Search

found 1299 results

Articles, UC QuakeStudies

A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012. Note that personal details of key personnel have been removed from this document.

Articles, UC QuakeStudies

A document containing examples of items provided in a folder for businesses. These are taken to the initial face-to-face meeting with business owners to discuss the impact and disruption of upcoming SCIRT rebuild works.

Articles, UC QuakeStudies

A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.

Images, UC QuakeStudies

Prime Minister John Key preparing for a photograph with members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. Canterbury Recovery Minister Jerry Brownlee is standing behind him.

Images, UC QuakeStudies

Members of USAID Disaster Assistance Response Team (DART) being briefed after their early-morning arrival from Los Angeles. The 80-person DART team arrived in Christchurch to assist local authorities after the 22 February 2011 earthquake.

Images, UC QuakeStudies

Members of the USAID Disaster Assistance Response Team (DART) and New Zealand Urban Search and Rescue breaking through the floor of a building which was severely damaged during the 22 February 2011 earthquake.