Search

found 4673 results

Images, UC QuakeStudies

Paul Nicholls, a member of the University of Canterbury's E-Learning team, in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Our "techy corner", with Paul waiting for the desk-assembler to come back and put his desk together. My desk is in the corner, and Jess is on the right of the window".

Audio, Radio New Zealand

Twenty seven men and women who risked their lives to save others after the February 2011 earthquake in Christchurch have been recognised for their bravery. Joining us is a Christchurch firefighter, Paul Rodwell, one of the first on scene at the CTV building and who has been awarded a medal in the awards.

Images, UC QuakeStudies

University of Canterbury staff members are escorted by Civil Defence members in order to retrieve essential items from their offices. The photographer comments, "E-learning team after clearing their offices. Brendon Stillwell (ICTS tech helping with PCs), Antoine Monti, Susan Tull, Herbert Thomas, Paul Nicholls, Gregor Ronald, Lei Zhang, Jess Hollis".

Images, UC QuakeStudies

University of Canterbury staff members are escorted by Civil Defence members in order to retrieve essential items from their offices. The photographer comments, "E-learning team after clearing their offices. Brendon Stillwell (ICTS tech helping with PCs), Antoine Monti, Susan Tull, Herbert Thomas, Paul Nicholls, Gregor Ronald, Lei Zhang, Jess Hollis".

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "One of the saddest blocks. in Hereford Street The Occidental Hotel (208), 210, Arrow International (255 Madras Street) and St John's Church and hall. In Madras Street the CTV building and the Bedford Pub. In Cashel Street Ford motors, St Paul's Church".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Site manager Mike McKee inspects the domes to be restored".

Audio, Radio New Zealand

For over a decade, an irreplaceable ring laser has been trapped in a cavern 30m below Christchurch port hills. The Carl Zeiss laser was installed in an old World War Two bunker in 1997 until a rockfall after the 2011 Christchurch earthquake sealed the cavern. But now it's been rescued and is fully operational. Professor Jon-Paul Wells is the principal investigator on the ring laser project.

Images, Canterbury Museum

One official black and yellow coloured uniform, comprising overalls, boots, helmet, goggles, ear protectors and head light, worn by the New Zealand Fire Service Urban Search and Rescue (USAR) team in the aftermath of the 22 February 2011 earthquake. 'USAR' in yellow letters on the back of the overalls. This uniform was worn by Paul Burns, who w...

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".