Search

found 106 results

Images, Alexander Turnbull Library

An exceedingly large 'Gerry' Brownlee, the Minister for Earthquake Recovery, rises from a chair, holding a briefcase labeled 'CERA' and calling for 'Bob' Parker, the mayor of Christchurch. The thin Parker was flattened against Brownlee's enormous rear, when Brownlee sat on the chair. Brownlee and Parker had a strained relationship, with the government taking an increasing amount of control in local decision making. After ongoing assurances by Parker that Christchurch City Council would meet all of International Accreditation New Zealand's requirements on issuing building consents, Brownlee announced in June 2013 without Parker's prior knowledge that the authority had withdrawn its accreditation. Quantity: 1 digital cartoon(s).

Images, UC QuakeStudies

A digitally manipulated image of the Lawrie and Wilson Auctioneers building on Tuam Street. The photographer comments, "This building at 210 Tuam Street is still off limits after the Christchurch earthquake. It has Lawrie and Wilson Auctioneers at the top and Christchurch City Council below. In the past it had a City Photography and at a different time a Parking Unit sign".

Videos, UC QuakeStudies

A video of an address by Alex Cutler, CEO of the New Zealand Green Building Council, at the 2014 Seismics and the City forum. This talk was part of the Building Communities section and explored the extent to which the new city core will be a 'government-flavoured doughnut', the key issues with this concept, and the possible solutions.

Audio, Radio New Zealand

About two hundred of those who lost loved ones in collapsed buildings in Christchurch's 2011 earthquake, heard an apology from the city's mayor, Lianne Dalziel yesterday. A royal commission in to faulty buildings found serious errors by engineers and the Christchurch City Council 185 people died during the earthquake on the 22nd of February, 2011. David Selway who lost his sister Susan Selway in the CTV Building, said it was good to hear a heartfelt apology from the mayor for the role her council played in signing off the building as safe.

Research papers, Victoria University of Wellington

In the late 1960s the Wellington City Council surveyed all the commercial buildings in the city and marked nearly 200 as earthquake prone. The owners were given 15 years to either strengthen or demolish their buildings. The end result was mass demolition throughout the seventies and eighties.¹ Prompted by the Christchurch earthquakes, once again the council has published a list of over 630 earthquake prone buildings that need to be strengthened or demolished by 2030.²Of these earthquake prone buildings, the majority were built between 1880 and 1930, with 125 buildings appearing on the Wellington City Council Heritage Building List.³ This list accounts for a significant proportion of character buildings in the city. There is a danger that the aesthetic integrity of our city will be further damaged due to the urgent need to strengthen these buildings. Many of the building owners are resistant because of the high cost. By adapting these buildings to house co-workspaces, we can gain more than just the retention of the building’s heritage. The seismic upgrade provides the opportunity for the office space to be redesigned to suit changes in the ways we work. Through a design-based research approach this thesis proposes a framework that clarifies the process of adapting Wellington’s earthquake prone heritage buildings to accommodate co-working. This framework deals with the key concepts of program, structure and heritage. The framework is tested on one of Wellington’s earthquake prone heritage buildings, the Wellington Working Men’s Club, in order to demonstrate what can be gained from this strengthening process. ¹ Reid, J., “Hometown Boomtown,” in NZ On Screen (Wellington, 1983). ² Wellington City Council, List of Earthquake Prone Buildings as at 06/03/2017. (Wellington: Absolutely Positively Wellington. 2017). ³ ibid. 

Videos, UC QuakeStudies

A video of Lianne Dalziel announcing her decision to run for the mayoralty of Christchurch. Dalziel talks about the rebuild of Christchurch, and the daily lives of those living in post-earthquake Christchurch. She also talks about her decision to run independently, her experience as a minister, and the need for transparency and financial integrity in the Christchurch City Council. Lastly, she talks about the building consent crisis at the Council, and the need for the Council to connect with communities.

Other, National Library of New Zealand

Christchurch City Council website on the infrastructure rebuild of Christchurch following the 2010 and 2011 earthquakes. Includes news; information on SMART building; projects related to rebuilding of facilities, transport, suburban centres and the central city.

Images, eqnz.chch.2010

The old Christchurch City Council building on Tuam Street was damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.

Images, eqnz.chch.2010

The old Christchurch City Council building on Tuam Street was damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.

Videos, UC QuakeStudies

A video about the Christchurch City Council housing complex on Conference Street in the Christchurch central city. The housing complex was unoccupied after the 22 February 2011 earthquake despite the housing shortage. Christchurch City Council said that the vacant units could not be lived in because of structural damage or damage to services. However, the building has been checked by structural engineers and many of the rooms have been deemed safe to occupy.

Images, UC QuakeStudies

A information board on the fence around the Homestead at Mona Vale. It says 'This hertiage building is managed by the Christchurch City Council on behalf of the city's residents. Until recently it served as a restaurant and function centre. This building was damaged in the 2010/2011 Canterbury earthquakes and ongoing aftershocks. Propping walls and other support is designed to keep the building weather-proof until a decision about its future can be made'.

Audio, Radio New Zealand

A woman badly injured in the Christchurch earthquake is astonished a new building in the city has been found to have serious seismic flaws. The empty new office building at 230 High Street has multiple problems in its earthquake design that the city council was warned about almost two years ago. Construction of the seven-storey building continued even after those warnings in December 2017. Susie Ferguson speaks to University of Canterbury lecturer Ann Brower, who was crushed after falling masonry fell on her bus during the February twenty-second 2011 earthquake.

Videos, UC QuakeStudies

A video of the Christchurch City Council meeting to discuss its consenting process. The meeting was called after the council received a letter from International Accreditation New Zealand (IANZ) on 30 May 2013. The letter states that the Council has until 28 June 2013 to improve its processes or it will be stripped of its accreditation as a building consent authority. The video includes discussion from Councillor Barry Corbett, Acting Building Operations Manager Steve McCarthy, Democracy Services General Manager Peter Mitchell, Councillor Aaron Keown, and Councillor Claudia Reid.

Audio, Radio New Zealand

A Christchurch woman whose mother died in the 2011 earthquake says an apology from the Christchurch mayor Lianne Dalziel does not lessen her grief. Yesterday - nine years and one day since the quake killed 185 people - Dalziel invited their families for a private apology. She acknowledged errors made by engineers and the city council in regards to the CTV building. Julie Hibbs lost her mother in the collapse of the building. She speaks to Susie Ferguson.