Search

found 723 results

Research papers, Victoria University of Wellington

<b>Construction and Demolition (C&D) waste contributes to over 50% of New Zealand’s overall waste. Materials such as timber, plasterboard, and concrete make up 81% of the C&D waste that goes into landfills each year. Alongside this, more than 235 heritage-listed buildings have been demolished in Christchurch since the 2011 earthquakes. This research portfolio aims to find a solution to decrease C&D waste produced by demolishing heritage buildings.</b> With the recent announcement of The Cathedral of the Blessed Sacrament’s demolition, this will be another building added to the list of lost heritage in Christchurch. This research portfolio aims to bridge the relationship between heritage and waste through the recycling and reuse of the demolished materials, exploring the idea that history and heritage are preserved through building material reuse. This research portfolio mainly focuses on reducing construction and demolition waste in New Zealand, using the design of a new Catholic Cathedral as a vessel. This thesis will challenge how the construction and design industry deals with the demolition of heritage buildings and their contribution to New Zealand’s waste. It aims to explore the idea of building material reuse not only to reduce waste but also to retain the history and heritage of the demolished building within the materials.

Images, UC QuakeStudies

A digitally manipulated photograph of the Ozone Hotel's sign, leaning against a cordon fence. The photographer comments, "This sign was all that remained after the demolition of the historical Ozone Hotel, which was damaged in the Christchurch earthquakes. The sign disappeared so hopefully it will reappear at a later date in a museum. The bits of blue were the painted bricks of the hotel, which made it really stand out".

Videos, UC QuakeStudies

A video about the demolition of buildings on Victoria Street. The video includes footage of an excavator demolishing the Daily Bagel building, and an interview with Paddy Snowden from City Salvage about his work after the 4 September 2010 earthquake. It also includes an interview with Api Agsorn-Worn, owner of Victoria Thai Foods on Victoria Street, about the status of her building which she acquired six months ago.

Images, UC QuakeStudies

Twisted reinforcing rods tangled in a pile of rubble. The photographer comments, "It is a horrible sight when a transformer runs out of electricity. Anyone got any jumper cables?".

Images, eqnz.chch.2010

Hotel Grand Chancellor - Leaning 1m to the east, demolition will start about mid June and is expected to take 10 months to complete at a cost of approx NZ$10m. It will be the biggest & tallest demolition project in New Zealand. Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, ...