Search

found 478 results

Images, UC QuakeStudies

The front of Christ Church Cathedral. The upper part of the front wall has crumbled leaving the inside space exposed. Steel bracing has been placed against it to limit further damage. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral.

Images, UC QuakeStudies

Members of the public take photographs of the damaged Christ Church Cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral. The tower and the front wall of the building have partially collapsed. Steel bracing has been added to the front wall for support.

Images, UC QuakeStudies

Members of the public take photographs of the damaged Christ Church Cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral. The tower and the front wall of the building have partially collapsed. Steel bracing has been added to the front wall for support.

Images, UC QuakeStudies

Members of the public take photographs of the damaged Christ Church Cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral. The tower and the front wall of the building have partially collapsed. Steel bracing has been added to the front wall for support.

Images, UC QuakeStudies

Members of the public take photographs of the damaged Christ Church Cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral. The tower and the front wall of the building have partially collapsed. Steel bracing has been added to the front wall for support.

Images, UC QuakeStudies

The front of Christ Church Cathedral showing its broken tower. Bracing has been placed on the front wall to limit further damage. Security fences have been placed around the cathedral to restrict access. The Wizard of Christchurch talks to members of the public. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look.

Images, UC QuakeStudies

The front of Christ Church Cathedral showing its broken tower. Bracing has been placed on the front wall to limit further damage. Security fences have been placed around the cathedral to restrict access. The Wizard of Christchurch talks to members of the public. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look.

Audio, Radio New Zealand

Sam Harvey says that holding on to grace is one of the things that keeps him striving towards his calling to help others. He's a young pastor of the Beach Campus of Grace Vineyard Church in Christchurch, and moved to the city on the eve of the first earthquake. Sonia Sly finds out what it takes to adhere to the faith during difficult times, and candidly asks about God's voice, New Zealand's attitude to Christianity, and the process of healing through exorcism.

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "The intersection of Colombo and Gloucester Streets, looking south down Colombo Street towards Cathedral Square. The soldiers are staffing the cordon as this is the main way through from one half of the central city red zone to the other half, which is now bisected by Gloucester Street".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that to".

Images, UC QuakeStudies

A small wooden cross is inserted between stones laid out in the shape of a large cross. The photographer comments, "This is an Earthquake Memorial on Manchester Street, Christchurch, New Zealand. This message is on the tree next to the memorial: 'Earthquake Memorial. 185 people died as a result of the 22 February 2011 earthquake. 185 precious lives are remembered here, with 185 pieces of Halswell stone recovered from St Luke's Church, damaged beyond repair on that day. May they rest in peace. St Luke's in the City'".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. First few modules in place".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Modules ready to be pinned together".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Back on the new technical design for the Cathedral Rose Window".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Front on the new technical design for the Cathedral Rose Window".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Side of the new technical design for the Cathedral Rose Window".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. The new base, which breaks into two sections each 48x70 studs".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. The new base, which breaks into two sections each 48x70 studs".

Research papers, The University of Auckland Library

As part of the ‘Project Masonry’ Recovery Project funded by the New Zealand Natural Hazards Research Platform, commencing in March 2011, an international team of researchers was deployed to document and interpret the observed earthquake damage to masonry buildings and to churches as a result of the 22nd February 2011 Christchurch earthquake. The study focused on investigating commonly encountered failure patterns and collapse mechanisms. A brief summary of activities undertaken is presented, detailing the observations that were made on the performance of and the deficiencies that contributed to the damage to approximately 650 inspected unreinforced clay brick masonry (URM) buildings, to 90 unreinforced stone masonry buildings, to 342 reinforced concrete masonry (RCM) buildings, to 112 churches in the Canterbury region, and to just under 1100 residential dwellings having external masonry veneer cladding. Also, details are provided of retrofit techniques that were implemented within relevant Christchurch URM buildings prior to the 22nd February earthquake. In addition to presenting a summary of Project Masonry, the broader research activity at the University of Auckland pertaining to the seismic assessment and improvement of unreinforced masonry buildings is outlined. The purpose of this outline is to provide an overview and bibliography of published literature and to communicate on-going research activity that has not yet been reported in a complete form. http://sesoc.org.nz/conference/programme.pdf

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Here you can see a couple of aspects of how the model is put together. The technique used proved - from what I tried - to be the best and strongest way to do it".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Here you can see a couple of aspects of how the model is put together. The technique used proved - from what I tried - to be the best and strongest way to do it".

Images, UC QuakeStudies

A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Here you can see a couple of aspects of how the model is put together. The technique used proved - from what I tried - to be the best and strongest way to do it".

Research papers, The University of Auckland Library

Following the magnitude 6.3 aftershock in Christchurch, New Zealand, on 22 February 2011, a number of researchers were sent to Christchurch as part of the New Zealand Natural Hazard Research Platform funded “Project Masonry” Recovery Project. Their goal was to document and interpret the damage to the masonry buildings and churches in the region. Approximately 650 unreinforced and retrofitted clay brick masonry buildings in the Christchurch area were surveyed for commonly occurring failure patterns and collapse mechanisms. The entire building stock of Christchurch, and in particular the unreinforced masonry building stock, is similar to that in the rest of New Zealand, Australia, and abroad, so the observations made here are relevant for the entire world.

Research papers, The University of Auckland Library

Following the Christchurch earthquake of 22 February 2011 a number of researchers were sent to Christchurch, New Zealand to document the damage to masonry buildings as part of “Project Masonry”. Coordinated by the Universities of Auckland and Adelaide, researchers came from Australia, New Zealand, Canada, Italy, Portugal and the US. The types of masonry investigated were unreinforced clay brick masonry, unreinforced stone masonry, reinforced concrete masonry, residential masonry veneer and churches; masonry infill was not part of this study. This paper focuses on the progress of the unreinforced masonry (URM) component of Project Masonry. To date the research team has completed raw data collection on over 600 URM buildings in the Christchurch area. The results from this study will be extremely relevant to Australian cities since URM buildings in New Zealand are similar to those in Australia.

Research papers, Lincoln University

The 2010 and 2011 earthquakes of Canterbury have had a serious and ongoing effect on Maori in the city (Lambert, Mark-Shadbolt, Ataria, & Black, 2012). Many people had to rely on themselves, their neighbours and their whanau for an extended period in 2011, and some are still required to organise and coordinate various activities such as schooling, health care, work and community activities such as church, sports and recreation in a city beset by ongoing disruption and distress. Throughout the phases of response and recovery, issues of leadership have been implicitly and explicitly woven through both formal and informal investigations and debates. This paper presents the results of a small sample of initial interviews of Maori undertaken in the response and early recovery period of the disaster and discusses some of the implications for Maori urban communities.

Images, Alexander Turnbull Library

Refers to the controversy over the decision to demolish the Christchurch Cathedral which was severely damaged in the earthquakes of 2010 and 2011. The Anglican Bishop of Christchurch Victoria Mathews says the decision to demolish the cathedral was reached through prayer, great deliberation and with the utmost concern for safety. The Bishop says a number of options were considered before deciding to bring the walls down but the turning point was 23 December 2011, when a series of strong quakes rocked the city. At that stage the Canterbury Earthquake Authority approached the church. "CERA told us that our plans for making safe and retrieving, and then stepping back and making further decisions were no longer adequate." Christchurch City council announced their support on Twitter this afternoon (17 May 2012) - tweeting an endorsement to an immediate pause on demolition of the Cathedral to enable deeper and more open consideration of options. Quantity: 1 digital cartoon(s).