Search

found 1493 results

Images, UC QuakeStudies

A photograph submitted by Francis Vallance to the QuakeStories website. The description reads, "The gate of the Convent of Mercy, Lyttelton. The convent was destroyed in the September 2010 earthquake as this earlier image shows".

Images, UC QuakeStudies

A photograph of a kitchen with food and drinks for the emergency management personnel at a temporary Civil Defence headquarters. The headquarters was set up at the Mainland Foundation Ballpark after the 4 September 2010 earthquake.

Images, eqnz.chch.2010

Aftermath of September 4th Earthquake in Canterbury. Shops on Colombo Street in Christchurch. The initial 7.1 quake has been followed by around 1590 aftershocks recorded to date - causing further damage to already weakened structures.

Images, eqnz.chch.2010

The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. Note: these photos were taken on a cellphone; mind the quality.

Images, eqnz.chch.2010

The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. Note: these photos were taken on a cellphone; mind the quality.

Images, eqnz.chch.2010

The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. Note: these photos were taken on a cellphone; mind the quality.

Images, eqnz.chch.2010

The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. Note: these photos were taken on a cellphone; mind the quality.

Images, eqnz.chch.2010

The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. Note: these photos were taken on a cellphone; mind the quality.

Articles, UC QuakeStudies

A plan which identifies items that will define value for the programme of work and explain processes that will measure the achievement of value outcomes. The first version of this plan was produced on 6 September 2011.