Search

found 6688 results

Images, eqnz.chch.2010

Red stickered door means that this pub on Madras Street is no-go due to structural damage suffered in the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.

Images, eqnz.chch.2010

Damaged Christchurch building (old Para Rubber building - see earlier photo from just after quake), partially demolished, after Sept 4th 2010 Christchurch earthquake. Has been sitting on 666 views for a while!

Research papers, The University of Auckland Library

The sequence of earthquakes that has greatly affected Christchurch and Canterbury since September 2010 has again demonstrated the need for seismic retrofit of heritage unreinforced masonry buildings. Commencing in April 2011, the damage to unreinforced stone masonry buildings in Christchurch was assessed and recorded with the primary objective being to document the seismic performance of these structures, recognising that they constitute an important component of New Zealand’s heritage architecture. A damage statistics database was compiled by combining the results of safety evaluation placarding and post-earthquake inspections, and it was determined that the damage observed was consistent with observations previously made on the seismic performance of stone masonry structures in large earthquakes. Details are also given on typical building characteristics and on failure modes observed. Suggestions on appropriate seismic retrofit and remediation techniques are presented, in relation also to strengthening interventions that are typical for similar unreinforced stone masonry structures in Europe.

Research papers, The University of Auckland Library

The 2011, 6.3 magnitude Christchurch earthquake in New Zealand caused considerable structural damage. It is believed that this event has now resulted in demolition of about 65-70% of the building stock in the Central Business District (CBD), significantly crippling economic activities in the city of Christchurch. A major concern raised from this event was adequacy of the current seismic design practice adopted for reinforced concrete walls due to their poor performance in modern buildings. The relatively short-duration earthquake motion implied that the observed wall damage occurred in a brittle manner despite adopting a ductile design philosophy. This paper presents the lessons learned from the observed wall damage in the context of current state of knowledge in the following areas: concentrating longitudinal reinforcement in wall end regions; determining wall thickness to prevent out-of-plane wall buckling; avoiding lap splices in plastic hinge zones; and quantifying minimum vertical reinforcement. http://www.2eceesistanbul.org/

Research papers, University of Canterbury Library

The Canterbury earthquake and aftershock sequence in New Zealand during 2010-2011 subjected the city’s structures to a significant accumulated cyclic demand and raised significant questions regarding the low-cycle fatigue demands imposed upon the structures. There is a significant challenge to quantify the level of cumulative demand imposed on structures and to assess the percentage of a structure's fatigue life that has been consumed as a result of this earthquake sequence. It is important to be able to quantify the cumulative demand to determine how a building will perform in a subsequent large earthquake and inform repair and re-occupancy decisions. This paper investigates the cumulative fatigue demand for a structure located within the Christchurch Central Business District (CBD). Time history analysis and equivalent cycle counting methods are applied across the Canterbury earthquake sequence, using key events from September 4th 2010 and February 22nd , 2011 main shocks. The estimate of the cumulative fatigue demand is then compared to the expected capacity of a case study reinforced concrete bridge pier, to undertake a structure-specific fatigue assessment. The analysis is undertaken to approximate the portion of the structural fatigue capacity that has been consumed, and how much residual capacity remains. Results are assessed for recordings at the four Christchurch central city strong motion recording sites installed by the GeoNet programme, to provide an estimate of variation in results. The computed cyclic demand results are compared to code-based design methods and as assessment of the inelastic displacement demand of the reinforcing steel. Results are also presented in a fragility context where a de minimis (inconsequential), irreparable damage and full fatigue fracture are defined to provide a probabilistic assessment of the fatigue damage incurred. This methodology can provide input into the overall assessment of fatigue demands and residual capacity.

Images, Alexander Turnbull Library

Cartoons about political and social issues in New Zealand and overseas. The cartoon has the words 'Tsunami Warning cancelled' in the centre. Above are the words 'The end is nigh... insurance running out! No more cover!' Below the word 'cancelled' are the words 'We have reinsurance!' Context - Civil Defence has cancelled a tsunami warning after a 7.8 magnitude earthquake struck off the Kermadec Islands this morning (7 July 2011) The tsunami image is used to illustrate the problems that could arise from lack of insurance in Christchurch. When their policies run out on 30 June Earthquake-hit Christchurch and Waimakariri councils are in danger of having no property insurance because as the CEO of Civic Assurance, which insures most councils, says, 'the company cannot buy reinsurance'. There was also a potential problem for home-owners when AMI Insurance, the largest insurer of homes in Christchurch, was threatening insolvency. However, AMI has announced that it has re-insurance cover for earthquakes and other natural disasters from tomorrow (1 July 2011) for the next year. The Government feared AMI Insurance's directors would wind up the company affecting a huge section of New Zealand's insurance market and derail the reconstruction of Christchurch, official documents confirm. AMI said it had doubled its cover for the year to June 2012 after three large quakes in the year to June 2011. (Stuff 30 June 2011) Quantity: 1 digital cartoon(s).

Images, eqnz.chch.2010

Oxford Terrace Baptist Church on the corner of Madras St and Oxford Terrace, and alongside the Central City Fire Station on Kilmore St. The organ pipes have been saved and safely removed into safe keeping by the South Island Organ Company.

Images, eqnz.chch.2010

Oxford Terrace Baptist Church on the corner of Madras St and Oxford Terrace, and alongside the Central City Fire Station on Kilmore St.