A photograph of the remains of a sign on the side of the badly-damaged McKenzie & Willis building on the corner of Tuam Street and High Street. The sign used to read, 'Luxury furniture concepts'.
An aerial photograph of New Brighton Road, where the traffic has been diverted across the front yards of several red-zoned houses.
Transcript of Robyn Anderson's earthquake story, captured by the UC QuakeBox project.
Transcript of Sharon Heads's earthquake story, captured by the UC QuakeBox project.
Transcript of participant number LY960's earthquake story, captured by the UC QuakeBox project.
The "Lyttelton Harbour Review" newsletter for 24 June 2013, produced by the Lyttelton Harbour Information Centre.
A copy of the CanCERN online newsletter published on 15 February 2013
A copy of the CanCERN online newsletter published on 1 February 2013
A photograph of the earthquake damage to the porch of Robin Duff's house at 386 Oxford Terrace. The top half of the far wall has broken loose and is hanging at an angle.
20130808_2293_1D3-40 New Brighton bridge Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage. #4074
The Canterbury earthquakes, which started with the 7.1 magnitude event on September 4, 2010, caused significant damage in the region. The September 4 earthquakes brought substantial damage to land, buildings, and infrastructure, while the 6.3 magnitude earthquake on February 22, 2011 (and its subsequent aftershocks), brought even greater property damage, but also significant loss of life in addition to the region. Thousands were injured, and 185 persons died. A national State of Emergency was declared and remained in effect until April 30, 2011. A significant number of people required immediate assistance and support to deal with loss, injury, trauma experiences, and property damages. Many had to find alternate accommodation as their houses were too damaged to stay in. Of those affected, many were already vulnerable, and others had been too traumatized by the events to effectively deal with the challenges they were faced with. A number of human service organizations in the region, from both government and non-government sectors, joined forces to be able to more effectively and efficiently help those in need. This was the start of what would become known as the Earthquake Support Coordination Service. The aim of this report is to present an evaluation of the Earthquake Support Coordination Service and its collaborative organization, based on documentation and interviews with key stakeholders of the service. The aim is also to evaluate the service based on perspectives gathered among the clients as well as the coordinators working in the service. The final aim is to offer a reflection on the service model, and on what factors enabled the service, as well as recommendations regarding aspects of the service which may require review, and aspects which may be useful in other contexts.
A digital copy of a painting by Julia Holden. The painting is of Lichfield Street, looking east from the intersection of Colombo Street. The road has been fenced off and there are damaged buildings in the background.
USAR codes and a yellow sticker can be seen on the doors of a damaged building. The yellow sticker was part of a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.
Damage to the north side of the cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral. Weeds can be seen growing around the war memorial in Cathedral Square.
A photograph of building rubble on a demolition site between St Asaph Street and Tuam Street. The old Post Office building can be seen in the distance to the left and on the right are badly-damaged High Street buildings.
A view down High Street, looking north-west through the cordon fence near the Tuam Street intersection. On the left a line of shipping containers support the facade of a damaged building. Rubble from demolished buildings can be seen in the distance.
A view down High Street, looking north-west through the cordon fence near the Tuam Street intersection. On the left a line of shipping containers support the facade of a damaged building. Rubble from demolished buildings can be seen in the distance.
A photograph of damaged buildings and empty site on the corner of Lichfield Street and Madras Street. A mural commissioned by Gap Filler titled 'Knit Happens' has been painted on the brick wall in the corner of the remaining buildings.
A photograph looking east down Tuam Street. The old Post Office building (now C1 Espresso) can be seen in the distance on the left. On the right is the badly-damaged McKenzie & Willis building.
A photograph of a cleared building site on High Street. Three shipping containers are stacked against the remaining facade of the Excelsior Hotel building on the left. The badly-damaged McKenzie & Lewis building on Tuam Street can be seen in the distance.
A photograph of damaged buildings near the corner of Lichfield Street and Madras Street. A mural commissioned by Gap Filler titled 'Knit Happens' has been painted on the brick wall in the corner of the remaining buildings.
It's been revealed earthquake damage was only one factor considered by the Ministry of Education when it decided to close schools in Christchurch and that it was just as much to do with reducing the overall number of schools in the city.
Transcript of Kim McDiarmid's earthquake story, captured by the UC QuakeBox project.
Summary of oral history interview with Caroline about her experiences of the Canterbury earthquakes.
The "Lyttelton Harbour Review" newsletter for 17 February 2013, produced by the Lyttelton Harbour Information Centre.
