Monday 16 April 2012. File reference: CCL-2012-04-16-IMG_1688 From the collection of Christchurch City Libraries.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
The ground floor of the Central Library on Gloucester Street. Books have fallen off the shelves and are in piles in the aisles.
Photograph captioned by BeckerFraserPhotos, "The Central Christchurch City Library at 91 Gloucester Street".
Photograph captioned by BeckerFraserPhotos, "The Central Christchurch City Library at 91 Gloucester Street".
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
PWS-2010-12-09-05552
Monday 16 April 2012. File reference: CCL-2012-04-16-IMG_1684 From the collection of Christchurch City Libraries.
Monday 16 April 2012. File reference: CCL-2012-04-16-IMG_1685 From the collection of Christchurch City Libraries.
Demolition underway on a walk around the city to catch up on events happening June 25, 2014 Christchurch New Zealand.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
None
Canterbury Public Library viewed from near the Bridge of Rememberance,
Christchurch "New Zealand" architecture building "Demolition of old Millers building" demolition detail rubbleDemolition started on the old Millers building on a walk around Christchurch May 6, 2013 New Zealand. The building was originally designed in 1935 by G. A. Hart for the retail store, factory and warehouse Millers and was completed in 19...
None
None
None
None
None
None
None
None
None
None
None
None
None