A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A design guideline which provides guidance to designers on how to carry out a whole of life evaluation of rebuild options.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.
A document which describes the purpose of the Bill Perry Safety Awards and outlines each winning submission.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
A consent granted by Environment Canterbury, providing consent to discharge water and contaminants to water.
A document which explains the rationale behind and development of City Care's Good to Go safety video.
A document which outlines the processes involved in the Multi Criteria Analysis Asset Prioritisation tool. It also talks about assumptions made and potential gaps.
A map showing the actual construction start dates.
A document which summarises each winning Bill Perry Safety Award submission.
A paper written by Paul S Botha and Eric Scheepbouwer for the Transportation Research Record: Journal of the Transportation Research Board, No. 2504, Transportation Research Board, Washington, D.C., 2015, pp. 66-72.
A pdf copy of a presentation delivered at Building a Better New Zealand (BBNZ 2014) Conference. The presentation examines the relationship between innovation and productivity improvement in the construction industry.
A pdf copy of a spreadsheet tool used by designers to undertake a whole of life evaluation of rebuild options.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A pdf copy of a PowerPoint presentation prepared for the Australia New Zealand Geotechnical Engineering Conference.
A paper prepared for the Bulletin of the New Zealand Society for Earthquake Engineering, Vol. 44, no. 4, December 2011.
A diagram which shows outputs from PDAT (with explanations).
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
A paper describing the procedure and challenges associated with installing anchors through gabion baskets.
A diagram which shows outputs from PDAT calibration/validation (with explanations).
A document which details the structure, roles and terms of reference for the Client Governance Group (CGG).
A diagram which illustrates the proposed structure of an industry-wide training advisory board.