Search

found 1798 results

Images, UC QuakeStudies

The damaged Ozone Hotel on Marine Parade. Fallen bricks lie on the ground in front of the building, which is surrounded by security fencing. The photographer comments, "A bike ride to New Brighton and the beach 3 weeks after the Feb 22 quake. Roads were still very rough and under reconstruction. Some buildings are still standing. but don't look too healthy".

Images, UC QuakeStudies

An aerial photograph of the Horseshoe Lake residential area near the Avon River. The photograph has been captioned by BeckerFraserPhotos, "Burwood School is at the top right of this photograph near the intersection of Lake Terrace Road and New Brighton Road. This area is mostly zoned residential green".

Images, UC QuakeStudies

The laying of new sewers in Bridge Street, South Brighton. Road cones have been placed along the road works. Temporary road signs indicate that the current speed limit is 30 km/h. Diggers, four-wheel drive vehicles and a truck are parked beside piles of gravel and a yellow sewer pump.