A photograph of the earthquake damage to The Volcano Café on London Street. The brick wall on the left side of the building has crumbled, and the bricks have spilt onto the footpath. A red sticker on the door indicates that the building is no longer safe to enter. Plywood has been used to board up the windows and wire fencing has been placed around the building as a cordon.
Damaged workshops in the Red Bus depot on Fitzgerald Avenue. The brick walls have partially crumbled. In the background is the Cathedral of the Blessed Sacrament, with its dome partly deconstructed. The photographer comments, "This photo was taken recently on Fitzgerald Avenue. Again, it's amazing how close you can get to buildings that look like they are about to collapse. In the background, you can see that work has begun to remove the dome on top of the damaged Cathedral of he Blessed Sacrament".
A photograph of the earthquake damage to the Carlton Hotel on the corner of Papanui Road and Bealey Avenue. The wall of the top storey of the building has crumbled, and bricks have fallen onto the footpath. Wire fencing, road cones, and cordon tape have been placed around the building as a cordon. Scaffolding and steel bracing can be seen against the front of the building.
A photograph of the earthquake damage to the Country Theme store on the corner of Manchester and St Asaph Streets. Sections of the second storey walls have crumbled, and the bricks have fallen onto the footpath below. Wire fences have been placed around the building as a cordon. Red stickers on the front door and the wire fence indicate that the building is not safe to enter.
A photograph of the earthquake damage to R&R Sport on the corner of Colombo and Tuam Streets. Most of the side wall has crumbled, the bricks spilling onto the footpath below. Plywood and plastic sheeting has been used to weather proof the building. Wire fencing and road cones have been placed around the building as a cordon. A cherry picker is parked on the footpath in between the building and the fence.
A photograph of the earthquake-damaged buildings and rubble on Colombo Street near the intersection of St Asaph Street. The walls of the top storey of the buildings to the left have crumbled, and bricks and other rubble have fallen onto the footpath and road below. Wire fencing and police tape have been placed across the street as a cordon. An excavator from Daniel Smith Industries Ltd is parked in front of the fence.
A local inspecting the damage to St Lukes Church after the 6.3 quake hit. For whom the bell tolls Time marches on For whom the bell tolls Take a look to the sky just before you die It's the last time you will Blackened roar, massive roar, fills the crumbling sky Shattered goal fills his soul with a ruthless cry Stranger now are his eyes to this...
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team standing in front of the earthquake-damaged Avonmore House on Hereford Street. Sections of the walls have crumbled, spilling bricks and masonry onto the footpath and street below. Many of the windows have warped, breaking the glass. USAR codes have been spray-painted on one of the columns. A red sticker taped to the door indicates that the building is unsafe to enter.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team standing in front of the earthquake-damaged Avonmore House on Hereford Street. Sections of the walls have crumbled, spilling bricks and masonry onto the footpath and street below. Many of the windows have also warped, breaking the glass. USAR codes have been spray-painted on one of the columns. A red sticker taped to the door indicates that the building is unsafe to enter.
A photograph of the earthquake damage to the Avonmore House on the corner of Hereford Street and Latimer Square. Large cracks have formed in the building, causing sections of the masonry to crumble. The windows on the Hereford Street side of the building have bent out of shape and many of the glass panes have shattered. USAR codes have been spray painted on the column next to the door. In the distance wire fencing has been placed across the street as a cordon.
The cartoon shows a desperate man representing 'Christchurch' who is clutching the end of a broken plank that protrudes from a crumbling cliff-face. He says 'Who said we're living ON the edge?!' Context - the man is suggesting that they are not On the edge but OVER it. Refers to the continuing hardships facing many Christchurch residents as earthquakes and aftershocks continue and many face large financial losses because of insurance problems. Quantity: 1 digital cartoon(s).
A photograph looking east down Cashel Street towards the intersection of Colombo Street. A section of one of the buildings on the left has collapsed and the rubble has spilled onto the street. A van has been crushed by the fallen rubble. The message, 'clear', has been spray-painted on the windscreen of the van. In the foreground signs from several shops are still on the street. There is also earthquake damage to the building on the right. Sections of this building's facade have crumbled and the bricks have spilled onto the street below, damaging the awning.
A photograph of paper hearts pegged on the cordon fence around the Chinese Methodist Church on Papanui Road. Quotes on the hearts read, "'Even though I walk through the valley of the shadow of death, I will fear no evil for you are with me.' Psalm 23", "'We can do no great things; only small things with great love.' Mother Teresa, and, "'Peace begins with a smile,' Mother Teresa". In the background, the earthquake damage to the Christchurch Chinese Methodist Church can be seen. The wall of the gable has crumbled, the bricks spilling onto the grass below.
