Workers at the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) opening. The ceremony was held in Burwood Park.
A pdf copy of a PowerPoint presentation prepared for the Australia New Zealand Geotechnical Engineering Conference.
A paper prepared for the Bulletin of the New Zealand Society for Earthquake Engineering, Vol. 44, no. 4, December 2011.
A paper prepared for the Water New Zealand 2014 conference which considers resilience lessons for reservoirs, pump stations and pipelines.
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
A pdf copy of a PowerPoint presentation prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
Earthquake Recovery Minister Gerry Brownlee speaking at the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT).
Buckled columns on a house in Wainoni. The photographer comments, "A Sunday afternoon ride to New Brighton, then back via Aranui, Wainoni, Dallington, and Richmond. Not a cheerful experience. 'We've decided you're a repair, not a rebuild after all'. Actually, I think these houses might be red zoned".
Workers talking amongst themselves at the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) opening. The ceremony was held in Burwood Park.
Multiple cranes viewed through a cordon fence. The Novotel Hotel building stands in the foreground and the Rendezvous Hotel building in background.
The eastern face of Christ Church Cathedral. The damaged windows have been boarded up. A shipping container sits in the overgrown garden.
A member of the New Zealand Army stands outside a cordon check point on Hereford Street.
A new building under construction on Kilmore Street. A sign reading, 'Danger keep out' has been placed on the security fence.
A photograph captioned by BeckerFraserPhotos, "Digging out the basement of the ANZ building in Cathedral Square".
A photograph captioned by BeckerFraserPhotos, "The Heritage Apartment Hotel in Cathedral Square all refurbished and ready to occupy".
A web story about a site visit to the Bridge and Arch by local school pupils.
A Ngai Tahu elder presents to politicians and the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). The ceremony was held in Burwood Park.
A photograph captioned by BeckerFraserPhotos, "An artwork on the end wall of Re:START Mall".
Mayor Bob Parker speaking at the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). The ceremony was held in Burwood Park.
Mayor Bob Parker speaking at the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). The ceremony was held in Burwood Park.
Reverend Peter Beck leading a prayer at the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) opening. The ceremony was held in Burwood Park.
Reverend Peter Beck leading a prayer at the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) opening. The ceremony was held in Burwood Park.
Mayor Bob Parker speaking at the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). The ceremony was held in Burwood Park.
Mayor Bob Parker speaking at the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). The ceremony was held in Burwood Park.
Mayor Bob Parker speaking at the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). The ceremony was held in Burwood Park.
Phil Goff leading the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) as they are welcomed by a powhiri. The ceremony was held in Burwood Park.
The demolition site of the Holiday Inn City Centre on Cashel Street. Reinforcement cabling protrudes from the top of the concrete posts. Rubble from the demolition surrounds the site.
Earthquake Minister Gerry Brownlee speaking at the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). The ceremony was held in Burwood Park.
Earthquake Minister Gerry Brownlee speaking at the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). The ceremony was held in Burwood Park.
Workers of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) listening to a talk at the opening of SCRIT. The ceremony was held in Burwood Park.