Search

found 445 results

Videos, UC QuakeStudies

A video of a presentation by Ian Campbell, Executive General Manager of the Stronger Christchurch Rebuild Team (SCIRT), during the third plenary of the 2016 People in Disasters Conference. The presentation is titled, "Putting People at the Heart of the Rebuild".The abstract for this presentation reads: On the face of it, the Stronger Christchurch Infrastructure Rebuild Team (SCIRT) is an organisation created to engineer and carry out approximately $2B of repairs to physical infrastructure over a 5-year period. Our workforce consists primarily of engineers and constructors who came from far and wide after the earthquakes to 'help fix Christchurch'. But it was not the technical challenges that drew them all here. It was the desire and ambition expressed in the SCIRT 'what we are here for' statement: 'to create resilient infrastructure that gives people security and confidence in the future of Christchurch'. For the team at SCIRT, people are at the heart of our rebuild programme. This is recognised in the intentional approach SCIRT takes to all aspects of its work. The presentation will touch upon how SCIRT communicated with communities affected by our work and how we planned and coordinated the programme to minimise the impacts, while maximising the value for both the affected communities and the taxpayers of New Zealand and rate payers of Christchurch funding it. The presentation will outline SCIRT's very intentional approach to supporting, developing, connecting, and enabling our people to perform, individually, and collectively, in the service of providing the best outcome for the people of Christchurch and New Zealand.

Images, UC QuakeStudies

A camera man filming Christchurch Mayor Bob Parker and Earthquake Recovery Minister Gerry Brownlee handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). A contractor is standing to the left.

Images, UC QuakeStudies

A photograph of the crowd at the launch of the Green Room on Colombo Street.Crack'd for Christchurch comments, "Before the speeches. The Green Room is on Colombo Street in the centre of the rebuild, with vacant lots surrounding it. We wanted it to be an oasis of calm and hope for Christchurch people. It is only a temporary site."

Images, UC QuakeStudies

A photograph of the crowd at the launch of the Green Room on Colombo Street.Crack'd for Christchurch comments, "Before the speeches. The Green Room is on Colombo Street in the centre of the rebuild, with vacant lots surrounding it. We wanted it to be an oasis of calm and hope for Christchurch people. It is only a temporary site."

Images, eqnz.chch.2010

What I found on a walk around the city Christchurch November 20, 2013 New Zealand. www.isaactheatreroyal.co.nz/ en.wikipedia.org/wiki/2011_Christchurch_earthquake

Articles, UC QuakeStudies

A copy of a letter from Empowered Christchurch to Peter Sparrow, Director of Building Control and Rebuild at the Christchurch City Council, sent on 23 October 2014. The letter is a response to another letter sent by Peter Sparrow to Empowered Christchurch regarding existing use rights and exemptions from a building consent. In this letter, Empowered Christchurch requests furthur clarification from the Christchurch Building Consent Authority about these concepts.

Research papers, University of Canterbury Library

The level of destruction from the 2011 Christchurch earthquakes led to changes in the New Zealand seismic building code. The destruction showed that the NZ building codes did not fully performed to expectation and needed Improvement to ensure that impact of future earthquakes would be minimised. The building codes have been amended to improve buildings resilience to earthquake and other related extreme loading conditions. Rebuilding Christchurch with the new modifications in the seismic building code comes with its own unique challenges to the entire system. This project investigates the impact of rebuilding Christchurch with the new seismic Building codes in terms of how the new changes affected the building industry and the management of construction.