A year after the first earthquake on 4 September 2010, aftershocks continue to be felt in Canterbury, and they're not always seismic ones. When buildings collapse or are cordoned off, or even just closed for repairs - what happens to the lives and livelihoods of those who used to fill them with noise and energy? Kris Vavasour returns to Lyttelton to catch up with performers and friends, to hear about life in an altered landscape.
One landscape colour digital photograph taken on 19 November 2011 showing earthquake repairs being undertaken to the Irish Pub on the south side of London Street. The Lyttelton streetscape has changed dramatically from its pre-earthquake appearance and will continue to change as new buildings are erected on empty sections. In this photograph Lo...
The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.
The Earthquake Commission has settled with a Christchurch homeowner, just days before their test case was due to be heard at the High Court. Jamie Gibling used his KiwiSaver to buy his first family home in New Brighton after the quakes, believing it had been properly repaired. He later learned the repairs were botched and would cost $300,000 to fix. His "onsold" test case was supposed to be heard on Monday to clarify who was liable. But today EQC announced it had reached a settlement with the family and that agreement would provide a framework for the 54 other claimants also with Shine Lawyers. Finance and EQC Minister Grant Robertson last week announced an "onsold" settlement kitty of $300 million for the next 12 months but legal experts working with claimants have told Checkpoint it could cost taxpayers much much more. EQC's Deputy Chief Executive is Renee Walker. On Thursday she came into the studio and Lisa Owen asked her if the Giblings got what they asked for and if the 54 others who signed up to the class action would get the same.
Shows Christchurch's Anglican cathedral receiving extensive treatment including blood, ambulances, scaffold and signs reading 'save!' In the background Christchurch's Catholic Cathedral says it wants its share of attention as well. Context: The focus of repairing the Christchurch Anglican cathedral appeared to draw focus and resources from the equally historic and damaged Catholic Cathedral. Quantity: 1 digital cartoon(s).
One portrait colour digital photograph taken on 19 November 2011 showing the flyers in the window of the Lyttelton Information Centre on Oxford Street. The building was closed from 22 February 2011 until April 2013 due to the danger posed by the neighbouring building and then while repairs were scheduled and carried out. The flyers provided a sn...
One landscape colour digital photograph taken on 26 May 2013 on the corner of Norwich Quay and Canterbury Street, Lyttelton. The photograph shows the sites of the Royal Hotel, Shadbolt House, and the Lyttelton Hotel along Norwich Quay. The Wunderbar and the repair and strengthening work underway on the Lyttelton Working Mens Club/The Loons are v...
The ticket office at Lancaster Park (AMI Stadium), not used since the February 2011 earthquake. Windows broken and door boarded up. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.
Only two of 20 houses left in the Rawhiti Earthquake Village. This from the sign on perimeter fence: "Since 2011, Rawhiti Domain has been used to provide temporary accommodation for those affected by the Canterbury earthquakes. Over 200 households have used the 20 houses while their own homes have been repaired or rebuilt. The demand for acco...
The 2010–2011 Canterbury earthquakes, which involved widespread damage during the February 2011 event and ongoing aftershocks near the Christchurch Central Business District, left this community with more than $NZD 40 billion in losses (~20 % GDP), demolition of approximately 60 % of multi-storey concrete buildings (3 storeys and up), and closure of the core business district for over 2 years. The aftermath of the earthquake sequence has revealed unique issues and complexities for the owners of commercial and multi-storey residential buildings in relation to unexpected technical, legal, and financial challenges when making decisions regarding the future of their buildings impacted by the earthquakes. The paper presents a framework to understand the factors influencing post-earthquake decisions (repair or demolish) on multi-storey concrete buildings in Christchurch. The study, conducted in 2014, includes in-depth investigations on 15 case-study buildings using 27 semi-structured interviews with various property owners, property managers, insurers, engineers, and government authorities in New Zealand. The interviews revealed insights regarding the multitude of factors influencing post-earthquake decisions and losses. As expected, the level of damage and repairability (cost to repair) generally dictated the course of action. There is strong evidence, however, that other variables have significantly influenced the decision on a number of buildings, such as insurance, business strategies, perception of risks, building regulations (and compliance costs), and government decisions. The decision-making process for each building is complex and unique, not solely driven by structural damage. Furthermore, the findings have put the spotlight on insurance policy wordings and the paradoxical effect of insurance on the recovery of Christchurch, leading to other challenges and issues going forward.
Minister for Christchurch Recovery, Gerry Brownlee drives a huge tractor among debris that spells out 'Due Process' and says 'In order to get Christchurch back on its feet again we have to bring parliament to its knees. Context - The minister says he is happy with the speed of the work being done, as he wants tomake sure those involved in the rebuild portion of the recovery effort are well prepared. The bill establishes the Canterbury Earthquake Recovery Authority (Cera) and empowers it to lead reconstruction efforts in Christchurch. It gives Cera specific powers to get information from any source, to requisition and build on land and to carry out demolitions. It can also take over local authorities if they are not working effectively on recovery work. Quantity: 1 digital cartoon(s).
