An image from an Air Force News April 2011 article titled, "Helping Hand for Lyttelton Museum". The image depicts the damaged Lyttelton Museum with a broken top wall and wire fencing around the building.
Members of the USAID Disaster Assistance Response Team (DART) and the New Zealand Urban Search and Rescue, breaking through the floor of a building which was severely damaged during the 22 February 2011 earthquake.
A photograph of the Durham Street Methodist Church blocked off by wire fencing. The top right corner of the building is damaged and some of the masonry has fallen onto to the footpath below.
Photograph captioned by Fairfax, "Furniture maker Bertram Rush and his building survived the earthquake. He's still open, hearing from people with damaged cabinets, and has been busy helping a customer to repair his home".
A tent on Worcester Street set up for the soldiers stationed around the cordon. In the background, the damaged Our City O-Tautahi Building can be seen with steel bracing holding up the front.
On 4 September 2010, a magnitude Mw 7.1 earthquake struck the Canterbury region on the South Island of New Zealand. The epicentre of the earthquake was located in the Darfield area about 40 km west of the city of Christchurch. Extensive damage was inflicted to lifelines and residential houses due to widespread liquefaction and lateral spreading in areas close to major streams, rivers and wetlands throughout Christchurch and Kaiapoi. Unreinforced masonry buildings also suffered extensive damage throughout the region. Despite the severe damage to infrastructure and residential houses, fortunately, no deaths occurred and only two injuries were reported in this earthquake. From an engineering viewpoint, one may argue that the most significant aspects of the 2010 Darfield Earthquake were geotechnical in nature, with liquefaction and lateral spreading being the principal culprits for the inflicted damage. Following the earthquake, an intensive geotechnical reconnaissance was conducted to capture evidence and perishable data from this event. This paper summarizes the observations and preliminary findings from this early reconnaissance work.
During the Christchurch earthquake of February 2011, several midrise buildings of Reinforced Concrete Masonry (RCM) construction achieved performance levels in the range of life safety to near collapse levels. These buildings were subjected to seismic demands higher than the building code requirements of the time and higher than the current New Zealand Loadings Standard (NZS-1170.5:2004). Structural damage to these buildings has been documented and is currently being studied to establish lessons to be learned from their performance and how to incorporate these lessons into future RCM design and construction practices. This paper presents a case study of a six story RCM building deemed to have reached the near collapse performance level. The RCM walls on the 2nd floor failed due to toe crushing reducing the building’s lateral resistance in the east-west direction. A nonlinear dynamic analysis on a 3D model was conducted to simulate the development of the governing failure mechanism. Preliminary analysis results show that the damaged walls were initially under large compression forces from gravity loads which caused increase in their lateral strength and reduced their ductility. After toe crushing failure developed, axial instability of the model was prevented by a redistribution of gravity loads.
Base isolation is an incredibly effective technology used in seismic regions throughout the world to limit structural damage and maintain building function, even after severe earthquakes. However, it has so far been underutilised in light-frame wood construction due to perceived cost issues and technical problems, such as a susceptibility to movement under strong wind loads. Light-frame wood buildings make up the majority of residential construction in New Zealand and sustained significant damage during the 2010-2011 Canterbury earthquake sequence, yet the design philosophy has remained largely unchanged for years due to proven life-safety performance. Recently however, with the advent of performance based earthquake engineering, there has been a renewed focus on performance factors such as monetary loss that has driven a want for higher performing residential buildings. This research develops a low-cost approach for the base isolation of light-frame wood buildings using a flat-sliding friction base isolation system, which addresses the perceived cost and technical issues, and verifies the seismic performance through physical testing on the shake table at the University of Canterbury. Results demonstrate excellent seismic performance with no structural damage reported despite a large number of high-intensity earthquake simulations. Numerical models are subsequently developed and calibrated to New Zealand light-frame wood building construction approaches using state-of-the-art wood modelling software, Timber3D. The model is used to accurately predict both superstructure drift and acceleration demand parameters of fixed-base testing undertaken after the base isolation testing programme is completed. The model development allows detailed cost analyses to be undertaken within the performance based earthquake engineering framework that highlights the monetary benefits of using base isolation. Cost assessments indicate the base isolation system is only 6.4% more compared to the traditional fixed-base system. Finally, a design procedure is recommended for base isolated light-frame wood buildings that is founded on the displacement based design (DBD) approach used in the United States and New Zealand. Nonlinear analyses are used to verify the DBD method which indicate its suitability.
Tents set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.
Tents set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.