Prime Minister John Key sits on a huge crushing ball that represents the 'IRB' (International Rugby Board) and says 'Don't listen to rumour. It's not a fait accompli yet!' The ball swings towards crumbling land which represents 'Christchurch World Cup Rights'. Context - The Government has repeatedly said its preference is to keep cup games in Christchurch and Mr Key said yesterday that it would send a "powerful message" about Christchurch, although the Government had to be realistic. "The IRB are the ultimate arbiter ... they hold their own insurance policies and they'll have their own discussions with their insurers. There's only so far New Zealand can take this." (Stuff 12 March 2011) Quantity: 1 digital cartoon(s).
A rescue worker carries the dead body of a woman out of the crumbled remains of a building. Nearby is a copy of the 'Building Code'. Context - there are questions being asked about whether some of the buildings that collapsed too readily in the Christchurch earthquake of 22 February 2011 had been subject to stringent enough building code regulations. The Department of Building and Housing said the vertical shaking in the central business district was both extreme and unusual and early indications suggest it was much more violent than designed for in the building code standards which are based on the kind of shaking expected to happen every 500 years. Quantity: 1 digital cartoon(s).
The cartoon shows three 'Redzone Girls'. The first wears a green tshirt and wears a green 'no restriction' label, the second wears a yellow tshirt and has a yellow 'Limited access' label and the third wears a red tshirt and has a red label that reads 'munted'; she also has a red and white barrier around her. The second and third of the 'girls' are in an increasing state of decrepitude. Behind them is a crumbling brick wall. Context - Christchurch prostitutes aren't letting natural disaster prevent them from plying their trade on the streets despite the dangers of aftershocks in the city. NZPC's Christchurch regional co-ordinator, Anna Reed, said it was a concern sex workers were standing in the shadow of potentially unsafe buildings as the city was shaken by aftershocks, but said the shattered CBD had "left them with no outlet". Christchurch residents are up in arms about the number of prostitutes working in their local neighbourhoods because their usual work areas are out of bounds in the 'red zone'. (Stuff 25 February 2011) Quantity: 1 digital cartoon(s).
This thesis presents the findings from an experimental programme to determine the performance and behaviour of an integrated building incorporating low damage structural and non-structural systems. The systems investigated included post-tensioned rocking concrete frames, articulated floor solutions, low damage claddings and low damage partition systems. As part of a more general aim to increase the resilience of society against earthquake hazards, more emphasis has been given to damage-control design approaches in research. Multiple low-damage earthquake resistant structural and non-structural systems have emerged that are able to withstand high levels of drift or deflections will little or negligible residual. Dry jointed connections, articulated floor solutions, low damage cladding systems and low damage drywall partitions have all been developed separately and successfully tested. In spite of the extensive research effort and the adoption in practice of the low damage systems, work was required to integrate the systems within one building and verify the constructibility, behaviour and performance of the integrated systems. The objectives of this research were to perform dynamic experimental testing of a building which incorporated the low damage systems and acquire data which could be used to dynamically validate numerical models for each of the systems. A three phase experimental programme was devised and performed to dynamically test a half-scale two storey reinforced concrete building on the University of Canterbury shaking table. The three phases of the programme investigated: The structural system only. The rocking connections were tested as Post-Tensioned only connections and Hybrid connections (including dissipators). Two different articulated floor connections were also investigated. Non-structural systems. The Hybrid building was tested with each non-structural system separately; including low damage claddings, low damage partitions and traditional partitions. The Complete building was tested with Hybrid connections, low damage claddings and low damage partitions all integrated within the test specimen. The building was designed based on a full scale prototype building following the direct displacement based design to reach a peak inter-storey drift of 1.6% in a 1/500 year ground motion for a Wellington site. For each test set up, the test specimen was subjected to a ground motion sequence of 39 single direction ground motions. Through the sequence, both the local and global behaviours of the building and integrated systems were recorded in real time. The test specimen was subjected to over 400 ground motions throughout the testing programme. It sustained no significant damage that required reparations other than crumbling of the grout pads. The average peak inter-storey drifts of the buildings were lower than the design value of 1.6%. The low damage non-structural elements were undamaged in the ground motion sequence. The data acquired from each of the phases was used to successfully validate numerical models for each of the low damage systems included in the research.