Pws-2011-07-10-dsc05009
Pws-2011-07-10-dsc05014
Pws-2011-07-10-dsc05000
Pws-2011-07-10-dsc04998
Pws-2011-07-10-dsc04995
Pws-2011-07-10-dsc05015
Pws-2011-07-10-dsc05013
Pws-2011-07-10-dsc05002
Pws-2011-07-10-dsc05005
Pws-2011-07-10-dsc05004
Pws-2011-07-10-dsc05003
Pws-2011-07-10-dsc04988
Pws-2011-07-10-dsc04992
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Public Library viewed from near the Bridge of Rememberance,
A photograph of the badly-damaged ChristChurch Cathedral.
A photograph of a postcard depicting Julia Holden's painting 'ChristChurch Cathedral'.
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand
Canterbury Earthquake 04/09/10 Christchurch New Zealand