be derived. To allow prediction of the fines influence factor values, bSSL and bCR were correlated with material and depositional properties of the presented sand-fines mixtures. It was found that as the size of the fines particles relative to the sand particles became smaller, the values of bSSL and bCR reduced, indicating lower effect of fines. The same trend was also observed as the angularity of the sand particles increased. The depositional method was found to influence the value of bCR, due to the sensitivity of cyclic loading to initial soil fabric. This led to bSSL being used as a reference for the effect of fines, with specimens prepared by moist tamping having bCR > bSSL, and specimens prepared by slurry deposition having bCR < bSSL. Finally the correlations of the fines influence factor values with material and depositional properties were used to define the simplified estimation method – a procedure capable of predicting the approximate steady state lines and cyclic resistance curves of a sand as the non-plastic fines content is increased up to 30%. The method was critically reviewed based on the undrained test results of the PSM1 and PSM2 soils. This review suggested the method could accurately predict undrained response curves as the fines content was raised, based on the PSM1 test results. It also however identified some key issues with the method, such as the inability to accurately predict the responses of highly non-uniform soils, a lack of consideration for the entire particle size distribution of a soil, and the fact the errors in the prediction of bSSL carry through into the prediction of bCR. Lastly some areas of further investigation relating to the method were highlighted, including the need to verify the method through testing of sandy soils sourced from outside the Christchurch area, and the need to correlate the value of bCR with additional soil fabrics / depositional methods.
The Queen tells Prince Philip that she has received a 'Dear John' letter from PM John Key and that it 'seems the earth has moved for him back in NZ'. Text above reads 'Keynote'. In a second version the queen says that John Key 'preferred to stay at home 'cos the earth moved'. A third version refers to the decision of the PM to remain in New Zealand because of the Christchurch earthquake instead of going on a trip to Europe with his wife during which they were to have stayed at the invitation of the Queen at Balmoral Castle in Scotland. Quantity: 3 digital cartoon(s).