Search

found 722 results

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding. Builders repair the master bedroom where a large brick chimney came through the room narrowly missing the Cotterills and totally obliterating their bed".

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Crack repairs on the Rendezvous Hotel in Gloucester Street. Cracks have been injected with epoxy resin using syringes. The epoxy resin leaves a peak around each hole which will be ground down to a smooth surface. The wall will then be repainted. This process actually makes the wall stronger than it was originally.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding. Builders repair the master bedroom where a large brick chimney came through the room narrowly missing the Cotterills and totally obliterating their bed".

Audio, Radio New Zealand

A new study suggests young Maori wahine are being let down by the health system, because of inadequate information to help them find a midwife; A South Island marae has accepted a donation to repair its wharekai damaged during the 2011 Canterbury earthquakes; About 750 Maori and Pasifika Auckland tertiary students will celebrate their academic achievement this week.

Images, eqnz.chch.2010

Further damage to the bank following the two quakes on 23/12/11. The sewer line broke here and was repaired (patched) by council staff on Christmas Eve. It is hard to beleve that this rock wall was level with the land here, before any of the quakes.

Research papers, University of Canterbury Library

This paper presents the probabilistic seismic performance and loss assessment of an actual bridge– foundation–soil system, the Fitzgerald Avenue twin bridges in Christchurch, New Zealand. A two-dimensional finite element model of the longitudinal direction of the system is modelled using advanced soil and structural constitutive models. Ground motions at multiple levels of intensity are selected based on the seismic hazard deaggregation at the site. Based on rigorous examination of several deterministic analyses, engineering demand parameters (EDP’s), which capture the global and local demand, and consequent damage to the bridge and foundation are determined. A probabilistic seismic loss assessment of the structure considering both direct repair and loss of functionality consequences was performed to holistically assess the seismi risk of the system. It was found that the non-horizontal stratification of the soils, liquefaction, and soil–structure interaction had pronounced effects on the seismic demand distribution of the bridge components, of which the north abutment piles and central pier were critical in the systems seismic performance. The consequences due to loss of functionality of the bridge during repair were significantly larger than the direct repair costs, with over a 2% in 50 year probability of the total loss exceeding twice the book-value of the structure.

Research papers, University of Canterbury Library

Asset management in power systems is exercised to improve network reliability to provide confidence and security for customers and asset owners. While there are well-established reliability metrics that are used to measure and manage business-as-usual disruptions, an increasing appreciation of the consequences of low-probability high-impact events means that resilience is increasingly being factored into asset management in order to provide robustness and redundancy to components and wider networks. This is particularly important for electricity systems, given that a range of other infrastructure lifelines depend upon their operation. The 2010-2011 Canterbury Earthquake Sequence provides valuable insights into electricity system criticality and resilience in the face of severe earthquake impacts. While above-ground assets are relatively easy to monitor and repair, underground assets such as cables emplaced across wide areas in the distribution network are difficult to monitor, identify faults on, and repair. This study has characterised in detail the impacts to buried electricity cables in Christchurch resulting from seismically-induced ground deformation caused primarily by liquefaction and lateral spread. Primary modes of failure include cable bending, stretching, insulation damage, joint braking and, being pulled off other equipment such as substation connections. Performance and repair data have been compiled into a detailed geospatial database, which in combination with spatial models of peak ground acceleration, peak ground velocity and ground deformation, will be used to establish rigorous relationships between seismicity and performance. These metrics will be used to inform asset owners of network performance in future earthquakes, further assess component criticality, and provide resilience metrics.

Images, Alexander Turnbull Library

The cartoon shows an enormous ball of red tape and all around frustrated workers carry away their ladders and tools. Context - Three months after a quake that scored a direct hit under Christchurch, many residents are struggling with mountains of paperwork required to get their homes repaired and rebuilt. Reference numbers, codes and Pin numbers permeate our daily living now as we deal with the aftermath of two major earthquakes in six months. People feel they are lucky that they have the EQC pot to draw on, but there are a lot of complexities, anomalies and frustrations. (BBC News 21 May 2011) Colour and black and white versions available Quantity: 2 digital cartoon(s).

