Search

found 525 results

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Getting sorted. Most gear in place, still making adjustments".

Images, UC QuakeStudies

Damage to a house in Richmond. Bricks have fallen from a wall, and there is a visible gap between the foundation and the surrounding ground. The photographer comments, "The foundation and a section of the wall of the dining room have shifted and cracked. The dining room floor is very springy".

Images, UC QuakeStudies

Internal damage to a house in Richmond. A large crack in the wallboard below a window has exposed the bricks, and the skirting board has moved away from the floor. The photographer comments, "Cracks in the wall of the sunroom. This is the interior view of the crack in the previous shot".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Room 709 sofas".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Our office, Room 709".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Jess's desk. Viewed from my side of the couch".

Videos, UC QuakeStudies

A video of an interview with John Haynes, about his experiences during the 22 February 2011 earthquake. Haynes was in the Forsyth Barr building when the earthquake struck. Using his skills as trained mountain guide, Haynes belayed fourteen people down three and a half floors to safety.

Audio, Radio New Zealand

Film and TV reviewer Tamar Munch takes a look at the new US drama The Outsider, based on the Stephen King novel of the same name, and Help Is On The Way, a Kiwi documentary based on the 6.3 Christchurch earthquake and what happened to the 36 guest trapped on the top floors of the Hotel Grand Chancellor.

Images, UC QuakeStudies

A photograph of the earthquake damage to a block of buildings on Lichfield Street. The top floor of the middle building has collapsed and the rubble has spilled onto the street. A large section of the closest building has also collapsed. Most of the rubble has since been cleared from the footpath.

Images, UC QuakeStudies

A photograph of the entrance of the Crowne Plaza Hotel taken from inside the hotel. The front windows have smashed, the glass scattering across the courtyard and foyer. Sections of the ceiling have collapsed, the panels fallen onto the floor in front of the rotating doors.

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "The failed column near the south-east corner of the ground floor of the Hotel Grand Chancellor. This corner of the building slumped 700mm when this column and a nearby sheer wall failed. Scaffolding was erected all around it and then sprayed with concrete to stabilise the building".

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "The failed column near the south-east corner of the ground floor of the Hotel Grand Chancellor. This corner of the building slumped 700mm when this column and a nearby sheer wall failed. Scaffolding was erected all around it and then sprayed with concrete to stabilise the building".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Reception. This is where students used to come to enquire about support services".

Images, UC QuakeStudies

A view of the UBS building at the University of Canterbury, seen from level 7 of the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. The University Book Shop building".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. South view over trees to the hills".

Images, UC QuakeStudies

Members of the University of Canterbury's E-Learning team Jess Hollis and Alan Hoskin in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Room 709 - Jess & Alan".

Images, UC QuakeStudies

People look through the cordon fence at the corner of Colombo and Hereford Streets. On the left is the former site of Camera House, and on the right is the ANZ building, with its ground floor windows boarded up. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Research papers, University of Canterbury Library

The ultimate goal of this study is to develop a model representing the in-plane behaviour of plasterboard ceiling diaphragms, as part of the efforts towards performance-based seismic engineering of low-rise light timber-framed (LTF) residential buildings in New Zealand (NZ). LTF residential buildings in NZ are constructed according to a prescriptive standard – NZS 3604 Timberframed buildings [1]. With regards to seismic resisting systems, LTF buildings constructed to NZS3604 often have irregular bracing arrangements within a floor plane. A damage survey of LTF buildings after the Canterbury earthquake revealed that structural irregularity (irregular bracing arrangement within a plane) significantly exacerbated the earthquake damage to LTF buildings. When a building has irregular bracing arrangements, the building will have not only translational deflections but also a torsional response in earthquakes. How effectively the induced torsion can be resolved depends on the stiffness of the floors/roof diaphragms. Ceiling and floor diaphragms in LTF buildings in NZ have different construction details from the rest of the world and there appears to be no information available on timber diaphragms typical of NZ practice. This paper presents experimental studies undertaken on plasterboard ceiling diaphragms as typical of NZ residential practice. Based on the test results, a mathematical model simulating the in-plane stiffness of plasterboard ceiling diaphragms was developed, and the developed model has a similar format to that of plasterboard bracing wall elements presented in an accompany paper by Liu [2]. With these two models, three-dimensional non-linear push-over studies of LTF buildings can be undertaken to calculate seismic performance of irregular LTF buildings.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Christchurch Earthquake. Maria Romero gave birth to Lola Mae during the September 4 2010 earthquake. Romero was in a birthing pool in Christchurch Women's Hospital on the 5th floor when the earthquake struck. (L-R) Maria Romero (mother), Lola Mae Romero, Lucas Romero 2 years old and Nick Blackburn (father)".

Images, UC QuakeStudies

A photograph of the earthquake damage to a group of shops on Manchester Street. The closest shop has collapsed and the floor of the upper storey is hanging out of the side of the shop. To the left, the outer walls of the top storeys of the shops have collapsed, the bricks spilling onto the street.

Images, UC QuakeStudies

A photograph of a pile of twisted steel reinforcement and other rubble at the entrance to the Smiths City car park on Dundas Street. In the background a section of the collapsed car park has not been demolished yet. Many cars are still parked on the top floor.

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. House bar. This reception desk is not used now. A small kitchen is at the right".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Christchurch Earthquake. Maria Romero gave birth to Lola Mae during the September 4 2010 earthquake. Romero was in a birthing pool in Christchurch Women's Hospital on the 5th floor when the earthquake struck. (L-R) Maria Romero (mother), Lola Mae Romero, Lucas Romero 2 years old and Nick Blackburn (father)".

Images, UC QuakeStudies

Alan Hoskin, a member of the University of Canterbury's E-Learning team, in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Bean bag. Alan wanted the beanbag but Jess said no".