The Oxford Terrace Baptist Church with cracks on the front facade. Bracing has been placed under the roof and at the front of the church to support the building and limit further damage from aftershocks.
The Oxford Terrace Baptist Church with cracks on the front facade. Bracing has been placed under the roof and at the front of the church to support the building and limit further damage from aftershocks.
A photograph of the earthquake damage to the Cranmer Centre on the corner of Montreal and Armagh Streets. The front wall of the building has crumbled, and the bricks have spilt onto the pavement below.
A photograph of SPCA Wellington vehicles parked on the intersection of Lichfield and Manchester Streets after the 22 February 2011 earthquake. In the background, the earthquake damage to the Tower Chambers building can be seen.
Tents set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.
Provides a map, the geological background, describes the effects, both in Christchurch and its surrounding areas, the damage to notable buildings, the financial exposure, the emergency response and relief efforts and the media coverage of the earthquake.
A digital copy of a painting by Julia Holden. The painting is of Lichfield Street, looking east from the intersection of Colombo Street. The road has been fenced off and there are damaged buildings in the background.
A remote-operated digger has started work on Christchurch Cathedral removing rubble from the historic building. It's a job project managers are describing as a world first - and a significant breakthrough in the clean up of Christchurch's earthquake damaged Cathedral. Adam Burns reports.
A view of Colombo Street, looking north from Kilmore Street. Many of the buildings on the left side have been demolished, and on the right they are badly damaged. Piles of gravel have been heaped on the side of the road.
A tent set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.
Structural damage to St Elmo Courts with diagonal cracks between the windows of the building. These cracks show that there has been rocking of the masonry piers which means there is no vertical reinforcement provided in the walls.
A photograph of an earthquake damaged building on Armagh Street with a tarpaulin draped over the roof. In the distance, a pile of bricks have been laid on the road in front of the Cranmer Centre.
Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Historic buildings around Christchurch received varying degrees of damage. The Arts Centre at the Worcester/Montreal corner where strengthening has worked".
Looking into Cathedral Square from the corner of Cambridge Terrace and Worcester Boulevard. On the left is the damaged former Municipal Chambers, a historic Queen Anne building on the intersection of Worcester Boulevard and Oxford Terrace. On the right is the Clarendon Tower.
A photograph looking south-west along Williams Street, from the Williams Street bridge, in Kaiapoi. In the distance is the rebuilt Blackwell's Department Store. The department store was rebuilt after the previous building was damaged in the 2010 and 2011 Canterbury earthquakes.
A photograph of the rebuilt Blackwell's Department Store on the corner of Williams Street and Raven Quay in Kaiapoi. The department store was rebuilt after the previous building was damaged in the 2010 and 2011 Canterbury earthquakes.
Canterbury Earthquake 04/09/10 Christchurch New Zealand
By closely examining the performance of a 22-storey steel framed building in Christchurch subject to various earthquakes over the past seven years, it is shown that a number of lessons can be learnt regarding the cost-effective consideration of non-structural elements. The first point in this work is that non-structural elements significantly affected the costs associated with repairing steel eccentrically braced frame (EBF) links. The decommissioning or rerouting of non-structural elements in the vicinity of damaged links in the case study building attributed to approximately half the total cost of their repair. Such costs could be significantly reduced if the original positioning of non-structural elements took account of the potential need to repair the EBF links. The second point highlighted is the role that pre-cast cladding apparently played on the distribution and type of damage in the building. Loss estimates obtained following the FEMA P-58 framework vary considerably when cladding is or isnt modelled, both because of changes to drift demands up the height of the building and because certain types of subsequent damage are likely to be cheaper to repair than others. Finally, costly repairs to non-structural partition walls were required not only after the moment magnitude 7.1 earthquake in 2010 but also in multiple aftershocks in the years that followed. Repair costs associated with aftershock events exceeded those from the main event, emphasizing the need to consider aftershocks within modern performance-based earthquake engineering and also the opportunity that exists to make more cost-effective repair strategies following damaging earthquakes.
A digitally manipulated image of Michael Parekowhai's scuplture 'On First Looking into Chapman's Homer' on Madras Street. The photographer comments, "One of the two bulls on pianos by Michael Parekowhai called 'On First Looking into Chapman's Homer'. They have been placed on the site of a building that was demolished after earthquake damage.
Forbes' Store on Norwich Quay with a broken awning and damage visible on the brick walls. Scaffolding placed around the building since the 4 September 2010 earthquake has tumbled during the 22 February 2011 earthquake.