A video about engineers recovering the internal copper dome of the Cathedral of the Blessed Sacrament by lifting it out in one piece. The dome was undamaged after the 22 February 2011 earthquakes, but lost most of its supporting columns. Engineers have decided to remove the dome to ensure it will not be damaged during further aftershocks.
Photograph captioned by Fairfax, "School's out! Pupils from St Pauls School leave their temporary campus at Catholic Cathedral College for the summer holidays. The Dallington Catholic school pupils have had a hell of a time after their school was badly damaged in the 4 September earthquake".
Digitally manipulated image of the damaged Cathedral of the Blessed Sacrament, superimposed with a seismograph trace. The photographer comments, "What we want to forget, but must remember".
Cathedral of the Blessed Sacrameny aka Christchurch Basilica
Cathedral of the Blessed Sacrameny aka Christchurch Basilica
Cathedral of the Blessed Sacrameny aka Christchurch Basilica
A photograph of high school students working at the Fitzgerald Avenue Community Garden.
The Cathedral of the Blessed Sacrament, Christcurch, after the 6.3 magnitude quake on 22 February 2011. When The Angels Fall Take your father's cross Gently from the wall A shadow still remaining See the churches fall In mighty arcs of sound And all that they're containing Yet all the rugged souls Looking for their lost homes Shuffle to...
This statue of the Virgin Mary stood in the south tower of The Cathedral of the Blessed Sacrament and had been facing inside from when she was placed there and through the September 2010 earthquake. That changed on February 22 2010 at 12.51pm when Christchurch was rocked by a 6.3 magnitude earthquake. During the violent shaking motion Mary was t...
A video about the experiences of church goers after the 4 September 2010 earthquake. Many of the congregations have had to find temporary facilities after the earthquake damaged their churches. The video includes an interview with Bishop Barry Jones from the Roman Catholic Church. Jones talks about the miracle that nobody died in the earthquake.
Maybe it should be titled "Pray Here"! The old church buildings next to the Christchurch Basilica (Cathedral of the Blessed Sacrament) have been demolished and replaced with ANOTHER Wilson's Car Park. Hundreds of sites in the city where buildings have been demolished after the earthquakes have been replaced in the short term by car parks!
As a result of the 4 September 2010 Darfield earthquake and the more damaging 22 February 2011 Christchurch earthquake, considerable damage occurred to a significant number of buildings in Christchurch. The damage that occurred to the Christchurch Roman Catholic Cathedral of the Blessed Sacrament (commonly known as the Christchurch Basilica) as a result of the Canterbury earthquakes is reported, and the observed failure modes are identified. A previous strengthening intervention is outlined and the estimated capacity of the building is discussed. This strengthening was completed in 2004, and addressed the worst aspects of the building's seismic vulnerability. Urgent work was undertaken post-earthquake to secure parts of the building in order to limit damage and prevent collapse of unstable parts of the building. The approach taken for this securing is outlined, and the performance of the building and the previously installed earthquake strengthening intervention is evaluated.A key consideration throughout the project was the interaction between the structural securing requirements that were driven by the requirement to limit damage and mitigate hazards, and the heritage considerations. Lessons learnt from the strengthening that was carried out, the securing work undertaken, and the approach taken in making the building "safe" are discussed. Some conclusions are drawn with respect to the effectiveness of strengthening similar building types, and the approach taken to secure the building under active seismic conditions. AM - Accepted Manuscript
The Catholic Cathedral is classified as a category 1 listed heritage building constructed largely of unreinforced stone masonry, and was significantly damaged in the recent Canterbury earthquakes of 2010 and 2011. In the 2010 event the building presented slight to moderta damage, meanwhile in the 2011 one experienced ground shaking in excess of its capacity leading to block failures and partial collapse of parts of the building, which left the building standing but still posing a significant hazard. In this paper we discuss the approach to develop the earthquake analysis of the building by 3D numerical simulations, and the results are compared/calibrated with the observed damage of the 2010 earthquake. Very accurate records were obtained during both earthquakes due to a record station located least than 80 m of distance from the building and used in the simulations. Moreover it is included in the model the soil structure interaction because it was observed that the ground and foundation played an important role on the seismic behavior of the structure. A very good agreement was found between the real observed damage and the nonlinear dynamic simulations described trough inelastic deformation (cracking) and building´s performance.
<b>Construction and Demolition (C&D) waste contributes to over 50% of New Zealand’s overall waste. Materials such as timber, plasterboard, and concrete make up 81% of the C&D waste that goes into landfills each year. Alongside this, more than 235 heritage-listed buildings have been demolished in Christchurch since the 2011 earthquakes. This research portfolio aims to find a solution to decrease C&D waste produced by demolishing heritage buildings.</b> With the recent announcement of The Cathedral of the Blessed Sacrament’s demolition, this will be another building added to the list of lost heritage in Christchurch. This research portfolio aims to bridge the relationship between heritage and waste through the recycling and reuse of the demolished materials, exploring the idea that history and heritage are preserved through building material reuse. This research portfolio mainly focuses on reducing construction and demolition waste in New Zealand, using the design of a new Catholic Cathedral as a vessel. This thesis will challenge how the construction and design industry deals with the demolition of heritage buildings and their contribution to New Zealand’s waste. It aims to explore the idea of building material reuse not only to reduce waste but also to retain the history and heritage of the demolished building within the materials.