Search

found 485 results

Images, UC QuakeStudies

Members of the Disaster Assistance Response Team outside the US headquarters in Latimer Square. Latimer Square was set up as a temporary headquarters for emergency management personnel after the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph submitted by Philip Broderick Willis to the QuakeStories website. The description reads, "Timaru Welfare Centre – Set up for EQ evacuees. Thought it was a little unfortunate that the only suitable venue there had a spring-loaded floor! Still, they were so welcoming and wonderful. It was such a relief to be there.".

Images, UC QuakeStudies

A photograph of the south side of the ChristChurch Cathedral, taken from the edge of Cathedral Square. Scaffolding has been set up against one of the walls and a turret has been removed from the building and is now situated in a secure holding on the grass in front.

Images, UC QuakeStudies

Al Dwyer, and members of the Disaster Assistance Response Team (DART) outside their headquarters in Latimer Square. Latimer Square was set up as a temporary headquarters for emergency management personnel after the 22 February 2011 earthquake.

Images, UC QuakeStudies

LCPL Ryan Dempsey, from the 3rd Catering and Supply Company, photographed in the NZ Army's decontamination area. The area was set up after the 22 February 2011 earthquake in order to decontaminate equipment used in Operation Christchurch Quake. In the background is a sign reading, 'Contaminated overalls'.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Local relief: Waimakariri District Mayor Ron Keating (left) receives a cheque for $100,000 from MainPower managing director Allan Berge at the Civil Defence headquarters set up in council's chambers. The money is targeted for Waimakariri families who have been hard hit by the earthquake".

Images, UC QuakeStudies

A photograph of mattresses in Cowles Stadium, still in their plastic wrapping waiting to be unwrapped. The stadium was set up as a Civil Defence Report Centre after the 4 September 2010 earthquake and the mattresses were to be used as beds for those displaced by the earthquake.