The damaged Cranmer Centre on the corner of Montreal and Armagh Streets shortly after the 22 February 2011 earthquake. The east wall of the building has crumbled onto the street and a man in a hard hat and high-visibility vest is directing people around it. There is scaffolding on the south side of the building from repair works after the 4 September 2010 earthquake. The gable in the background has also collapsed.
The Aromaunga Baxters Flowers nursery in Heathcote, Christchurch sits right above the point where the earthquake struck on 22 February 2011. The greenhouses on the steep slopes of the Port Hills, as well as a big old villa and other brick buildings were badly damaged. Ten years on co-owner John Baxter says the earthquake damage is still being repaired, but sales have been boosted by a lack of imported flowers due to Covid-19 restrictions.
A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".
A video of an interview with Tracey McKeefrey about her leaky house. McKeefrey and her family have been living in the house since the 22 February 2011 earthquake, despite the fact that over 300 litres of water comes through the house every wet day. The property has been classified as TC3 but the family still does not know if it will be repaired or rebuilt.
A digitally manipulated image of furniture and machinery. The photographer comments, "This furniture restoration company got caught in the middle of the Christchurch earthquake and lost a whole wall. After constant exposure to the elements everything now needs a bit of restoration. They are now working in a different part of Christchurch, but their past can still be seen".
A photograph of Marie Hudson working on Crack'd for Christchurch's armchair artwork.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."
A photograph of Helen Campbell working on Crack'd for Christchurch's armchair artwork.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."
A photograph of Helen Campbell and Marie Hudson working on Crack'd for Christchurch's armchair artwork.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."
A photograph of Crack'd for Christchurch's partially-completed mosaic on their armchair.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."
A red sticker on the door of a damaged building in North New Brighton. The photographer comments, "A year after the earthquake in Christchurch a lot of buildings outside of the CBD are covered in cracks and beyond repair. These will slowly be demolished, but until then the buildings will be protected by a movable barrier and a red sticker".
A photograph of Helen Campbell working on Crack'd for Christchurch's armchair artwork.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."
A video about field trials conducted by the Department of Building and Housing at Queen Elizabeth II Park in Christchurch. Fifty kilograms of explosives are being used to simulate a magnitude-4 earthquake at a distance of 10 kilometres. The aim of the trials is to test soil-strengthening techniques that could be used to repair damaged land in Christchurch.
A view looking south down Durham Street during the aftermath of the 22 February 2011 earthquake. On the left are the ruins of the historic stone Provincial Council Legislative Chamber. The building's roof and walls have already collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake. An aftershock has caused masonry to dislodge from the building, sending dust into the air.
A photograph of Crack'd for Christchurch's partially-completed mosaic on their armchair.Crack'd for Christchurch comments, "Slow progress. Sometimes we thought we'd never get her finished. We were all battling our own earthquake consequences: losing homes and jobs, battling with insurers, illnesses and repairs. It was a long winter. But the conversation, food, laughter, and company were wonderful. An unforgettable experience."
Photograph captioned by Fairfax, "City Care workers. From left, Donny Haenga, Mafutga and David Henry enjoying a BBQ put on by City Care for their staff. The trio, from Wellington have work over 100 hours between them since Tuesday when they arrived. 35 specialists from Tauranga, Wellington, Dunedin and Timaru have joined the Christchurch staff with trucks and equipment from around NZ to help with the quake repairs".
A view looking south down Durham Street during the aftermath of the 22 February 2011 earthquake. On the left are the ruins of the historic stone Provincial Council Legislative Chamber. The building's roof and walls have already collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake. An aftershock has caused masonry to dislodge from the building, sending dust into the air.
Police prosecutor jailed for dealing drugs;Sharebrokers getting late rush of MRP investors;Pressure mounts on MP Aaron Gilmore;Police rule out anyone else being at risk;Mother of electrocuted son is pleased that electricians been named and shamed;NZ Post signals to Government it will need to invest in KiwiBank in two years;Judge says young killer could have made something of himself;Elderly in Christchurch say they are low on priority list for earthquake repairs and payouts.
The temporary (10 years?) and cheap ($4-6 million) Anglican Cathedral being built a few hundred meters away from the old stone structure that was the centre of Christchurch. Both buildings (the original and this) have caused a lot of controversy, many wanting the old stone one to be repaired (the church want to demolish it), and this as a waste ...
Relates to the three new categories for residential foundation design that have been developed and will be required for repairing and rebuilding homes in Canterbury following the earthquakes of 2010 and 2011. The 'zones' referred to in the cartoon are the colours designated to different degrees of damage to particular areas or buildings in Christchurch after the earthquakes. Quantity: 1 digital cartoon(s).