Videos, UC QuakeStudies

A video about the discovery of a historic tramline on North Avon Road. The video includes an interview with Brent Leersynder, a site engineer for SCIRT, and Steve Timpson, site foreman for SCIRT. The SCIRT team found the tramline while repairing the damaged wastewater system under North Avon Road in May.

Other, National Library of New Zealand

An intermittent collaboration between the Centre of Contemporary Art and a series of local artists looking to present new work which explores the realities of the post-earthquake cultural landscape in Christchurch. The artworks by Ed Lust, Sam Eng, and Robyn Wester each utilise the empty window space of the window and carport of the damaged COCA building which is awaiting repair.

Images, UC QuakeStudies

A view looking south down Durham Street. Two fire engines are driving north, and a pair of construction workers are walking up the road. Behind them is the damaged Provincial Council Legislative Chambers. The building's walls and roof have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

Glass panels with brass surrounds, stacked inside a building. The photographer comments, "These were brass dividers that were brought inside the building two years ago after the Christchurch earthquake. They have been sitting there abandoned in a restaurant that will be either repaired and reopened at a later date or demolished like the many others of its kind".

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.

Audio, Radio New Zealand

An elderly Christchurch couple are crying foul over EQC's site visit policy under alert level two. EQC says the measures, outlined in emails to clients, are crucial for staff and customer safety. But John and Frances van Petegem, who have been waiting years to have botched earthquake repairs put right, say EQC's rules are causing further delays and stress. Nick Truebridge has the story.

Images, Canterbury Museum

One landscape colour digital photograph taken on 28 April 2012 looking south from Cunningham Terrace, Lyttelton. The foreground of the photograph shows a blue temporary water supply pipe and markings spray painted on the footpath in preparation for repair work. The fence has a home made sign painted with the Fulton Hogan (FH) logo satirized to ...

Images, Alexander Turnbull Library

A woman says to a builder 'Christchurch people will really appreciate your help to rebuild - What you construct looks like it's already been hit by an earthquake'. They are standing in front of a very shoddily-built cottage and the garden is festooned with litter. Context - After the Christchurch earthquakes there is a huge emphasis on fast rebuilding with the potential for below standard results.. Quantity: 1 digital cartoon(s).

Articles, UC QuakeStudies

A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.

Images, Canterbury Museum

One landscape colour digital photograph taken on 19 November 2011 showing the alleyway next to 29 London Street. These steps provided access to the Wunderbar and the Monsta Bar (closed). Visible to the left is the Lyttelton Coffee Company building being repaired. Prior earthquake strengthening enabled the Lyttelton Coffee Company to undertake w...

Audio, Radio New Zealand

A report commissioned by the Ministry of Health has found Canterbury residents are unlikely to suffer any health risks from asbestos exposure during the canterbury earthquake repairs. The Report is a review of Scientific Evidence of Non Occuptional Risks - and was convened by the Royal Society and the Prime Minister's Chief Science Advisor. Sir David Skegg, president of the Royal Society of New Zealand and Dr Alistair Humphrey, Canterbury Medical Officer of Health.

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.

Audio, Radio New Zealand

Many Christchurch trades people are refusing to carry out quake repairs unless the homeowner agrees to pay the bill, saying it takes too long to get the money out of the Earthquake Commission. Some contractors say they still haven't been paid for jobs done after the quake in September and the amount of debt some businesses are carrying are putting them in jeopardy.

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.

Images, Canterbury Museum

One landscape colour digital photograph taken on 28 April 2012 looking south from Cunningham Terrace, Lyttelton. The photograph shows a homemade sign with the text "How Happy are Those Whose Walls Already Rise. Virgil" . The sign is attached to a temporary safety fence on top of a retaining wall awaiting repair. Quoted author The retaining wall...