Search

found 12544 results

Videos, UC QuakeStudies

A video of an interview with Zac Cassels, the co-owner of the Cassels & Sons Brewery bar, about the preparations for the bar's opening. The bar is to open in a historic building on Madras Street, despite CERA's plans to demolish the building and build a stadium.

Images, UC QuakeStudies

St Luke's church on the corner of Manchester and Kilmore Streets. Tape and fencing have been placed around the building to keep people away. There is damage to the top of the gable, and tarpaulins covering the hole to prevent weather damage to the inside of the building.

Images, UC QuakeStudies

The Oxford Terrace Baptist Church with cracks on the front facade. Bracing has been placed under the roof and at the front of the church to support the building and limit further damage from aftershocks. A cordon has been made around the building with fencing and road cones.

Images, UC QuakeStudies

A photograph of Pretty Things on Colombo Street, with damage to the front wall, and road cones, tape and fencing around the building. A red sticker can be seen on the front door, indicating that the building is unsafe to enter.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Cranmer Courts on the corner of Montreal and Kilmore Streets. A large section of the building has crumbled, masonry spilling onto the footpath below. Wire fencing has been placed around the building as a cordon.

Images, UC QuakeStudies

A photograph of the earthquake damage to The Painted Room on Colombo Street. The roof has collapsed into the building, damaging the front wall and breaking the glass windows. Wire fencing and police tape have been placed around the building as a cordon.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Teams of building inspectors gathered at the Linwood Service Centre before heading into the eastern suburbs en masse. Gary Marshall, left, building inspector from Napier works at a property on Dallington Terrace".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Teams of building inspectors gathered at the Linwood Service Centre before heading into the eastern suburbs en masse. Gary Marshall, left, building inspector from Napier works at a property on Dallington Terrace".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Teams of building inspectors gathered at the Linwood Service Centre before heading into the eastern suburbs en masse. Gary Marshall, left, building inspector from Napier works at a property on Dallington Terrace".

Images, UC QuakeStudies

A photograph of the McKenzie & Willis Building on the corner of High and Tuam Streets. The right side of the building has collapsed and steel bracing is being used to hold up the rest. Large piles of rubble and shipping containers can be seen in front.

Images, UC QuakeStudies

A damaged brick building has wooden bracing holding the walls together. The photographer comments, "This building came through the September Christchurch quake with a few band aid plasters, but the February quake means that she is now DNR (Do Not Resuscitate)".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Teams of building inspectors gathered at the Linwood Service Centre before heading into the eastern suburbs en masse. Napier building inspector Gary Marshall, right, and City Council planner, Kent Wilson at a Dallington Terrace property".