20130312_4425_1D3-150 South New Brighton boardwalk track [Explored] Damaged in the earthquakes, now with more bends and not level as it was before. Selected for Explore. #306 12/05/13 #3402
The Canterbury Earthquakes of 2010-2011, in particular the 4th September 2010 Darfield earthquake and the 22nd February 2011 Christchurch earthquake, produced severe and widespread liquefaction in Christchurch and surrounding areas. The scale of the liquefaction was unprecedented, and caused extensive damage to a variety of man-made structures, including residential houses. Around 20,000 residential houses suffered serious damage as a direct result of the effects of liquefaction, and this resulted in approximately 7000 houses in the worst-hit areas being abandoned. Despite the good performance of light timber-framed houses under the inertial loads of the earthquake, these structures could not withstand the large loads and deformations associated with liquefaction, resulting in significant damage. The key structural component of houses subjected to liquefaction effects was found to be their foundations, as these are in direct contact with the ground. The performance of house foundations directly influenced the performance of the structure as a whole. Because of this, and due to the lack of research in this area, it was decided to investigate the performance of houses and in particular their foundations when subjected to the effects of liquefaction. The data from the inspections of approximately 500 houses conducted by a University of Canterbury summer research team following the 4th September 2010 earthquake in the worst-hit areas of Christchurch were analysed to determine the general performance of residential houses when subjected to high liquefaction loads. This was followed by the detailed inspection of around 170 houses with four different foundation types common to Christchurch and New Zealand: Concrete perimeter with short piers constructed to NZS3604, concrete slab-on-grade also to NZS3604, RibRaft slabs designed by Firth Industries and driven pile foundations. With a focus on foundations, floor levels and slopes were measured, and the damage to all areas of the house and property were recorded. Seven invasive inspections were also conducted on houses being demolished, to examine in more detail the deformation modes and the causes of damage in severely affected houses. The simplified modelling of concrete perimeter sections subjected to a variety of liquefaction-related scenarios was also performed, to examine the comparative performance of foundations built in different periods, and the loads generated under various bearing loss and lateral spreading cases. It was found that the level of foundation damage is directly related to the level of liquefaction experienced, and that foundation damage and liquefaction severity in turn influence the performance of the superstructure. Concrete perimeter foundations were found to have performed most poorly, suffering high local floor slopes and being likely to require foundation repairs even when liquefaction was low enough that no surface ejecta was seen. This was due to their weak, flexible foundation structure, which cannot withstand liquefaction loads without deforming. The vulnerability of concrete perimeter foundations was confirmed through modelling. Slab-on-grade foundations performed better, and were unlikely to require repairs at low levels of liquefaction. Ribraft and piled foundations performed the best, with repairs unlikely up to moderate levels of liquefaction. However, all foundation types were susceptible to significant damage at higher levels of liquefaction, with maximum differential settlements of 474mm, 202mm, 182mm and 250mm found for concrete perimeter, slab-on-grade, ribraft and piled foundations respectively when subjected to significant lateral spreading, the most severe loading scenario caused by liquefaction. It was found through the analysis of the data that the type of exterior wall cladding, either heavy or light, and the number of storeys, did not affect the performance of foundations. This was also shown through modelling for concrete perimeter foundations, and is due to the increased foundation strengths provided for heavily cladded and two-storey houses. Heavy roof claddings were found to increase the demands on foundations, worsening their performance. Pre-1930 concrete perimeter foundations were also found to be very vulnerable to damage under liquefaction loads, due to their weak and brittle construction.
The Mw 6.2 February 22nd 2011 Christchurch earthquake (and others in the 2010-2011 Canterbury sequence) provided a unique opportunity to study the devastating effects of earthquakes first-hand and learn from them for future engineering applications. All major events in the Canterbury earthquake sequence caused widespread liquefaction throughout Christchurch’s eastern suburbs, particularly extensive and severe during the February 22nd event. Along large stretches of the Avon River banks (and to a lesser extent along the Heathcote) significant lateral spreading occurred, affecting bridges and the infrastructure they support. The first stage of this research involved conducting detailed field reconnaissance to document liquefaction and lateral spreading-induced damage to several case study bridges along the Avon River. The case study bridges cover a range of ages and construction types but all are reinforced concrete structures which have relatively short, stiff decks. These factors combined led to a characteristic deformation mechanism involving deck-pinning and abutment back-rotation with consequent damage to the abutment piles and slumping of the approaches. The second stage of the research involved using pseudo-static analysis, a simplified seismic modelling tool, to analyse two of the bridges. An advantage of pseudo-static analysis over more complicated modelling methods is that it uses conventional geotechnical data in its inputs, such as SPT blowcount and CPT cone resistance and local friction. Pseudo-static analysis can also be applied without excessive computational power or specialised knowledge, yet it has been shown to capture the basic mechanisms of pile behaviour. Single pile and whole bridge models were constructed for each bridge, and both cyclic and lateral spreading phases of loading were investigated. Parametric studies were carried out which varied the values of key parameters to identify their influence on pile response, and computed displacements and damages were compared with observations made in the field. It was shown that pseudo-static analysis was able to capture the characteristic damage mechanisms observed in the field, however the treatment of key parameters affecting pile response is of primary importance. Recommendations were made concerning the treatment of these governing parameters controlling pile response. In this way the future application of pseudo-static analysis as a tool for analysing and designing bridge pile foundations in liquefying and laterally spreading soils is enhanced.
A digital copy of a painting by Julia Holden. The painting is of an excavator and a large mound of building rubble. In the background is the badly-damaged Farmers car park building on Gloucester Street.
A digital copy of a painting by Julia Holden. The painting is of the badly-damaged ChristChurch Cathedral, behind a temporary hoarding. The hoarding has been constructed on part of the footpath around Cathedral Square.